ISO 21502:2020 Clause 7.7.3 Developing the budget

The assignment of budgets to scheduled work elements should provide a schedule-based budget against which actual performance can be compared.
The total cost of the project should be estimated, and a budget defined that identifies when funds need to be available and when costs are expected to be incurred. A method should be defined and established for managing and measuring cost performance in line with funding limits and requirements. Objective measures of cost performance should be established when budgeting. Setting objective measures in advance of cost performance assessments enhances accountability and avoids bias.
Project cost estimating and budgeting are closely linked. Reserves or contingency items not assigned to activities or other work scope elements can be created and used for management control purposes or to cover unforeseen costs. Such items and how they should be spent, together with associated risks, should be clearly identified. Allocation of the budgeted funds to work activities establishes a baseline for monitoring and enables re-baselining the budget when change requests are authorized.

Developing the budget in cost management involves the process of aggregating cost estimates for all project activities, resources, and deliverables to establish a comprehensive financial plan for the project. Here are the key steps involved in developing the budget:

  1. Cost Estimation: The first step in developing the budget is to estimate the costs associated with each project activity, task, work package, and deliverable. Project managers gather cost estimates from various sources, such as bottom-up estimating, analogous estimating, parametric estimating, vendor quotes, and expert judgment. These estimates quantify the financial resources required for labour, materials, equipment, facilities, overhead, and other project expenses.
  2. Cost Aggregation: Once cost estimates have been obtained for individual project components, project managers aggregate these estimates to determine the total project cost. Cost aggregation involves summing up the estimated costs for all project activities, resources, and deliverables to establish the overall project budget. This process ensures that all project costs are accounted for and included in the budget.
  3. Contingency Planning: In addition to the base cost estimates, project managers may allocate contingency reserves or management reserves to address uncertainties, risks, and unforeseen events that may impact project costs. Contingency planning involves identifying potential risks, assessing their impact on project finances, and setting aside additional funds to mitigate risks and cover unexpected expenses. Contingency reserves are included in the budget to provide a buffer against cost overruns and ensure financial flexibility.
  4. Budget Documentation: Once the budget has been developed, project managers document the budgetary details, including cost estimates, assumptions, constraints, and contingency provisions. Budget documentation provides a comprehensive overview of project finances, helping project stakeholders understand the financial scope, requirements, and constraints of the project. Budget documentation may include budget spreadsheets, cost breakdown structures, budget narratives, and other relevant documents.
  5. Budget Review and Approval: After developing the budget, project managers review the budgetary details with key stakeholders, project sponsors, and other relevant parties to ensure alignment with project objectives, scope, and constraints. Budget review involves presenting the budgetary information, discussing any discrepancies or concerns, and obtaining approval from stakeholders to proceed with the budget plan. Stakeholder approval validates the budget and provides the necessary authorization to allocate financial resources for project execution.
  6. Budget Baseline: Once the budget has been approved, project managers establish a budget baseline, which serves as the official financial plan for the project. The budget baseline represents the authorized budgetary constraints and provides a reference point for monitoring and controlling project costs throughout the project lifecycle. Any changes to the budget baseline require formal approval through a change control process to ensure proper governance and financial oversight.

By following these steps, project organizations can develop a comprehensive budget that accurately reflects the financial requirements of the project, incorporates contingency provisions for uncertainties, and aligns with project objectives and stakeholder expectations. Developing the budget is a critical aspect of cost management, as it provides the financial framework for executing the project and ensures that adequate resources are available to support project activities and deliverables within defined constraints.

The assignment of budgets to scheduled work elements should provide a schedule-based budget against which actual performance can be compared.

Assigning budgets to scheduled work elements is a fundamental aspect of budgeting in project management. This process ensures that each scheduled activity, task, or work package has an associated budget against which actual performance can be measured and compared. Here’s why it’s important and how it’s done:

  1. Alignment with Project Schedule: Assigning budgets to scheduled work elements ensures alignment between the project schedule and budget. Each scheduled work element is associated with a specific budget, reflecting the estimated costs required to complete that activity within the planned timeframe. This alignment allows project managers to track financial performance about project progress and milestones.
  2. Budget Baseline Development: Budgets are assigned to scheduled work elements during the development of the budget baseline. Project managers allocate budgetary resources to each scheduled activity based on the cost estimates derived during the cost estimation process. The budget baseline serves as the authorized financial plan for the project, providing a reference point for monitoring and controlling project costs.
  3. Cost Control and Performance Measurement: By assigning budgets to scheduled work elements, project managers establish a baseline against which actual performance can be compared. During project execution, actual costs incurred for each work element are tracked and compared to the budgeted costs. This allows project managers to monitor cost performance, identify variances, and take corrective actions as needed to keep the project on track financially.
  4. Variance Analysis: Assigning budgets to scheduled work elements facilitates variance analysis, which involves comparing actual performance to the budgeted baseline. Variances between actual costs and budgeted costs are analyzed to determine the reasons for deviations and assess their impact on project performance. Variances may be favorable (costs are lower than budgeted) or unfavorable (costs exceed the budget), and understanding the causes of variances helps project managers make informed decisions to address them effectively.
  5. Forecasting and Adjustments: As the project progresses, project managers may need to adjust budgets for scheduled work elements based on changes in project scope, schedule, or resource requirements. By tracking actual performance against the scheduled budget, project managers can forecast future cost trends and make proactive adjustments to the budget baseline as needed. This ensures that the budget remains realistic and reflective of the project’s financial requirements throughout the project lifecycle.

In summary, assigning budgets to scheduled work elements is essential for aligning project schedules with financial plans, tracking cost performance, analyzing variances, and making informed decisions to manage project costs effectively. By establishing a schedule-based budget against which actual performance can be compared, project managers can ensure financial accountability, optimize resource utilization, and maximize project success.

The total cost of the project should be estimated, and a budget defined that identifies when funds need to be available and when costs are expected to be incurred.

Estimating the total cost of the project and defining a comprehensive budget are critical steps in effective project management. Here’s why it’s essential and how it’s typically done:

  1. Financial Planning: Estimating the total cost of the project allows project managers to develop a comprehensive financial plan that outlines all anticipated expenses from initiation to completion. This financial plan serves as a roadmap for allocating resources, securing funding, and managing project finances effectively.
  2. Resource Allocation: By estimating the total project cost, project managers can allocate resources efficiently to ensure that sufficient funds are available to support project activities, deliverables, and milestones as scheduled. This includes budgeting for labor, materials, equipment, facilities, overhead, and other project expenses based on cost estimates and resource requirements.
  3. Budget Definition: Once the total project cost has been estimated, project managers define a budget that specifies the financial resources needed at various stages of the project. The budget outlines when funds need to be available and when costs are expected to be incurred, helping project stakeholders plan and allocate resources accordingly.
  4. Cash Flow Management: Defining a budget with clear timelines for fund availability and cost incurrence enables project managers to manage cash flow effectively throughout the project lifecycle. By aligning cash inflows and outflows with project activities and milestones, project managers can ensure that funds are available when needed to support project execution and minimize financial risks.
  5. Cost Tracking and Control: The defined budget serves as a baseline against which actual project costs are compared. Project managers track actual expenditures against the budget to monitor cost performance, identify variances, and take corrective actions as needed to keep the project on track financially. This helps ensure that the project is completed within budgetary constraints and delivers value to stakeholders.
  6. Communication and Accountability: A well-defined budget provides project stakeholders with a clear understanding of the project’s financial requirements, constraints, and objectives. It facilitates transparent communication about project finances, fosters accountability among project team members, sponsors, and other stakeholders, and promotes confidence in the project’s financial management.

Overall, estimating the total cost of the project and defining a budget with clear timelines for fund availability and cost incurrence is essential for effective project financial management. By developing a comprehensive budget, project managers can allocate resources efficiently, manage cash flow effectively, track cost performance, and ensure project success within defined budgetary constraints and objectives.

A method should be defined and established for managing and measuring cost performance in line with funding limits and requirements.

Managing and measuring cost performance in line with funding limits and requirements is crucial for ensuring that the project stays within budgetary constraints and delivers value to stakeholders. Here’s how a method for managing and measuring cost performance can be defined and established:

  1. Cost Baseline Establishment: The first step is to establish a cost baseline, which represents the authorized budget for the project. The cost baseline includes the total project budget, as well as budget allocations for specific phases, activities, and deliverables. It serves as the reference point against which actual costs are compared throughout the project lifecycle.
  2. Cost Performance Metrics: Define key cost performance metrics and indicators that will be used to measure and evaluate project financial performance. Common metrics include Cost Variance (CV), which compares actual costs to the budgeted costs, and Cost Performance Index (CPI), which measures the efficiency of cost performance relative to the budget.
  3. Reporting and Monitoring Mechanisms: Establish reporting and monitoring mechanisms to track and analyze cost performance on an ongoing basis. This may involve regular financial reporting, variance analysis, and dashboard updates to communicate cost status, trends, and variances to project stakeholders.
  4. Change Control Processes: Implement change control processes to manage changes to the project scope, schedule, and budget effectively. Changes that impact project costs should be evaluated, approved, and documented through a formal change management process to ensure alignment with funding limits and requirements.
  5. Risk Management Strategies: Develop risk management strategies to identify, assess, and mitigate cost-related risks that may impact project performance. Proactively addressing potential risks, such as cost overruns, budget constraints, and funding uncertainties, helps minimize financial disruptions and ensures project success.
  6. Cost Forecasting and Adjustments: Use cost forecasting techniques, such as Earned Value Management (EVM), to predict future cost trends and anticipate potential variances from the budget. Based on these forecasts, make proactive adjustments to the project budget, resource allocations, and financial plans as needed to address emerging cost-related challenges and opportunities.
  7. Stakeholder Communication: Maintain open and transparent communication with project stakeholders regarding cost performance, funding limits, and financial requirements. Regularly engage stakeholders in cost reviews, budget discussions, and decision-making processes to ensure alignment with project objectives and stakeholder expectations.
  8. Continuous Improvement: Continuously evaluate and improve cost management processes, tools, and techniques based on lessons learned and best practices. Identify opportunities for optimization, efficiency gains, and cost-saving initiatives to enhance project financial performance and deliver greater value to stakeholders.

By defining and establishing a method for managing and measuring cost performance in line with funding limits and requirements, project organizations can effectively monitor project finances, mitigate financial risks, and ensure project success within budgetary constraints and objectives. This proactive approach to cost management helps enhance financial transparency, accountability, and control throughout the project lifecycle.

Objective measures of cost performance should be established when budgeting. Setting objective measures before cost performance assessments enhances accountability and avoids bias.

Establishing objective measures of cost performance during the budgeting process is essential for promoting transparency, accountability, and unbiased evaluation of project finances. Here’s why setting objective measures beforehand is crucial and how it can be achieved:

  1. Transparency and Accountability: Objective measures provide clear and transparent criteria for assessing cost performance, ensuring that project stakeholders understand how cost performance will be evaluated and measured. This transparency fosters accountability among project team members, sponsors, and other stakeholders, as everyone knows what is expected in terms of financial management.
  2. Avoidance of Bias: Setting objective measures helps avoid subjective interpretation or bias in evaluating cost performance. Objective criteria are based on quantifiable metrics, such as cost variances, cost performance indices, or compliance with budget thresholds, rather than subjective opinions or preferences. This ensures fairness and consistency in assessing cost performance across different projects, teams, or individuals.
  3. Alignment with Project Objectives: Objective measures should be aligned with project objectives, goals, and constraints to ensure that cost performance assessments reflect the project’s strategic priorities and success criteria. By establishing clear objectives upfront, project managers can define relevant performance metrics that directly contribute to achieving project outcomes and delivering value to stakeholders.
  4. Early Identification of Issues: Objective measures enable early identification of cost-related issues or deviations from the budget, allowing project managers to take timely corrective actions to address emerging challenges. By monitoring objective performance metrics regularly, project managers can detect cost variances, trends, or anomalies and intervene proactively to mitigate risks and prevent cost overruns.
  5. Continuous Improvement: Objective measures provide a basis for continuous improvement in cost management practices and processes. By analyzing performance data against established metrics, project managers can identify opportunities for optimization, efficiency gains, and cost-saving initiatives to enhance project financial performance and deliver greater value to stakeholders over time.

To establish objective measures of cost performance when budgeting, project managers should:

  • Define clear and specific performance metrics, such as Cost Variance (CV), Cost Performance Index (CPI), or Planned Value (PV), that align with project objectives and constraints.
  • Set threshold values or targets for each performance metric based on budgetary constraints, funding limits, or industry standards.
  • Ensure that performance metrics are quantifiable, measurable, and relevant to project goals, allowing for meaningful assessment and comparison of cost performance.
  • Communicate performance expectations and measurement criteria to project team members, stakeholders, and decision-makers to ensure alignment and understanding.
  • Regularly monitor and evaluate cost performance against established metrics throughout the project lifecycle, using objective data and analysis to drive decision-making and corrective actions as needed.

By adhering to these principles and practices, project organizations can establish objective measures of cost performance during budgeting, enhancing accountability, transparency, and effectiveness in managing project finances and delivering successful outcomes.

Project cost estimating and budgeting are closely linked.

Project cost estimating and budgeting are closely linked processes that work together to ensure effective financial management throughout the project lifecycle. Here’s how they are interconnected:

  1. Cost Estimating as a Foundation: Cost estimating is the process of approximating the costs associated with project activities, resources, and deliverables. It involves identifying, quantifying, and analyzing the resources required to complete project tasks, such as labour, materials, equipment, and overhead expenses. Cost estimating provides the foundation for developing the project budget by providing estimates of the financial resources needed to execute the project successfully.
  2. Budget Development Based on Cost Estimates: Once cost estimates have been obtained for all project components, project managers use this information to develop the project budget. The budget represents the total financial plan for the project, including allocations for labour, materials, equipment, facilities, overhead, contingencies, and other expenses. Budget development involves aggregating cost estimates, defining funding requirements, and establishing financial constraints and allocations to support project execution.
  3. Alignment of Estimates with Budget: Cost estimates and the project budget must be aligned to ensure consistency and accuracy in financial planning and resource allocation. Cost estimates provide the basis for establishing budgetary targets, thresholds, and allocations, while the budget serves as a framework for managing project finances and controlling costs throughout the project lifecycle. Aligning estimates with the budget helps ensure that adequate financial resources are allocated to support project activities, deliverables, and milestones as planned.
  4. Tracking and Monitoring Cost Performance: Cost estimating and budgeting are both essential for tracking and monitoring cost performance throughout the project lifecycle. Cost estimates serve as benchmarks for comparing actual costs against budgeted costs, while the budget provides a baseline against which cost performance is measured. By tracking actual expenditures, analyzing cost variances, and implementing corrective actions as needed, project managers can ensure that the project stays within budgetary constraints and delivers value to stakeholders.
  5. Adjustments and Revisions: As the project progresses, cost estimates and the project budget may need to be adjusted or revised based on changes in project scope, schedule, resource requirements, or external factors. Project managers continuously evaluate cost estimates and budgetary allocations, making adjustments as needed to address emerging challenges, opportunities, or risks. This iterative process of cost estimating and budgeting ensures that financial plans remain realistic, flexible, and aligned with project objectives and constraints.

Overall, project cost estimating and budgeting are integral components of effective financial management in project management. By closely linking these processes, project managers can ensure accurate estimation of project costs, development of realistic budgets, effective tracking of cost performance, and proactive management of project finances to achieve project success within defined budgetary constraints and objectives.

Reserves or contingency items not assigned to activities or other work scope elements can be created and used for management control or to cover unforeseen costs.

creating reserves or contingency items that are not assigned to specific activities or work scope elements can provide valuable flexibility and management control in project management. Here’s how reserves or contingency funds can be utilized:

  1. Risk Management: Reserves or contingency funds serve as a buffer to address unforeseen risks, uncertainties, and changes that may impact project costs. By setting aside contingency funds, project managers can proactively mitigate the financial impact of potential risks, such as scope changes, resource constraints, market fluctuations, or technical challenges.
  2. Management Control: Reserves or contingency funds provide project managers with discretionary funds to address emergent needs, opportunities, or priorities that may arise during project execution. These funds can be used to expedite critical activities, capitalize on strategic opportunities, or address urgent issues without disrupting the project budget or timeline.
  3. Flexibility and Adaptability: Reserves or contingency funds offer flexibility and adaptability to accommodate changes in project requirements, priorities, or constraints. Project managers can allocate contingency funds as needed to respond to evolving circumstances, adjust project plans, or reallocate resources to optimize project performance and outcomes.
  4. Contingency Planning: Reserves or contingency funds support contingency planning efforts by ensuring that financial resources are available to address potential cost overruns or unforeseen events. Project managers can develop contingency plans that outline how contingency funds will be used to manage specific risks or scenarios, providing a proactive framework for addressing uncertainties and minimizing project disruptions.
  5. Stakeholder Confidence: Having reserves or contingency funds in place enhances stakeholder confidence in project management’s ability to effectively manage project risks and uncertainties. Stakeholders, including project sponsors, investors, and clients, are reassured by the presence of contingency reserves, knowing that financial safeguards are in place to protect project interests and ensure project success.
  6. Emergency Situations: Reserves or contingency funds can be used to address emergencies or unforeseen crises that threaten project continuity or viability. Project managers can tap into contingency reserves to address urgent needs, stabilize project operations, and mitigate adverse impacts on project performance, reputation, or stakeholder relationships.

In summary, creating reserves or contingency items not assigned to specific activities or work scope elements provides project managers with valuable resources and flexibility to manage project risks, uncertainties, and changes effectively. By establishing contingency reserves, project managers can enhance management control, adaptability, stakeholder confidence, and resilience in addressing unforeseen challenges and opportunities throughout the project lifecycle.

Such items and how they should be spent and associated risks should be identified.

Identifying contingency items and establishing guidelines for their usage is a critical aspect of effective project management. Here’s how project managers can identify such items, determine how they should be spent, and assess associated risks:

  1. Identification of Contingency Items:
    • Project managers should conduct a comprehensive risk assessment to identify potential threats and uncertainties that could impact project cost, schedule, or scope.
    • Based on the identified risks, project managers can determine the need for contingency items to address specific risk scenarios or unexpected events.
    • Contingency items may include funds allocated for addressing scope changes, resolving technical challenges, managing resource constraints, or mitigating external risks.
  2. Guidelines for Contingency Usage:
    • Establish clear guidelines and criteria for accessing and utilizing contingency items. Define the circumstances under which contingency funds can be used and the process for requesting and approving their allocation.
    • Specify the types of expenses or activities that are eligible for funding from contingency reserves. This could include scope changes, unforeseen expenses, emergency situations, or opportunities to capitalize on strategic initiatives.
    • Define thresholds or limits for accessing contingency funds to ensure that their usage is justified and aligned with project objectives, constraints, and stakeholder expectations.
  3. Risk Mitigation Strategies:
    • Identify associated risks and potential impacts of using contingency funds. Assess the likelihood and severity of each risk scenario and develop mitigation strategies to reduce their likelihood or mitigate their impact.
    • Monitor and review contingency usage regularly to ensure that risks are effectively managed and that contingency funds are utilized judiciously and in accordance with established guidelines.
  4. Contingency Management Plan:
    • Develop a contingency management plan that outlines the procedures, responsibilities, and controls for managing contingency items throughout the project lifecycle.
    • Define roles and responsibilities for approving, monitoring, and reporting on contingency usage, ensuring accountability and transparency in decision-making.
    • Establish communication protocols for informing stakeholders about the availability, allocation, and usage of contingency funds, as well as any associated risks or changes to the contingency plan.
  5. Documentation and Reporting:
    • Document contingency items, associated risks, and usage guidelines in the project management plan or contingency plan. Maintain accurate records of contingency allocations, expenditures, and outcomes for tracking and reporting purposes.
    • Provide regular updates and reports to project stakeholders on the status of contingency funds, including any changes to contingency allocations, utilization, or risk profiles.

By identifying contingency items, establishing guidelines for their usage, and assessing associated risks, project managers can effectively manage project uncertainties, ensure prudent financial management, and enhance project resilience in the face of unforeseen challenges or opportunities.

Allocation of the budgeted funds to work activities establishes a baseline for monitoring and enables re-baselining the budget when change requests are authorized.

Allocating budgeted funds to work activities establishes a baseline for monitoring project costs and enables effective financial management throughout the project lifecycle. Here’s how the allocation of budgeted funds to work activities facilitates monitoring and re-baselining of the budget:

  1. Baseline Establishment: Allocating budgeted funds to work activities involves assigning specific financial resources to each project task, activity, or work package based on cost estimates and budgetary allocations. This establishes a baseline budget that represents the authorized financial plan for the project, serving as a reference point for tracking and controlling project costs.
  2. Cost Control and Monitoring: Once the budgeted funds have been allocated to work activities, project managers can monitor actual expenditures against the baseline budget to track cost performance throughout the project lifecycle. By comparing actual costs to budgeted costs, project managers can identify cost variances, trends, or anomalies and take corrective actions as needed to keep the project on track financially.
  3. Change Management: When change requests are authorized, such as scope changes, schedule adjustments, or resource reallocations, project managers can re-baseline the budget to reflect the updated financial plan. Re-baselining involves revising budget allocations, adjusting funding requirements, and updating cost estimates to accommodate changes in project scope, requirements, or constraints. This ensures that the budget remains accurate, realistic, and aligned with project objectives and stakeholder expectations.
  4. Budget Reconciliation: Re-baselining the budget also involves reconciling the updated budget with actual expenditures and cost performance data. Project managers review changes to the budget, assess their impact on project finances, and communicate any adjustments or revisions to project stakeholders. Budget reconciliation ensures that project finances are managed transparently, and stakeholders are informed of any changes to the financial plan.
  5. Continuous Improvement: The process of allocating budgeted funds to work activities, monitoring cost performance, and re-baselining the budget enables continuous improvement in financial management practices. Project managers can identify opportunities for optimization, efficiency gains, and cost-saving initiatives based on lessons learned from budget monitoring and re-baselining activities. This iterative process helps enhance project financial performance and deliver greater value to stakeholders over time.

In summary, allocating budgeted funds to work activities establishes a baseline for monitoring project costs, enables effective cost control and change management, and supports continuous improvement in financial management practices. By re-baselining the budget when change requests are authorized, project managers can ensure that project finances remain accurate, realistic, and aligned with project objectives throughout the project lifecycle.