ISO 21502:2020 Clause 6.2 Pre-project activities

The purpose of the pre-project activities is for the sponsoring organization to verify the project is worth starting. The pre-project activities are those activities that should be accomplished leading up to a decision to initiate a project. Identified needs and opportunities, resulting from the organizational strategy or business requirements, should be evaluated to enable senior management, such as organizational management, portfolio management or programme management, to identify potential projects that can transform some or all these needs and opportunities into realized benefits. These needs and opportunities can address, for example, a new market demand, a current organizational need or a new legal requirement. The needs and opportunities should be evaluated before formal authorization to initiate a new project.
The project’s objectives, benefits, rationale and investment should be justified and documented in sufficient detail to enable a decision to be made on whether to initiate a project. Such documentation can be used to enable the prioritization of needs and opportunities. This prioritization can relate to:
a) some aspect of the organization’s strategy or business plan;
b) higher-level programme or portfolio needs;
c) customer’s needs.
The purpose of such justification is to obtain organizational commitment and authorization for investment in the selected project together with an understanding of the constraints, risks and assumptions.
NOTE The justification for initiating the project can be defined in documents such as terms of reference, a brief, a proposal or a preliminary business case.
An evaluation should be undertaken to determine if the project should be undertaken at the organization, portfolio or programme level. Such an evaluation should be based on multiple criteria, such as quantitative, qualitative and financial criteria, alignment to organizational strategy, sustainability and social and environmental impact. Criteria are likely to differ among different organizations, portfolios, programmes and projects, depending on the context.

Prior to authorizing the initiation of the project, the sponsoring organization should:
— identify the project sponsor and the project manager, and define their initial responsibilities and authorities;
— define initial governance arrangements;
— determine whether the organization has resources and funding for the whole project, or at least for the first phase and believes it can secure the additional funding for the rest of the project.

Pre-project activities are crucial steps that occur before the formal initiation of a project. These activities are focused on setting the stage for a successful project by defining its purpose, scope, and feasibility. Here are key pre-project activities in the context of project management:

  1. Strategic Planning: Align the project with the organization’s strategic goals and objectives. Ensure that the project contributes to the overall mission and vision of the organization.
  2. Feasibility Studies: Conduct feasibility studies to assess the viability and practicality of the project. This includes evaluating technical, economic, legal, operational, and scheduling factors to determine if the project is worth pursuing.
  3. Project Identification and Selection: Identify potential projects and select those that align with organizational priorities. Evaluate projects based on criteria such as return on investment, strategic alignment, and resource availability.
  4. Project Charter Development: Develop a project charter that serves as the project’s foundational document. The charter includes key information such as project objectives, scope, stakeholders, constraints, and initial budget estimates.
  5. Stakeholder Analysis: Identify and analyze stakeholders who will be affected by or have an impact on the project. Understand their interests, expectations, and potential influence on the project.
  6. Risk Identification: Begin identifying potential risks that could impact the project. Consider both internal and external factors that may pose a threat or present opportunities for the project.
  7. Initial Budgeting: Develop an initial budget estimate for the project. This includes an overview of anticipated costs based on the project charter and initial scope definition.
  8. Project Selection and Prioritization: Evaluate and prioritize potential projects based on criteria such as strategic fit, financial viability, and resource availability. This step involves selecting projects that align with organizational objectives and priorities.
  9. Formal Approval: Obtain formal approval to proceed with the project based on the project charter. This approval is typically secured from organizational leadership or a governance body responsible for project approval.
  10. High-Level Planning: Conduct high-level planning to outline the initial project approach. This includes identifying key milestones, deliverables, and a rough project schedule.
  11. Initial Resource Identification: Identify and assess the availability of key resources, including personnel, equipment, and materials. Ensure that the necessary resources can be allocated to the project.
  12. Communication Plan Development: Develop an initial communication plan outlining how information will be shared with stakeholders. Establish communication channels and methods for keeping stakeholders informed.
  13. Project Kick-Off Preparation: Prepare for the formal kick-off of the project. This may involve organizing a kick-off meeting, assembling the project team, and ensuring that key stakeholders are aware of the project’s initiation.
  14. Document Lessons Learned from Similar Projects: If applicable, review and document lessons learned from similar past projects. This helps in avoiding common pitfalls and leveraging successful practices.

These pre-project activities are essential for laying the groundwork for a successful project by ensuring that the project aligns with organizational objectives, is feasible, and has the necessary support and resources for initiation

The purpose of the pre-project activities is for the sponsoring organization to verify the project is worth starting.

The primary purpose of pre-project activities is to enable the sponsoring organization to assess and verify whether the proposed project is worth starting. These activities are geared towards evaluating the feasibility, viability, and alignment of the project with organizational goals. The purpose of pre-project activities is to provide the sponsoring organization with the information and assurance needed to make an informed decision about whether the proposed project is worth starting. This decision is based on careful assessments of feasibility, strategic alignment, risks, and potential benefits. Here’s how pre-project activities serve this purpose:

  1. Feasibility Assessment: Pre-project activities include feasibility studies to assess the practicality and viability of the project. This involves evaluating technical, economic, legal, operational, and scheduling factors to ensure the project can be successfully executed.
  2. Strategic Alignment: The sponsoring organization uses pre-project activities to verify whether the proposed project aligns with the strategic goals and objectives of the organization. This ensures that the project contributes to the overall mission and vision.
  3. Stakeholder Analysis: Identifying and analyzing stakeholders during pre-project activities helps the organization understand the level of support and potential challenges the project may face. This information is crucial for assessing the project’s overall worth.
  4. Risk Identification: Early identification of potential risks is a key component of pre-project activities. The organization assesses the risks to determine if they are manageable and if the potential rewards outweigh the risks.
  5. Project Charter Development: The development of a project charter during pre-project activities helps in clearly defining the project’s purpose, objectives, scope, and initial constraints. This document provides a foundation for the organization to evaluate the project’s worth.
  6. Initial Budgeting: Pre-project activities involve developing an initial budget estimate, allowing the organization to assess whether the financial investment required aligns with the expected returns and benefits.
  7. Project Selection and Prioritization: The organization evaluates multiple project options during pre-project activities and selects projects that align with its priorities and offer the most value. This selection process verifies that the chosen project is worth pursuing.
  8. Formal Approval: The culmination of pre-project activities often involves seeking formal approval to proceed with the project. This step ensures that organizational leadership or a governance body reviews and verifies that the project is worth starting.
  9. High-Level Planning: High-level planning during pre-project activities provides an overview of the project approach and milestones. This helps the organization assess whether the project is realistically achievable within the defined constraints.
  10. Communication Plan Development: Developing an initial communication plan allows the organization to outline how information about the project will be communicated. This helps in ensuring transparency and alignment with organizational communication strategies.
  11. Project Kick-Off Preparation: Preparing for the project kick-off includes assembling the project team and ensuring that key stakeholders are aware of the project’s initiation. This step signifies the organization’s commitment to moving forward with the project.

The pre-project activities are those activities that should be accomplished leading up to a decision to initiate a project.

Pre-project activities are those tasks and processes that are carried out leading up to the formal decision to initiate a project. These activities are critical for gathering information, assessing feasibility, and ensuring that the organization is well-prepared to commit resources to the project.The completion of these pre-project activities provides the sponsoring organization with the necessary information and confidence to make an informed decision about whether to initiate the project. These activities are essential for setting the stage for a successful project by ensuring that it is well-defined, feasible, and aligned with organizational objectives. Here’s a brief summary of the key aspects of pre-project activities:

  1. Feasibility Assessment: Conducting studies to evaluate the feasibility of the proposed project, including technical, economic, legal, operational, and scheduling considerations.
  2. Strategic Alignment: Ensuring that the project aligns with the strategic goals and objectives of the organization. This involves verifying that the project contributes to the overall mission and vision.
  3. Stakeholder Analysis: Identifying and analyzing stakeholders to understand their interests, expectations, and potential impact on the project. This information is crucial for planning and decision-making.
  4. Risk Identification: Identifying and assessing potential risks associated with the project. This includes evaluating both internal and external factors that may pose threats or present opportunities.
  5. Project Charter Development: Creating a project charter that outlines the purpose, objectives, scope, stakeholders, and initial constraints of the project. The charter serves as a foundational document for decision-making.
  6. Initial Budgeting: Developing an initial budget estimate to assess the financial aspects of the project and ensure that it aligns with the organization’s financial capacity.
  7. Project Selection and Prioritization: Evaluating and prioritizing potential projects based on criteria such as strategic fit, financial viability, and resource availability. This step involves selecting projects that align with organizational objectives.
  8. Formal Approval: Seeking formal approval from organizational leadership or a governance body to move forward with the project. This approval signifies commitment and support for the project.
  9. High-Level Planning: Conducting high-level planning to outline the initial project approach. This includes identifying key milestones, deliverables, and a rough project schedule.
  10. Communication Plan Development: Developing an initial communication plan that outlines how information about the project will be communicated. This ensures transparency and effective communication with stakeholders.
  11. Project Kick-Off Preparation: Preparing for the formal kick-off of the project by organizing meetings, assembling the project team, and ensuring that stakeholders are aware of the project initiation.

Identified needs and opportunities, resulting from the organizational strategy or business requirements, should be evaluated to enable senior management, such as organizational management, portfolio management or programme management, to identify potential projects that can transform some or all these needs and opportunities into realized benefits.

The process involves a strategic and systematic approach to identifying, evaluating, and transforming organizational needs and opportunities into successful projects. The involvement of senior management and the alignment with organizational strategy are key factors in this transformative and beneficial journey. Let’s break down the key components of this process:

  1. Identifying Needs and Opportunities: The process begins by identifying the needs and opportunities within the organization. This could result from changes in the organizational strategy, new business requirements, technological advancements, market trends, or other factors that create opportunities or address existing needs.
  2. Alignment with Organizational Strategy: The identified needs and opportunities should align with the overall organizational strategy. This ensures that projects undertaken are in harmony with the long-term goals and objectives of the organization.
  3. Business Requirements: Understanding and incorporating business requirements is essential. These requirements may arise from changes in market dynamics, customer expectations, regulatory compliance, or internal organizational needs.
  4. Evaluation Process: A systematic evaluation process is then employed to assess the identified needs and opportunities. This evaluation considers factors such as feasibility, potential benefits, risks, resource requirements, and alignment with organizational goals.
  5. Involvement of Senior Management: Senior management, which may include organizational management, portfolio management, or program management, plays a critical role in the evaluation process. Their involvement ensures that decisions are made at the appropriate level and are in line with the organization’s strategic vision.
  6. Transformation into Projects: The goal is to identify potential projects that can effectively transform the identified needs and opportunities into realized benefits. This transformation may involve the development of new products, services, processes, or other initiatives that contribute to organizational success.
  7. Portfolio Management: In organizations with a portfolio management approach, the evaluation process may involve considering the entire portfolio of projects to ensure alignment with overarching organizational objectives. This strategic view helps in optimizing resource allocation and maximizing overall benefits.
  8. Program Management: Program management comes into play when a set of related projects needs to be managed collectively to achieve a common strategic objective. Program management ensures coordination and integration among these projects to deliver cohesive outcomes.
  9. Benefits Realization: The ultimate goal is to realize benefits for the organization. This could include financial gains, increased efficiency, enhanced customer satisfaction, or other positive outcomes that contribute to the overall success of the organization.
  10. Decision-Making and Approval: Senior management, based on the evaluation outcomes, makes decisions on which projects to pursue. This involves considering factors such as priority, strategic fit, available resources, and expected returns.
  11. Strategic Alignment with Programs and Projects: Once projects are identified and approved, they need to be strategically aligned with broader programs or initiatives. This alignment ensures that projects collectively contribute to the achievement of organizational goals.
  12. Continuous Monitoring and Adaptation: The process doesn’t end with project initiation. Continuous monitoring and adaptation are crucial to ensure that projects stay on track and remain aligned with evolving organizational needs and strategies.

These needs and opportunities can address, for example, a new market demand, a current organizational need or a new legal requirement.

In each of these scenarios, the needs and opportunities are drivers for potential projects. The organization must assess these drivers, evaluate their strategic significance, and determine the best approach to capitalize on or address them. The project management process then comes into play to plan, execute, and monitor projects that will transform these identified needs and opportunities into tangible benefits for the organization. The ability to respond to such needs and opportunities requires agility and strategic foresight. Organizations that can effectively identify and address these drivers through well-executed projects are better positioned to thrive in dynamic and competitive environments.

  1. New Market Demand:
    • Scenario: A shift in consumer preferences, emerging trends, or technological advancements may create a new demand in the market.
    • Potential Project: Initiating a project to develop and launch a new product or service that caters to the identified market demand. This could involve market research, product development, and marketing strategies.
  2. Current Organizational Need:
    • Scenario: The organization identifies an internal challenge or deficiency that needs to be addressed to improve efficiency, effectiveness, or overall performance.
    • Potential Project: Launching a project to address the identified organizational need. This could involve process improvement initiatives, technology implementations, or restructuring efforts.
  3. New Legal Requirement:
    • Scenario: Changes in legislation or the introduction of new legal requirements impact the way the organization operates or delivers its products/services.
    • Potential Project: Undertaking a project to ensure compliance with the new legal requirements. This might involve updating policies and procedures, implementing new systems, or conducting training programs.

The needs and opportunities should be evaluated before formal authorization to initiate a new project.

Evaluating needs and opportunities is an essential pre-project activity that occurs before formal authorization to initiate a new project.Evaluating needs and opportunities before formal project initiation authorization is a critical step to ensure that the organization makes well-informed and strategic decisions. This thorough evaluation sets the foundation for successful project management by addressing key aspects such as feasibility, risk, benefits, and alignment with organizational goals. Here’s why this evaluation is crucial:

  1. Feasibility Assessment: Conducting an evaluation helps assess the feasibility of addressing the identified needs and opportunities. This involves considering technical, economic, operational, legal, and scheduling factors to determine if the project is viable.
  2. Risk Identification and Analysis: Evaluating needs and opportunities includes identifying potential risks associated with the proposed project. Understanding these risks allows for informed decision-making and risk mitigation planning before project initiation.
  3. Resource Planning: The evaluation process helps in planning for the necessary resources, including personnel, budget, and materials. This ensures that the organization is adequately prepared to commit resources to the project.
  4. Strategic Alignment: The evaluation ensures that the identified needs and opportunities align strategically with the organization’s goals. This alignment is crucial for determining whether pursuing the project is in the best interest of the organization.
  5. Benefits Analysis: Before formal authorization, an analysis of potential benefits is conducted. This involves identifying and quantifying the expected positive outcomes that the project is intended to deliver.
  6. Stakeholder Buy-In: Evaluating needs and opportunities allows for early engagement with stakeholders. Securing buy-in and involvement from key stakeholders is important for project success, and this process starts during the evaluation phase.
  7. Legal and Regulatory Compliance: For projects driven by new legal requirements, the evaluation includes an assessment of the compliance landscape. This ensures that the organization is aware of and prepared to meet any legal obligations associated with the project.
  8. Financial Viability: Assessing the financial aspects, including initial budget estimates and potential return on investment, is part of the evaluation process. This helps senior management make informed decisions about the project’s financial viability.
  9. Alternative Solutions: During the evaluation, alternative solutions or approaches may be considered. This exploration ensures that the organization chooses the most effective and efficient way to address the identified needs and opportunities.
  10. Strategic Decision-Making: The evaluation process provides the necessary information for senior management to make strategic decisions about whether to proceed with the project. This decision is typically formalized through the authorization to initiate the project.
  11. Project Charter Development: The evaluation phase contributes to the development of the project charter. This foundational document outlines key details, including project objectives, scope, constraints, and stakeholders, setting the stage for project initiation.

The project’s objectives, benefits, rationale and investment should be justified and documented in sufficient detail to enable a decision to be made on whether to initiate a project.

This emphasizes the importance of justifying and documenting key aspects of a project before making the decision to initiate it. This process is typically formalized through the development of a project justification or business case. In essence, the project justification or business case serves as a comprehensive document that presents a compelling argument for why the project is necessary and beneficial. It enables decision-makers to evaluate the proposal, consider its merits, and make an informed decision on whether to initiate the project. Here’s a breakdown of why and how these elements are justified and documented:

  1. Project Objectives:
    • Justification: Clearly define the specific goals and outcomes the project aims to achieve.
    • Documentation: Document the project objectives in detail, outlining what the project is expected to deliver and accomplish.
  2. Project Benefits:
    • Justification: Identify and articulate the positive outcomes and advantages the organization expects to gain from the project.
    • Documentation: Document the anticipated benefits, both tangible and intangible, and quantify them wherever possible. This helps in measuring the project’s success.
  3. Rationale:
    • Justification: Provide the reasoning behind why the project is necessary. This includes addressing the identified needs, opportunities, or challenges that the project aims to address.
    • Documentation: Document the rationale for the project, detailing the context, background, and the pressing reasons that make the project a strategic imperative.
  4. Investment:
    • Justification: Clearly outline the financial and resource investments required to undertake the project.
    • Documentation: Document the estimated costs, budget breakdown, and resource requirements for the project. Include an analysis of the return on investment (ROI) or cost-benefit analysis.
  5. Sufficient Detail:
    • Justification: Ensure that the information provided is comprehensive and sufficient to support decision-making.
    • Documentation: Document the details in a comprehensive project justification or business case document. Include supporting data, research findings, and any relevant analyses to make the case compelling.
  6. Decision-Making:
    • Justification: Make the case for why the project should move forward, addressing its strategic alignment and potential contribution to organizational objectives.
    • Documentation: Present the documented justification to decision-makers, typically senior management or a governance body, who will assess the information and decide whether to authorize the project initiation.
  7. Risk Assessment:
    • Justification: Acknowledge and address potential risks associated with the project.
    • Documentation: Document a preliminary risk assessment, highlighting identified risks and outlining initial strategies for risk management. This demonstrates a proactive approach to potential challenges.
  8. Alignment with Organizational Strategy:
    • Justification: Demonstrate how the project aligns with the broader organizational strategy and goals.
    • Documentation: Clearly articulate the alignment with organizational objectives and strategic priorities. This ensures that the project is in line with the overall direction of the organization.
  9. Alternatives Consideration:
    • Justification: Discuss and consider alternative solutions or approaches.
    • Documentation: Document the evaluation of alternative options and provide a rationale for why the chosen project is the most viable and beneficial solution.
  10. Transparency and Accountability:
    • Justification: Promote transparency in decision-making and accountability for resource allocation.
    • Documentation: By thoroughly documenting the justification, there is a clear and transparent record of the decision-making process. This is important for future reference, audits, and accountability.

Such documentation can be used to enable the prioritization of needs and opportunities.

The documentation of project justification serves as a valuable tool for decision-makers, providing the necessary information and insights to prioritize needs and opportunities effectively. This prioritization process ensures that the organization focuses its resources on projects that align with its strategic objectives and deliver the most significant value. The comprehensive documentation of project objectives, benefits, rationale, and investment is instrumental in facilitating the prioritization of needs and opportunities within an organization. Here’s how this documentation supports the prioritization process:

  1. Comparative Analysis: The detailed documentation provides a basis for conducting a comparative analysis of different needs and opportunities. Decision-makers can assess the documented information for each potential project, allowing them to compare and prioritize based on factors such as strategic alignment, benefits, and feasibility.
  2. Strategic Alignment: The documentation clearly outlines how each potential project aligns with the organization’s strategic goals. This strategic alignment becomes a critical factor in prioritizing projects that contribute most effectively to the overall organizational objectives.
  3. Quantifiable Benefits: The documentation includes quantifiable benefits associated with each project. Decision-makers can use this information to prioritize projects with the most substantial and measurable positive impact on the organization.
  4. Resource Requirements: Detailed documentation specifies the resource requirements, including budget, personnel, and other necessary resources for each project. This information assists in assessing the feasibility and practicality of undertaking each project in relation to available resources.
  5. Risk Assessment: The documentation incorporates a preliminary risk assessment for each project. Decision-makers can use this information to evaluate the level of risk associated with each project and prioritize those with manageable and acceptable risks.
  6. Return on Investment (ROI): The documentation includes an analysis of the return on investment or cost-benefit analysis for each project. This financial analysis helps in prioritizing projects based on their potential economic impact and alignment with budgetary constraints.
  7. Urgency and Impact: By clearly articulating the rationale for each project, the documentation enables decision-makers to understand the urgency and potential impact of addressing specific needs and opportunities. This understanding guides the prioritization process.
  8. Alternative Solutions Consideration: The documentation may include an exploration of alternative solutions for addressing needs and opportunities. Decision-makers can use this information to prioritize projects that represent the most effective and efficient solutions.
  9. Stakeholder Input: The documentation may involve input from key stakeholders. Decision-makers can consider stakeholder perspectives in the prioritization process, ensuring that projects with significant stakeholder support are given appropriate consideration.
  10. Adherence to Organizational Strategy: The documentation explicitly states how each project aligns with the organizational strategy. Decision-makers can prioritize projects that not only address specific needs but also contribute to the overall strategic direction of the organization.
  11. Transparency in Decision-Making: The comprehensive documentation ensures transparency in the decision-making process. This transparency is essential for gaining organizational buy-in and trust in the prioritization decisions.
  12. Continuous Improvement: As part of the documentation, lessons learned from previous projects or alternative solutions can inform the prioritization process. This contributes to a culture of continuous improvement and informed decision-making.

This prioritization can relate to some aspect of the organization’s strategy or business plan.

Prioritization of projects based on their alignment with the organization’s strategy and business plan is a fundamental principle of effective project portfolio management. By prioritizing projects based on their alignment with the organization’s strategy and business plan, the leadership ensures that limited resources are directed toward initiatives that contribute most effectively to the overall success and sustainability of the organization. This strategic approach enhances the organization’s ability to navigate challenges, capitalize on opportunities, and achieve its long-term objectives. Here’s how this prioritization works in relation to strategic alignment:

  1. Strategic Objectives:
    • Identification: Clearly defined strategic objectives are the foundation for prioritizing projects. These objectives are derived from the organization’s overall strategy and business plan.
    • Prioritization: Projects that directly contribute to achieving strategic objectives are prioritized over those that have a less direct impact.
  2. Strategic Initiatives:
    • Identification: The organization may have specific strategic initiatives outlined in its business plan to address key challenges or capitalize on opportunities.
    • Prioritization: Projects aligned with these strategic initiatives take precedence, as they are critical for the successful execution of the organization’s strategic roadmap.
  3. Alignment with Business Goals:
    • Identification: The business plan outlines the overarching goals and targets the organization aims to achieve.
    • Prioritization: Projects that contribute directly to meeting these business goals are given higher priority, as they have a more significant impact on the organization’s success.
  4. Resource Allocation:
    • Identification: The organization’s strategy and business plan often outline resource allocation priorities and constraints.
    • Prioritization: Projects aligning with the designated resource allocation strategy are prioritized, ensuring optimal use of available resources.
  5. Market and Customer Focus:
    • Identification: The business plan may emphasize specific markets or customer segments as strategic focal points.
    • Prioritization: Projects that address market demands or enhance customer satisfaction in alignment with the business plan take precedence.
  6. Risk Mitigation and Opportunities:
    • Identification: The organization’s strategy may highlight specific risks to be mitigated or opportunities to be seized.
    • Prioritization: Projects that directly address identified risks or capitalize on strategic opportunities are prioritized to enhance overall risk management and strategic advantage.
  7. Financial Objectives:
    • Identification: Financial targets, budget constraints, and return on investment expectations are articulated in the business plan.
    • Prioritization: Projects that align with and contribute to meeting financial objectives are given priority, ensuring fiscal responsibility and alignment with budgetary constraints.
  8. Regulatory Compliance:
    • Identification: The business plan may specify regulatory compliance requirements that need to be addressed.
    • Prioritization: Projects ensuring compliance with legal and regulatory obligations are prioritized to avoid potential risks and liabilities.
  9. Technology and Innovation Focus:
    • Identification: A strategic emphasis on technology adoption or innovation may be outlined in the business plan.
    • Prioritization: Projects that drive technological advancements or innovation in line with the business plan are given priority to maintain competitiveness.
  10. Organizational Culture and Values:
    • Identification: The organization’s strategy may emphasize certain cultural values or principles.
    • Prioritization: Projects that align with and reinforce the organization’s culture and values are prioritized to maintain coherence and employee engagement.

This prioritization can relate to higher-level programme or portfolio needs.

Absolutely, the prioritization of projects based on alignment with higher-level program or portfolio needs is a crucial aspect of strategic project management. In organizations with a program or portfolio management approach, projects are not only prioritized based on their individual merits but also in the context of broader initiatives. By integrating project prioritization with higher-level program or portfolio needs, organizations enhance their ability to execute strategic initiatives effectively. This approach ensures that projects collectively contribute to overarching goals, optimize resource allocation, and navigate complex interdependencies in alignment with the organization’s strategic direction. Here’s how this prioritization works:

  1. Program-Level Prioritization:
    • Identification: Programs are designed to manage a set of related projects to achieve a common strategic objective.
    • Prioritization: Projects within a program are prioritized based on their contribution to the overall goals and objectives of the program. This ensures that individual projects align with the broader program strategy.
  2. Portfolio-Level Prioritization:
    • Identification: Portfolios encompass a collection of programs and projects that align with the organization’s strategic objectives.
    • Prioritization: Projects are prioritized within the portfolio based on their collective impact on achieving organizational goals. This involves evaluating how individual projects contribute to the overall success of the portfolio.
  3. Resource Optimization:
    • Identification: Resource constraints are considered at both program and portfolio levels.
    • Prioritization: Projects are prioritized to optimize the use of resources across programs and portfolios. This involves aligning resource allocation with strategic priorities and ensuring that high-priority projects receive adequate resources.
  4. Strategic Alignment with Programs:
    • Identification: Programs are established to address strategic initiatives outlined in the organization’s strategy.
    • Prioritization: Projects within programs are prioritized based on their alignment with program objectives. This ensures that projects collectively contribute to the success of the program and, by extension, the organization.
  5. Strategic Contribution to Portfolio:
    • Identification: Portfolios are designed to advance the organization’s strategic goals.
    • Prioritization: Projects are prioritized within the portfolio based on their strategic contribution. This involves assessing how each project aligns with the overall strategic direction and objectives of the organization.
  6. Risk Management at the Program Level:
    • Identification: Programs often involve managing risks that span across multiple projects.
    • Prioritization: Projects are prioritized within programs to address and mitigate risks effectively. This ensures that risk management efforts are aligned with program-level considerations.
  7. Synergy and Dependencies:
    • Identification: Projects within programs or portfolios may have dependencies on each other.
    • Prioritization: Projects are prioritized considering interdependencies to create a sequence that maximizes synergy and minimizes conflicts. This approach ensures a cohesive and coordinated execution.
  8. Benefits Realization:
    • Identification: Programs and portfolios are established to realize specific benefits for the organization.
    • Prioritization: Projects are prioritized based on their potential to contribute to the realization of benefits outlined in program and portfolio objectives. This involves assessing the cumulative impact on organizational success.
  9. Program and Portfolio Governance:
    • Identification: Programs and portfolios have their governance structures.
    • Prioritization: Projects are prioritized within the governance framework to ensure compliance with program and portfolio management policies. This involves aligning project priorities with overarching governance guidelines.
  10. Adaptability to Changes in Strategy:
    • Identification: Strategic priorities may evolve over time.
    • Prioritization: Projects are continually prioritized to adapt to changes in strategy. This ensures that the organization remains agile and responsive to evolving market conditions and internal needs.

This prioritization can relate to customer’s needs.

Prioritizing projects based on customer needs is a crucial aspect of customer-centric project management. Aligning projects with customer needs ensures that organizations are delivering value and satisfaction to their target audience.By prioritizing projects based on customer needs, organizations demonstrate a commitment to delivering value and enhancing customer satisfaction. This customer-centric approach not only aligns projects with the market but also contributes to long-term relationships, loyalty, and sustained business success. Here’s how prioritization can relate to customer needs:

  1. Customer Feedback and Insights:
    • Identification: Actively gather and analyze customer feedback and insights to understand their needs, preferences, and expectations.
    • Prioritization: Prioritize projects that directly address and align with identified customer needs. This ensures that project outcomes resonate with customer expectations.
  2. Market Research and Analysis:
    • Identification: Conduct market research to identify emerging trends, market demands, and changes in customer behavior.
    • Prioritization: Prioritize projects that respond to current or anticipated shifts in customer needs. This proactive approach helps organizations stay ahead in meeting evolving customer expectations.
  3. Customer Journey Mapping:
    • Identification: Map the customer journey to identify pain points, opportunities, and moments of truth.
    • Prioritization: Prioritize projects that enhance the overall customer experience by addressing key touchpoints in the customer journey. This ensures a holistic and customer-centric approach.
  4. Product or Service Enhancement:
    • Identification: Identify areas for improvement in existing products or services based on customer feedback.
    • Prioritization: Prioritize projects focused on enhancing or expanding existing offerings to better meet customer needs. This approach contributes to customer loyalty and satisfaction.
  5. New Product Development:
    • Identification: Identify gaps in the market or unmet customer needs that present opportunities for new products or services.
    • Prioritization: Prioritize projects that involve the development of new products or services aligned with identified customer needs. This ensures that the organization remains innovative and responsive to market demands.
  6. Customization and Personalization:
    • Identification: Recognize the demand for customization or personalization in products or services.
    • Prioritization: Prioritize projects that enable customization or personalization, providing customers with tailored solutions that cater to their specific needs and preferences.
  7. Speed to Market:
    • Identification: Identify customer needs for rapid delivery or quick response to emerging trends.
    • Prioritization: Prioritize projects that enable a faster time-to-market, allowing the organization to capitalize on timely opportunities and meet customer expectations promptly.
  8. Quality and Reliability:
    • Identification: Understand the importance of quality and reliability in meeting customer expectations.
    • Prioritization: Prioritize projects that focus on ensuring and enhancing the quality and reliability of products or services. This approach contributes to customer trust and satisfaction.
  9. Communication and Transparency:
    • Identification: Recognize the importance of transparent communication with customers.
    • Prioritization: Prioritize projects that improve communication channels, provide clear information, and enhance transparency in interactions with customers. This contributes to a positive customer experience.
  10. Post-Purchase Support and Service:
    • Identification: Acknowledge the significance of post-purchase support and service.
    • Prioritization: Prioritize projects that improve post-purchase support and service, ensuring that customers receive assistance and value even after the initial transaction.
  11. Adaptation to Changing Customer Needs:
    • Identification: Monitor and adapt to changes in customer needs and preferences over time.
    • Prioritization: Continuously prioritize projects that align with evolving customer needs, allowing the organization to stay responsive and customer-focused.

The purpose of such justification is to obtain organizational commitment and authorization for investment in the selected project together with an understanding of the constraints, risks and assumptions.

The purpose of developing a comprehensive justification for a project is to secure organizational commitment and obtain authorization for the necessary investment. This justification serves as a foundational document that provides decision-makers with a clear understanding of the project’s context, constraints, risks, and assumptions. By fulfilling these purposes, a well-crafted project justification ensures that decision-makers are fully informed about the project’s context, benefits, risks, and constraints. This, in turn, increases the likelihood of obtaining the necessary commitment and authorization for the project’s successful initiation and execution. Here’s a breakdown of the key purposes:

  1. Organizational Commitment:
    • Objective: To gain the support and commitment of key stakeholders, including senior management, sponsors, and other relevant parties.
    • Importance: Organizational commitment is crucial for ensuring that the project receives the necessary resources, including funding, personnel, and support.
  2. Authorization for Investment:
    • Objective: To obtain formal approval and authorization to proceed with the project.
    • Importance: Formal authorization is a critical step in initiating the project, signifying that the organization acknowledges the project’s value and is willing to invest resources in its execution.
  3. Understanding of Constraints:
    • Objective: To clearly outline any limitations or constraints that may impact the project’s execution.
    • Importance: Providing a transparent view of constraints helps decision-makers assess the feasibility of the project within existing organizational limitations, whether they be budgetary, resource-related, or time constraints.
  4. Identification of Risks:
    • Objective: To identify potential risks that could affect the project’s success.
    • Importance: Recognizing and documenting risks allows decision-makers to make informed choices about risk management strategies and ensures that potential challenges are addressed proactively.
  5. Assumptions Clarification:
    • Objective: To articulate any assumptions made during the project justification process.
    • Importance: Clear communication of assumptions helps decision-makers understand the foundation on which project plans are built. It also allows for validation or adjustment of assumptions as needed.
  6. Feasibility Demonstration:
    • Objective: To demonstrate the project’s feasibility in terms of technical, operational, economic, legal, and scheduling considerations.
    • Importance: Decision-makers need assurance that the project is viable and can be successfully executed. Feasibility considerations contribute to this assurance.
  7. Benefits Realization Explanation:
    • Objective: To explain how the project aligns with organizational goals and how its successful completion will contribute to benefits realization.
    • Importance: Decision-makers need a clear understanding of the expected benefits and how they align with the broader organizational strategy. This ensures that the project aligns with the organization’s objectives.
  8. Alignment with Strategy:
    • Objective: To show how the project aligns with the overall organizational strategy and objectives.
    • Importance: Decision-makers need to ensure that the project is consistent with the strategic direction of the organization. Alignment with strategy is a key factor in decision-making.
  9. Decision-Making Support:
    • Objective: To provide decision-makers with the information and insights needed to make an informed decision about whether to proceed with the project.
    • Importance: Decision-makers rely on the comprehensive justification to assess the project’s merit, feasibility, and alignment with organizational priorities.
  10. Communication with Stakeholders:
    • Objective: To facilitate transparent communication with stakeholders.
    • Importance: Clear communication is essential for building trust and securing stakeholder support. The justification document serves as a transparent and comprehensive communication tool.
  11. Basis for Project Charter:
    • Objective: To provide the foundational information for developing the project charter.
    • Importance: The project charter, which formally authorizes the project and provides initial guidance, is often derived from the detailed justification.

The justification for initiating the project can be defined in documents such as terms of reference, a brief, a proposal or a preliminary business case.

Each of these documents plays a crucial role in the project initiation phase. They are tools for communication, decision-making, and obtaining the necessary approvals to move forward with the project. The choice of document depends on the level of detail required, the formality of the approval process, and the preferences of the organization. Regardless of the document type, the goal is to provide decision-makers with the information needed to make informed choices about whether to authorize the project and commit resources to its execution. Each of these documents serves a specific purpose and provides varying levels of detail. Here’s a brief overview of each:

  1. Terms of Reference (ToR):
    • Purpose: The Terms of Reference document outlines the scope, objectives, and key stakeholders of the project. It provides a high-level overview of what the project aims to achieve.
    • Content: Typically includes project background, objectives, scope, deliverables, stakeholders, and a brief description of the project approach.
    • Use: Often used as a formal document to communicate the basic details of the project to stakeholders and to seek their agreement or approval.
  2. Brief:
    • Purpose: A project brief is a concise document that outlines the essential information about the project. It is a quick reference for decision-makers.
    • Content: Contains key information such as project objectives, scope, expected benefits, high-level risks, and resource requirements.
    • Use: Used for initial discussions and to provide decision-makers with a brief overview of the proposed project.
  3. Proposal:
    • Purpose: A project proposal is a more detailed document that provides a comprehensive view of the project. It includes a thorough analysis of the problem or opportunity and the proposed solution.
    • Content: Typically includes background, problem statement, project objectives, scope, methodology, timeline, budget, risk assessment, and benefits.
    • Use: Used to formally present a detailed plan to stakeholders and decision-makers. Often part of a formal request for approval.
  4. Preliminary Business Case:
    • Purpose: A preliminary business case provides an initial assessment of the project’s feasibility and potential return on investment. It is a precursor to a more detailed business case.
    • Content: Includes an overview of the business problem or opportunity, analysis of options, preliminary cost estimates, benefits, and risks.
    • Use: Helps decision-makers understand the high-level business rationale for the project and serves as a basis for determining whether to proceed to the development of a detailed business case.

An evaluation should be undertaken to determine if the project should be undertaken at the organization, portfolio or programme level.

This is a critical step in project management—determining the appropriate level at which a project should be undertaken within an organization. This evaluation helps ensure that projects align with the organization’s strategic objectives and are managed at the most effective and efficient level.By carefully considering these factors, organizations can make informed decisions about the appropriate level at which to undertake a project. This decision contributes to effective project management, strategic alignment, and optimized resource utilization within the organization. Here are some considerations for evaluating whether a project should be undertaken at the organization, portfolio, or program level:

  1. Strategic Alignment:
    • Consideration: Assess how closely the project aligns with the organization’s overall strategic objectives.
    • Decision: If the project is directly linked to and crucial for achieving organizational strategy, it may be suitable for execution at the organization level.
  2. Scope and Complexity:
    • Consideration: Evaluate the scope and complexity of the project.
    • Decision: Projects with extensive scope or high complexity may benefit from being managed at the program or portfolio level, where additional governance and coordination can be provided.
  3. Resource Requirements:
    • Consideration: Analyze the resource needs of the project, including personnel, budget, and technology.
    • Decision: If the project requires substantial resources that exceed what can be managed at the project level, it might be better suited for program or portfolio management.
  4. Interdependencies:
    • Consideration: Identify whether the project has dependencies on other projects or initiatives within the organization.
    • Decision: If there are significant interdependencies, managing the project at the program or portfolio level can provide better coordination and alignment.
  5. Risk and Uncertainty:
    • Consideration: Assess the level of risk and uncertainty associated with the project.
    • Decision: High-risk projects may benefit from program or portfolio management, providing a more comprehensive risk management framework.
  6. Benefits Realization:
    • Consideration: Evaluate how the project’s outcomes contribute to the realization of organizational benefits.
    • Decision: If the project plays a critical role in achieving overarching benefits, it may be suitable for management at the program or portfolio level.
  7. Strategic Initiatives:
    • Consideration: Determine if the project is part of a broader strategic initiative or program.
    • Decision: If the project is part of a larger strategic initiative, managing it within a program or portfolio structure may ensure alignment with strategic goals.
  8. Resource Optimization:
    • Consideration: Consider how resources can be optimized across multiple projects and initiatives.
    • Decision: Managing projects at the program or portfolio level allows for better resource optimization and allocation.
  9. Governance Requirements:
    • Consideration: Assess the governance needs of the project.
    • Decision: Projects with higher governance requirements may benefit from being managed at higher organizational levels.
  10. Stakeholder Engagement:
    • Consideration: Evaluate the number and diversity of stakeholders involved in the project.
    • Decision: If the project involves numerous stakeholders with varying interests, program or portfolio management can provide a structured approach to stakeholder engagement.
  11. Scale and Volume:
    • Consideration: Consider the scale and volume of projects within the organization.
    • Decision: In organizations with multiple projects, managing them within a portfolio structure allows for better coordination and alignment with strategic objectives.
  12. Budgetary Considerations:
    • Consideration: Assess the budgetary constraints and financial implications of the project.
    • Decision: Projects with significant financial implications may be better managed at the portfolio level to ensure alignment with overall financial goals.

Such an evaluation should be based on multiple criteria, such as quantitative, qualitative and financial criteria, alignment to organizational strategy, sustainability and social and environmental impact.

Considering multiple criteria in the evaluation process is crucial for making well-informed decisions about project management at different organizational levels. By considering these diverse criteria, organizations can conduct a comprehensive evaluation that takes into account not only the financial aspects of a project but also its qualitative and strategic implications. This multidimensional evaluation approach enhances the likelihood of making decisions that align with the organization’s overall vision, values, and long-term sustainability. It also contributes to a more holistic understanding of the potential impact of the project on various stakeholders and the broader environment. Here’s a breakdown of the various criteria you mentioned:

  1. Quantitative Criteria:
    • Examples: Metrics, numerical data, performance indicators.
    • Purpose: To assess measurable aspects such as financial returns, resource utilization, and project timelines.
  2. Qualitative Criteria:
    • Examples: Stakeholder satisfaction, organizational culture fit, and team capabilities.
    • Purpose: To assess non-quantifiable factors that can influence project success, including the project team’s skills, stakeholder support, and overall organizational alignment.
  3. Financial Criteria:
    • Examples: Budget constraints, return on investment (ROI), cost-benefit analysis.
    • Purpose: To evaluate the financial feasibility and impact of the project, ensuring that it aligns with the organization’s budgetary constraints and delivers a positive return.
  4. Alignment to Organizational Strategy:
    • Examples: Strategic objectives, organizational goals.
    • Purpose: To ensure that the project is in direct alignment with the overarching strategic direction and objectives of the organization.
  5. Sustainability:
    • Examples: Long-term viability, environmental impact, social responsibility.
    • Purpose: To assess the project’s sustainability, considering its long-term impact on the organization and its ability to contribute positively to social and environmental factors.
  6. Social Impact:
    • Examples: Social responsibility, community engagement.
    • Purpose: To evaluate the project’s potential positive or negative effects on society and its alignment with the organization’s social responsibility goals.
  7. Environmental Impact:
    • Examples: Carbon footprint, ecological considerations.
    • Purpose: To assess the project’s impact on the environment and ensure that it aligns with the organization’s environmental sustainability goals.
  8. Risk Analysis:
    • Examples: Identification of potential risks, risk mitigation strategies.
    • Purpose: To identify and analyze potential risks associated with the project and develop strategies to manage or mitigate them effectively.
  9. Benefits Realization:
    • Examples: Anticipated benefits, key performance indicators (KPIs).
    • Purpose: To articulate and quantify the expected benefits of the project, providing a basis for measuring its success and value to the organization.
  10. Strategic Initiatives:
    • Examples: Alignment with key initiatives, contribution to strategic goals.
    • Purpose: To ensure that the project is part of broader strategic initiatives and contributes directly to achieving the organization’s strategic goals.
  11. Resource Optimization:
    • Examples: Efficient use of resources, avoidance of resource bottlenecks.
    • Purpose: To evaluate how effectively resources, including personnel, time, and budget, can be optimized across multiple projects and initiatives.
  12. Stakeholder Alignment:
    • Examples: Support from key stakeholders, stakeholder expectations.
    • Purpose: To assess the level of support from and alignment with key stakeholders, ensuring that their expectations are considered in the decision-making process.

Criteria are likely to differ among different organizations, portfolios, programmes and projects, depending on the context.

The criteria for evaluating projects can indeed vary significantly among different organizations, portfolios, programs, and projects, and this variability is primarily driven by the unique context, goals, and values of each entity. Given this variation, it’s essential for organizations to carefully tailor their evaluation criteria to their specific context and needs. Project managers and decision-makers should be cognizant of the unique factors that influence their organization and ensure that the chosen criteria align with strategic objectives and support successful project outcomes. Customizing the evaluation criteria to the organizational context enhances the relevance and effectiveness of the project evaluation process. Here are some key factors that contribute to the diversity in evaluation criteria:

  1. Organizational Objectives and Strategy:
    • Variation: Organizations have distinct goals, missions, and strategic priorities.
    • Impact: The criteria used for project evaluation will be influenced by how well a project aligns with the specific objectives and strategic direction of the organization.
  2. Industry and Sector Differences:
    • Variation: Criteria may be shaped by the industry or sector in which an organization operates.
    • Impact: For example, environmental impact might be a critical criterion for a sustainability-focused organization, while regulatory compliance could be paramount for organizations in highly regulated industries.
  3. Cultural and Ethical Considerations:
    • Variation: Cultural values and ethical considerations vary across organizations and regions.
    • Impact: Criteria related to social responsibility, ethical practices, and cultural alignment can differ based on the organizational culture and the regions in which organizations operate.
  4. Risk Tolerance and Management Approach:
    • Variation: Organizations have different risk tolerances and approaches to risk management.
    • Impact: Criteria related to risk assessment, risk mitigation, and the level of uncertainty accepted can vary based on the organization’s risk appetite.
  5. Financial Structure and Budgetary Constraints:
    • Variation: Organizations may have different financial structures, budgets, and funding mechanisms.
    • Impact: Criteria related to financial feasibility, return on investment, and budget constraints will be influenced by the financial context of the organization.
  6. Project Size and Complexity:
    • Variation: Projects come in various sizes and complexities.
    • Impact: The criteria for evaluating a small, straightforward project may differ significantly from those used for a large, complex initiative. Larger projects may necessitate more detailed and comprehensive evaluation criteria.
  7. Industry Standards and Best Practices:
    • Variation: Different industries may follow specific standards and best practices.
    • Impact: Criteria might be influenced by industry-specific standards, certifications, and benchmarks that guide project evaluation and management practices.
  8. Regulatory and Legal Requirements:
    • Variation: Regulatory environments and legal requirements vary across industries and regions.
    • Impact: Criteria related to compliance with laws and regulations will be specific to the legal context in which the organization operates.
  9. Stakeholder Expectations:
    • Variation: Stakeholders have diverse expectations and priorities.
    • Impact: Criteria related to stakeholder alignment, communication, and engagement will be influenced by the unique expectations of different stakeholders.
  10. Market Dynamics and Competition:
    • Variation: The competitive landscape and market dynamics differ across industries.
    • Impact: Criteria related to market positioning, competitive advantage, and responsiveness to market changes may vary based on the industry context.
  11. Technology Environment:
    • Variation: The level of technological sophistication and innovation varies.
    • Impact: Criteria related to technology adoption, innovation, and IT infrastructure may differ based on the technological environment of the organization.
  12. Project Governance and Decision-Making Structures:
    • Variation: Governance structures and decision-making processes can differ.
    • Impact: Criteria related to project governance, decision-making authority, and reporting structures may be shaped by the organizational governance model.

Prior to authorizing the initiation of the project, the sponsoring organization should identify the project sponsor and the project manager, and define their initial responsibilities and authorities.

Before authorizing the initiation of a project, the sponsoring organization should identify key roles, including the project sponsor and project manager, and define their initial responsibilities and authorities. This ensures clarity and accountability from the outset. By clearly identifying the project sponsor and project manager and defining their initial responsibilities and authorities, the sponsoring organization sets the stage for a well-structured and effectively managed project. This clarity helps ensure that key decision-makers are aligned, and the project is set on a path for success from the very beginning. It also provides a foundation for effective communication and collaboration throughout the project lifecycle.Here’s more detail on the roles and responsibilities of the project sponsor and project manager:

  1. Project Sponsor:
    • Identification: The project sponsor is a senior-level individual within the organization who champions the project and provides strategic direction.
    • Responsibilities:
      • Strategic Alignment: Ensure the project aligns with the organization’s strategic objectives.
      • Resource Commitment: Secure necessary resources, including funding and personnel.
      • Decision-Making: Make key decisions and provide guidance on project direction.
      • Stakeholder Management: Engage with key stakeholders and ensure their support.
      • Risk Management: Oversee the identification and management of project risks.
      • Benefits Realization: Monitor and ensure the realization of anticipated benefits.
      • Project Charter Approval: Approve the project charter and overall project plan.
  2. Project Manager:
    • Identification: The project manager is responsible for the day-to-day execution and management of the project.
    • Responsibilities:
      • Project Planning: Develop detailed project plans, schedules, and budgets.
      • Team Leadership: Lead and motivate the project team.
      • Communication: Facilitate effective communication among team members and stakeholders.
      • Risk Management: Identify and mitigate project risks.
      • Quality Assurance: Ensure project deliverables meet quality standards.
      • Budget Management: Manage project finances within approved budgets.
      • Timeline Adherence: Ensure the project progresses according to the agreed timeline.
      • Reporting: Provide regular updates to the project sponsor and stakeholders.
      • Issue Resolution: Address and resolve project issues as they arise.
  3. Defining Initial Responsibilities and Authorities:
    • Collaborative Process: The definition of responsibilities and authorities is often a collaborative process involving the project sponsor, project manager, and other relevant stakeholders.
    • Documenting Roles: Document the roles and responsibilities in a clear and concise manner. This documentation is often included in the project charter or a separate project initiation document.
    • Authority Levels: Clearly define the decision-making authority of both the project sponsor and project manager. This includes the extent of their decision-making power and any approvals required.
    • Communication Protocols: Establish communication protocols between the project sponsor and project manager, ensuring regular updates and channels for issue escalation.
  4. Project Initiation Documentation:
    • Project Charter: The project charter is a key document that typically includes information about the project sponsor, project manager, and their roles and responsibilities. It also outlines the project’s objectives, scope, and initial plans.
    • Project Initiation Document (PID): In some project management methodologies, a Project Initiation Document (PID) is created to capture essential information, including roles and responsibilities.

Prior to authorizing the initiation of the project, the sponsoring organization should define initial governance arrangements.

Defining initial governance arrangements is a crucial step before authorizing the initiation of a project. Governance arrangements provide the structure, processes, and decision-making mechanisms that guide how the project will be managed and controlled. Establishing clear governance from the outset helps ensure accountability, transparency, and effective communication throughout the project’s lifecycle. Defining these initial governance arrangements ensures that everyone involved in the project understands their roles and responsibilities, decision-making processes are clear, and the project is set up for success with a solid foundation for effective management and control. It also promotes alignment with organizational policies and standards, contributing to overall project success. Here are key aspects to consider in defining initial governance arrangements:

  1. Governance Structure:
    • Identification: Determine the overall governance structure for the project.
    • Components: This may include the Project Board, Steering Committee, Project Management Office (PMO), and other key stakeholders.
    • Responsibilities: Clearly outline the roles and responsibilities of each governance component.
  2. Decision-Making Authority:
    • Identification: Clearly define decision-making authority within the governance structure.
    • Levels of Decision-Making: Specify which decisions require approval from the project sponsor, steering committee, or other governance bodies.
    • Escalation Procedures: Establish procedures for escalating issues or decisions that require higher-level approval.
  3. Communication Channels:
    • Identification: Define the communication channels between different levels of the governance structure.
    • Reporting Mechanisms: Establish reporting mechanisms for the project manager to provide updates to the project sponsor and other governance bodies.
    • Frequency: Determine the frequency and format of status reports and other communication channels.
  4. Roles and Responsibilities:
    • Identification: Clearly define the roles and responsibilities of key individuals within the governance structure.
    • Project Sponsor: Outline the responsibilities of the project sponsor, who provides strategic direction and support.
    • Project Manager: Specify the responsibilities of the project manager, who oversees day-to-day project activities.
    • Steering Committee or Project Board: Clarify the roles of these bodies in providing oversight and strategic guidance.
  5. Risk Management:
    • Identification: Define how risks will be identified, assessed, and managed within the project.
    • Escalation of Risks: Specify how significant risks will be escalated to higher levels of governance for consideration.
    • Risk Mitigation Strategies: Outline the strategies for mitigating identified risks.
  6. Change Control:
    • Identification: Define the process for managing changes to the project scope, schedule, or budget.
    • Approval Process: Specify the approval process for changes, including the individuals or bodies responsible for granting approval.
  7. Resource Allocation:
    • Identification: Clarify how resources, including budget and personnel, will be allocated and managed.
    • Budget Approval: Specify the process for budget approval and any financial controls that will be in place.
    • Resource Coordination: Define how resources will be coordinated across different project components.
  8. Quality Assurance:
    • Identification: Define how the project’s deliverables will be monitored for quality.
    • Quality Standards: Establish the quality standards that the project must adhere to.
    • Audit Process: Outline any audit processes or reviews to ensure compliance with quality standards.
  9. Documentation and Reporting:
    • Identification: Define the documentation requirements for the project.
    • Reporting Requirements: Specify the frequency and format of project reports, including what information needs to be included.
    • Document Control: Establish document control processes to ensure version control and accessibility.
  10. Closure and Evaluation:
    • Identification: Define the process for project closure and evaluation.
    • Post-Implementation Review: Specify how the project’s success will be assessed post-implementation.
    • Lessons Learned: Establish processes for capturing and incorporating lessons learned into future projects.
  11. Compliance and Legal Considerations:
    • Identification: Address any legal or compliance considerations relevant to the project.
    • Ethical Standards: Define ethical standards and ensure that the project adheres to legal requirements.

Prior to authorizing the initiation of the project, the sponsoring organization should determine whether the organization has resources and funding for the whole project, or at least for the first phase and believes it can secure the additional funding for the rest of the project.

Assessing the availability of resources and funding is a critical step before authorizing the initiation of a project. It ensures that the sponsoring organization has the necessary financial and human resources to support the entire project or, at the very least, the first phase. Additionally, the organization should have confidence in its ability to secure additional funding for the subsequent phases of the project. Here are key considerations in this pre-authorization assessment:

  1. Resource Availability:
    • Financial Resources: Evaluate whether the organization has the financial resources to support the project. This includes the budget for all planned phases.
    • Human Resources: Assess the availability of skilled and qualified personnel required for the project. Ensure that the necessary expertise is accessible.
  2. Funding for Initial and Subsequent Phases:
    • Initial Funding: Confirm that there is sufficient funding to cover the costs of initiating the project and completing the first phase.
    • Securing Additional Funding: Assess the organization’s confidence in securing additional funding for subsequent project phases. This may involve exploring potential funding sources, such as internal budgets, external grants, or partnerships.
  3. Budgetary Approval Process:
    • Approval Mechanism: Understand the process for budgetary approval within the organization. This includes any internal reviews, committees, or decision-making bodies involved in approving project budgets.
    • Timeline for Approval: Determine the timeline for securing budgetary approvals to ensure that the project can move forward without unnecessary delays.
  4. Contingency Planning:
    • Risk Assessment: Identify potential risks or challenges related to resource and funding availability.
    • Contingency Plans: Develop contingency plans for addressing unforeseen resource constraints or budgetary challenges. This may involve setting aside contingency funds or exploring alternative resource options.
  5. Financial Commitment:
    • Organizational Commitment: Assess the organization’s commitment to providing the necessary financial support for the project. This commitment is crucial for the project’s success and timely completion.
    • Alignment with Strategic Goals: Confirm that the project aligns with the organization’s strategic goals and priorities, increasing the likelihood of continued financial support.
  6. Stakeholder Involvement:
    • Key Stakeholders: Involve key stakeholders, including financial decision-makers, in discussions about resource and funding availability.
    • Communication: Ensure clear communication with stakeholders about the financial requirements of the project and the anticipated benefits.
  7. Phased Funding Approach:
    • Phased Project Approach: If the project is large or complex, consider a phased approach to funding. Secure funding for each phase based on the project’s progress and demonstrated success.
    • Review Points: Establish review points at the end of each phase to assess the project’s performance and secure approvals for subsequent phases.
  8. Documentation and Reporting:
    • Financial Documentation: Ensure that financial documentation, including budgets and funding plans, is comprehensive and well-documented.
    • Regular Reporting: Implement regular reporting mechanisms to keep stakeholders informed about the financial status of the project and any changes to funding requirements.
  9. Legal and Regulatory Compliance:
    • Compliance Checks: Ensure that the project’s financial plans and funding sources comply with relevant legal and regulatory requirements.
    • Risk Mitigation: Identify and address any potential legal or compliance risks associated with the project’s financial aspects.

By thoroughly evaluating resource and funding availability, the sponsoring organization can make an informed decision about whether to authorize the initiation of the project. This assessment helps mitigate financial risks, ensures a realistic budgetary foundation, and sets the stage for successful project execution. It also facilitates proactive planning for securing additional funding if needed during the project’s lifecycle.