The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Design and Development dept. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.
1.Design & Development – Cross Functional Team
Job No. : Record No. :
Product :
The following are the team members participating in the design and development process
Sl. No. | Name | Process | Qualification | Experience |
---|---|---|---|---|
2. Design & Development Plan
Sr. No. | Stages | Source | Requirements | Responsibility | Target date of completion | Actual date of completion | Review |
1 | Design & development plan | Customer & Standard requirements | |||||
2 | Input | Customer PO / Contract Review | |||||
Applicable Statutory requirements (Legal) | |||||||
Required Product Specification | |||||||
API Spec requirements Scope | |||||||
Size & Material designations | |||||||
Service Conditions | |||||||
Methodology , assumptions and formulae documentation | |||||||
Requirements for Manufacturing process | |||||||
Risk Assessment & Management | |||||||
Resources | |||||||
API Monogram requirements | |||||||
3 | Output | Applicable Statutory requirements | |||||
Methodology, assumptions and formulae documentation | |||||||
Material qualification requirements | |||||||
Dimensions and Design acceptance criteria | |||||||
Identification of products of components deemed critical to design | |||||||
Special characteristics for safe and proper use | |||||||
Risk Assessment & Management | |||||||
Appropriate information for Purchasing | |||||||
Requirements for Manufacturing Process | |||||||
Verification, Validation and Testing processes | |||||||
API Monogram requirements | |||||||
4 | Review | Product Requirements | |||||
Legal Requirements | |||||||
Dimensional requirements and Critical components | |||||||
Material Requirements | |||||||
Purchasing Requirements | |||||||
Manufacturing Requirements including Traceability | |||||||
Testing Requirements | |||||||
Verification and Validation requirements | |||||||
Risk assessments | |||||||
API Monogram requirements | |||||||
5 | Verification & Final Review | Alternate calculations | |||||
Inspection Reports | |||||||
Surface NDE Reports ( | |||||||
Hardness Test Report | |||||||
Dimensional Report | |||||||
6 | Validation & Approval | Test | |||||
7 | Control of Changes | Engineering changes | |||||
8 | API Monogram Marking | API Monogram Marking procedure |
3. Design & Development input
SR.NO | DESIGN INPUTS REQUIREMENTS | RESPONSIBILITY | DESIGN INPUTS |
1 | Customer Requirements Customer PO | ||
2 | Contract review | ||
3 | Applicable Statutory requirements | ||
4 | Required Product Specification | ||
1) | |||
2) | |||
3) | |||
Service conditions | |||
5 | Material Designations | ||
6 | Methodology , assumptions and formulae documentation | ||
7 | Historical performance and other information derived from previous similar designs | ||
8 | Requirements for Manufacturing process | ||
9 | Testing & verification | ||
10 | Validation | ||
11 | Results of Risk Assessments | ||
12 | Availability of Raw Material | ||
13 | Resources applicable for manufacturing | ||
14 | Special resources required | ||
15 | API Monogram Requirements |
4. Design & Development Review
Doc No. : | PRODUCT: | Planned Dt. | |||
PROJECT NO.: | Part No. : | Actual Dt. | |||
CUSTOMER: | Rev No. | ||||
* After contract review | |||||
PARTICIPANTS | DEPARTMENT | SIGNATURE | |||
POINTS CONSIDERED FOR THE REVIEW | |||||
Review on Customer specific requirements identified in the contract review checklist | |||||
Product description | |||||
Methodology, assumptions and formulae documentation | |||||
Results of calculations | |||||
Historical Performance and information derived from previous Similar design | |||||
Verification of dimensional measurements and acceptance criteria | |||||
Are tolerances compatible with accepted manufacturing standards | |||||
Identify products or Components deemed critical to Design | |||||
Special characteristics for safe and proper use | |||||
Requirements for Manufacturing process | |||||
Traceability requirements | |||||
Technical Requirements including test methods, requirements for Verification and acceptance criteria | |||||
Functional requirements including validation of product manufactured and acceptance criteria | |||||
Is the specified test sampling size and / or frequency feasible | |||||
If required, has customer approval been obtained for test equipment | |||||
Environmental condition, in which the test is to be performed. | |||||
Availability of Machines/Equipments/Tools | |||||
Availability of Procedures / other documentation | |||||
Applicable Statutory requirements | |||||
Results of Risk Assessments | |||||
Any other points to be considered? | |||||
Prepared by | Reviewed by | Approved by | |||
Name | Name | Name | |||
Sign | Sign | Sign | |||
Date | Date | Date |
5. Design & Development output
Record No. : Part No. :
Job No : Date & Rev No. :
Description :
SR.NO | DESIGN OUTPUT REQUIREMENTS | RESPONSIBILITY | DESIGN OUTPUTS |
1 | Product Specification | ||
2 | Applicable Statutory requirements | ||
3 | Methodology, assumptions and formulae documentation including Historical performance and other information as applicable | ||
4 | Drawings including the Design acceptance criteria | ||
5 | Identification of products of components deemed critical to design | ||
6 | Special characteristics for safe and proper use | ||
7 | Bill of Materials | ||
8 | Results of Risk Assessments | ||
9 | Approved list of Critical Suppliers, Selection of suppliers | ||
10 | Raw Material | ||
11 | Requirements for Manufacturing process, Testing & verification | ||
12 | Quality & Production Plan | ||
13 | Traceability marking like Heat number & Serial number | ||
14 | Machining as per Requirements | ||
15 | Welding Operations in accordance with SOS approved WPSs | ||
16 | NDE(MT, Hardness testing and PT on ring grooves) | ||
17 | Verification, Validation & Testing Methods | ||
18 | API Monogram requirements | ||
19 | Availability of resources – Machines/Equipments | ||
20 | Procedures / Work Instructions/ Operational Control Procedure (Procedures) | ||
22 | Special resources required |
Prepared by | Reviewed by | Approved by | |||
Name | Name | Name | |||
Sign | Sign | Sign | |||
Date | Date | Date |
6. Design Verification and Final Review
Part No.: | Part Name: | Record No.: | Date & Rev No.: | |||
Job / WO / Project No.: | Sl. No.: | |||||
DESIGN VERIFICATION | ||||||
S.No. | REQUIREMENT | INPUT | OUTPUT | REMARKS | ||
1 | Required Product Specification, | |||||
2 | Material Designations | |||||
3 | Methodology , assumptions and formulae documentation | |||||
4 | Requirements for Manufacturing process | |||||
5 | Testing & verification | |||||
6 | API Monogram Requirements | |||||
TECHNICAL VERIFICATION | ||||||
S.No. | STAGE DESCRIPTION | SPECIFICATION | VERIFICATION METHOD | RESULT | REMARKS | |
1 | Raw Material Inspection | |||||
2 | Material Composition | |||||
3 | Material Mechanical Properties | |||||
4 | NDT | |||||
5 | Finished component verification | |||||
6 | NDT | |||||
7 | Special Compliance | |||||
Prepared by: | Checked by: | Approved by: | ||||
Name: | Name: | Name: | ||||
Sign: | Sign: | Sign: | ||||
Date: | Date: | Date: | ||||
Issue / Rev No.: 02 / 03 Rev. Date:14-11-2019 |
7. Transmittal
From: | Department: | ||||||
Project: | |||||||
To: | Department: | ||||||
Please find attached herewith the following documents for: | |||||||
[ ] I (information) | [ ] A (Approval) | [ ] C (Construction) | |||||
[ ] N (With our comments) | [ ] R (Revision) | [ ] N (With our comments) | |||||
[ ] T (To be returned with your comments) | [ ] V (Revised according to your comments) | [ ] X __________________ | |||||
No | Documents transmitted: | Description | Revision | No. Copies | Format | ||
1 | .dwg / .pdf | ||||||
2 | .dwg / .pdf | ||||||
3 | .dwg / .pdf | ||||||
4 | .dwg / .pdf | ||||||
5 | .dwg / .pdf | ||||||
6 | .dwg / .pdf | ||||||
7 | .dwg / .pdf | ||||||
8 | .dwg / .pdf | ||||||
9 | .dwg / .pdf | ||||||
10 | .dwg / .pdf | ||||||
11 | .dwg / .pdf | ||||||
Please return a signed copy of the present transmittal for acknowledgement. | |||||||
Signature: | |||||||
Department: | Department: | ||||||
Iss.No./Date:xx/xx.xx.xxxx | |||||||
Rev.No/Rev.Date:xx/xx.xx.xxxx |
8. Design & Development validation
Part No.: | Job / WO / Project No.: | Record No.: | |
Part Name: | Sl. No.: | DATE & REV No.: | |
Description | Observations and review | Reviewed by | Remarks |
1. Prototype tests | |||
Performance test certificate | |||
Mechanical test | |||
Hardness test | |||
2. Functional and/or operational tests of production products | |||
Pressure test certificated | |||
Any other test | |||
3. Tests specified by industry standards and/or regulatory requirements | |||
Reference Standard: | |||
Test description | |||
4. Field performance tests and reviews | |||
Field performance test result if any | |||
Prepared by: | Checked by | Approved by: | |
Name: | Name: | Name: | |
Sign: | Sign: | Sign: | |
Date: | Date: | Date: | |
Issue: xx, Rev. No.: xx Issue / Rev. No Date: xx-xx-xxxx / xx-xx-xxxx |
9. Document Progress Register (DPR)
ID | Department | Discipline | Documents transmitted | Description | Rev. | Sheet | Format | Remark |
---|---|---|---|---|---|---|---|---|
Iss.No./Date: xx/xx.xx.xx | ||||||||
Rev.No/Rev.Date: xx/xx.xx.xx |
10. Design Change Note
REQUEST NUMBER: | DRAWING / SPEC / TECHNICAL DOCUMENT NO.: | DATE: | ||
CHANGE NUMBER: | DRAWING / SPEC / TECHNICAL DOCUMENT DESCRIPTION: | |||
DESCRIPTION OF CHANGE: | ||||
REASON FOR REQUEST: | ||||
1. CUSTOMER | ||||
2. PROCESS IMPROVEMENT | ||||
3. PRODUCT IMPROVEMENT | ||||
4. SUPPLIER | ||||
5. ERROR | ||||
STOCK DISPOSITION: | ||||
1. USE “AS-IS” | ||||
2. SCRAP | ||||
3. REWORK | ||||
4. N/A | ||||
COPIES OF ECN TO BE DISTRIBUTED TO: | ||||
1. PURCHASING | ||||
2. QUALITY ASSURANCE | ||||
3. OPERATIONS | ||||
4. STORES | ||||
5. QUALITY CONTROL | ||||
6. OTHER (SPECIFY) | ||||
COMMENTS: | ||||
CHANGE EFFECTS THE FOLLOWING WORK ORDERS: | ||||
Requested By: | Reviewed by: | Approved By: | ||
Iss.No./Date: xx/xx.xx.xx Rev.No/Rev.Date: xx/xx.xx.xx |