1.0 PURPOSE
To document the methodology followed at XXX to describe controls associated with the servicing of products. This is an important element of a QMS, which is the set of policies, procedures, and process used to ensure the requirements associated with the quality of a product are met.
2.0 SCOPE
This procedure is applicable to all the following systems and standards
- API Spec Q1, 9th edition/ ISO 29001: 2020
- API Spec …
- API Spec …..
- API Spec …..
- API Spec ….
- API Spec …..
3.0 RESPONSIBILITY
- Machine shop Manager
- Operations Engineer
- QA/QC Engineer
- All concerned process heads
4.0 INPUTS
- Production & Quality plan
- Customer specifications/requirements
- Standard specifications/requirements
- Procedures/Work Instructions
- Drawings
5.0 RESOURCES
- Raw Material/Consumables
- Equipments, M&M Resources
- XXX Procedures/Work instructions
- Competent Manpower
6.0 PROCEDURE
XXX maintains a documented procedure that describes controls associated with the servicing of products
- Review and implementation of the XXX’s customer-specific, product servicing, and other servicing requirements. Such requirements will be mentioned in the Customer PO or confirmed by XXX and the details are mentioned in the contract review and Quotations.
- The availability and use of suitable servicing, testing, monitoring, and measurement equipment (Refer Master list of Monitoring and Measuring equipment)
- The availability of work instructions (Refer Master list of Work Instruction and Quality Internal Procedure (Refer Master list of QIPs)
- Ensuring identification and traceability requirements are maintained throughout the servicing process;
- The implementation of monitoring and measurement activities through Production and Quality Plan
- Process control documents are maintained; and
- Requirements for release of the product that was serviced are verified.
7.0 OUTPUTS
- Completed Production & Quality plan
- Final inspection reports
- Finished product
- Release note
- Data Book/Documentation
8.0 KEY PERFORMANCE INDICATORS
- Planned vs Actual completion- 100%
- No rejections/reworks
9.0 ASSOCIATED DOCUMENTS & RECORDS
DESCRIPTION | FORMAT NUMBER | RESPONSIBILITY |
Master list of Products | XXX / PRD / D01 | Machine shop Manager |
Master List of Quality Internal Procedure | XXX / MR / D08 | Management Representative |
Master List of Work Instructions | XXX / MR / D11 | Management Representative |
Skill Competence matrix | XXX / HR / D02 | HR Manager |
Master list of M&M Equipment | XXX / QA / D02 | QA/QC Engineer |
Master list of Machines | XXX / MNT / D01 | Machine shop Manager |
Master list of Handling Equipment | XXX / MNT / D02 | Machine shop Manager |
Master list of Pumps | XXX / MNT / D04 | Machine shop Manager |
Master list of Test Stumps | XXX / MNT / D05 | Machine shop Manager |
Master list of Blind Flanges | XXX / MNT / D06 | Machine shop Manager |
Daily Work Control and Time Sheet | XXX / PRD / D02 | Machine shop Manager |
Weld Record Sheet | XXX / PRD / D03 | Operations Engineer |
Electrode Baking Details | XXX / PRD / D04 | Operations Engineer |
Production & Quality Plan | XXX / QA / 01 | Machine shop Manager |