Process FunctionPotential Failure ModePotential Effect(s) of FailuresseverityClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSeverityOccurrenceDetectionRPN
Quality Management System & ImplementationExternal origin standards are not updatedAffects the quality and system3SCLack of checking in the new standards3Master list of external origin standards to be updated regularly.Master list of external origin standards are reviewed by MR frequently545
Quality Management System & ImplementationMaster lists are not maintained properlyAffects the system3SCLack of awareness4Master lists to be updated regularly.Master list are reviewed by MR frequently448
Quality Management System & ImplementationUnintended use of obsolete documentsAffects the system4CCObsolete documents are not removed from all points of use4Obsolete documents are identified and seperatedBy frequent checking580“Obsolete copy” is stamped in all obsolete documents for easy identificationManagement RepresentativeAction taken to be verified after three months43448
Quality Management System & ImplementationMRM not conducted at regular intervalsAffects the system3SCImproper communication4To follow the MRM planVerifying the conduction of MRM periodically336
Quality Management System & ImplementationInternal Audits not conducted on timeQuality system failure4SCAudit plan not followed2to follow the audit planReview of audit report18
Quality Management System & ImplementationManagement of change not doneAffect the system4SCLack of awareness3monitoring in review meetingsby reviewing the minutes of meeting336
Quality Management System & ImplementationNCR’s not closed on timeaffect the system4SCRoot cause analysis not done properly2Updated NCR tracking sheetperiodic review of NCR tracking sheet432

Risk assessment of HR department

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
Human Resources – CompetencyTraining not conducted properlyAffects the quality and system4SCImproper planning for training3Training to be planned appropriately and updated in the Annual Training CalendarVerified by Top management448
Human Resources – CompetencyNon availability of competent personnel (or) Selecting unskilled personnelAffects the quality and system5CCCompetence requirements are not defined for recruitment4Personnel recruited based on defined competence requirementsVerifying the personnel competence by process heads5100Competency standard to be defined before the recruitment processHuman Resource personnelAction taken to be verified after three months53460
Human Resources – CompetencyDecrease in employee efficiencyAffects the delivery3SCImproper communication and Employee not motivated4Motivate the employee through meetings to improve their efficiencyBy reviewing the operator efficency reports.448
Human Resources – CompetencyUpdation of Legal and other applicable requirement are not doneAffects the system4SCLegal requirements are not checked periodically3Monitoring the master list of Statutory and Regulatory requirements regularlyVerified by Top management560
Human Resources – CompetencyResidency not renewed on timeAffects the operations & planning4SCnot reviewing employee file periodically4residency to be processed on timeMonitoring of the employee file regularly232

Risk assessment of Sales

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
SalesWrong entry of size designationAffects the quality3SCType Error3Reviewing of Customers’ purchase order by Commercial officerDaily review of SOS order in plan usage436
SalesOrder without contract reviewAffects the quality and delivery4SCDelay in releasing contract review3Perform contract review as soon as possible once the job is completedVerified during operations planning336
SalesPSL Level, H2S Level, Material class, Temp not specified in customer POAffects the quality3SCCustomer requirements not clearly identified in the purchase order3Reviewing of customer purchase order against product requirements by Commercial officerReview of requirements in Contract Review436
SalesDelivery date committed without proper planningAffects the Delivery4SCDate committed based on Customer requirements3Review the Customer Requirements against Purchase Order by Commercial officerDuring operations planning448
SalesWrong delivery addressAffects the Delivery4SCType error and destination not reviewed2Reviewing of delivery information against purchase order before disptachReview before dispatch540
SalesDelay in invoicing of the jobAffects the cash flow2SCcommmunation gap1Communication through proper channelkeep record of all completed jobs in job register510
Salesno proper communication of the customer requirementDelay in quotation submission4SCNo proper follow up3monitoring & follow up of all enquiriesDaily review of enquiry register560
SalesCustomer complaints not handled properlyLoss of customer4SCpoor internal communication1Communication through proper channelproper communication to avoid complaints28

Risk assessment of Design

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
DesignError in design inputsAffects the product quality4SCInadequate operating conditions3Design inputs are to be reviewed based on the customer or standard requirements before performing the process to prevent errors.During design input review448
DesignInadequate design outputsAffects the product quality and delivery4SCRelevant personnel was not aware about the requirements3Training to be given to the concerned personnel.During design output review336
DesignError in drawingAffects the product quality5CCNecessary details not mentioned properly in the drawing4Verification of the drawing to be done before issue.During design output review5100During design output Machine shop Manager shall ensure that adequate details are available in the drawing and to be verified as per given the requirements.Machine shop ManagerActions taken verified53460
DesignPersonnel competencyAffects the product quality4CCFailure in design3Training to be given to the concerned personnel.During design output review448
DesignSelection of materialAffect the product integrity4CCProduct non conformance4Specifications / MTCs shall be reviewed during the design inputDuring design input review348
DesignTolerance level not mentioned properlyAffects the product quality4SCHuman error3All the design outputs are to be reviewed during design output review based on the inputs and to be verified before approval.During design output review448

Risk assessment of Procurement

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
ProcurementsSupplier late deliveryAffects the delivery3SCDelay in production process (Unavailability of Raw material)4Some amount of raw material to be maintained in stockRegular checking of stock list336
ProcurementsError in documents provided by the supplierAffects the quality3SCTypo error3Inform the supplier to prevent typo errorVerify the documents regularly once received from supplier436
ProcurementsIndent not raised in specified time intervalDelay in Receiving Raw Material. Affects the delivery3SCPlanning not done properly in Planning stage5Machine Manager shall provide the requirements to the procurement personnel in advanceDuring operations planning230
ProcurementsQuality requirements not specified clearly in the purchase orderIndent not raised in the specified time interval5SCMaterial received with the wrong specification. Affects the Quality4Monitoring the PO before approval. Based on the review during approval of PO.5100Training given to concerned personnel about the quality requirementsProcurement personnelAction taken to be verified after three months53460
ProcurementsImproper identification of supplierAffects the quality and delivery4SCThe Person who prepares PO was unaware of the quality requirements4Updating of such data to be done regularlyPeriodic checking of supplier rating580Prepare supplier delivery performance and rejection quantity data regularlyProcurement personnelAction taken to be verified after three months43448
ProcurementsSpecification not specified clearly in the purchase orderThe specification should be as per standard requirements.3SCItem Description not Created as Per Requirement4Delay in Receiving Bought Out Items. Affects the deliveryBefore approval of purchase orders, Quality dept. verifies the requirements560
ProcurementsSupplier performance rating is not done periodically due to delay in preparing data (such as delivery time and rejection quantities)Reliability of the goods and services4SCSupplier evaluation not done before purchase of critical goods & services2Critical goods and services are identified.Critical goods and services are purchased from the list of appoved suppliers only216
ProcurementsMaterial not available at regular supplieraffects the planning and delivery4SCDead stock at supplier premises3The goods and services are not considered as critical category.Master list of suppliers336

Risk assessment of Operation

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
OperationIneffective production planAffects delivery3SCImproper planning3Production plan to be prepared effectively in advance.By verifying Production Plan545
OperationNon Availability of Project Execution PlanAffects Quality3SCProject Process Sequence in  is not in Correct Order3Awareness on Job  Training  to be givenProject Execution Plan545
OperationNon availability of equipments, tools and insertsAffects production and delivery4SCPeriodic checking of tools and inserts used for production are not done.3Tools and inserts are to be maintained regularly in stock.By reviewing required tool and inserts336
OperationNon availability of raw materialAffects production and delivery3SCMaterial not available in stock4Some quantity of Materials are to be maintained in stocks.By reviewing the stock list.448
OperationInternal non-conformanceAffects quality and delivery5CCRequirements are not addressed properly in the daily production control sheet4Ensure that the requirements are to be addressed properlyBy reviewing through in-process inspection480Verification of the Production control sheet by the Quality Engineer for the proper addressing of the requirements before the issue of the documentsQuality EngineerAction taken to be verified after three months53345
OperationImproper handlingAffects the quality4SCUnskilled person3Training to be given for concerned personnelBy monitoring the personnel336
OperationEmergency requirement for any product / itemDifficulty in purchasing the items3SCImproper planning2Minimum 3 supplier for the critical items to be identifiedBy verifying the Approved supplier list424
OperationEmployee performance reduced (or)
Not competent enough to perform a new activity.
Affects the quality and timely delivery3SCAdequate training not provided3Required training to perform the job to be given for concerned personnelsTraining Matrix436
OperationShortage of work/office space inside our facilityAffects work2Adequate space not available.3Proper layout for the work space to be designedBy verifying layout318
OperationRequirement for changing of shiftsAffects the routine activities4SCImproper planning3Required shifts to be arrangedBy Production monitoring336
OperationWorking hours affected due to RamadanAffects the timely delivery4SCImproper planning3Proper planning to be done prior start of the jobBy verifying production plan112
OperationNot enough knowledge to perform the operationsQuality of the work will be affected.4SCIncompetent personnel on the job3Training to be given for concerned personnelSkill competency matrix336
OperationDifficulty in identifying the parts of the assembly product in dismantled conditionAffects the product quality & delivery4SCPart identification number not visible on the sub assembly parts3Identification tagging to be maintained throughout the processes with reference to production plan/Job NumberIdentification on each item by either SRV # or Job #448
OperationProducts damaged due to improper handling (within the facility / while transporting to the customer)Affects the product quality4SCImproper Handling of the material3Proper protection for critical components to be providedBy verifying at the time of dispatch336
OperationUnexpected Power cutsAffects the delivery1Ministry issue1Alternate power source to be made availableRequested for alternate power source arrangement22
OperationErrors identified in the Manufacturer provided features.Affects the customer satisfaction4SCPoor quality of products delivered by manufacturers3Supplier evaluation needs to be conducted periodicallyBy supplier evaluation336
OperationProductivity effects due to Climate changeAffect the quality & delivery4SCAdditional responsibility & authority to be provided to on-site personnel4Identify contingency plan to mitigate climate change by identifying alternated production siteAdditional responsibility & authority to be provided to on-site personnel116

Risk assessment of Maintenance

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
MaintenancePeriodic maintenance not doneAffects cost and delivery3SCCarelessness of the operator3Proper preventive maintenance shall be done as per the planFrequent checking to be done327
MaintenanceDelay in completion of break downAffects cost and delivery4SCNon availability of spares4Maintaining minimum stock (spare parts) in storeChecking with break down register580Critical spares shall be identified and maintained in stockMachine shop ManagerAction taken to be verified after three months43448
MaintenanceDelay in preventive maintenanceAffects cost and delivery4SCPreventive maintenance schedule not followed4Preventive maintenance to be done as per the scheduleFrequent checking to be done348
MaintenanceImproper preventive maintenanceAffects cost and delivery3SCChecklists prepared are inappropriate to the machine to be maintained3Checklists are to be prepared as per the manufacturer’s specificationChecking with Manufacturer’s specification545
MaintenanceIncompetent personnelAffects quality & cost4SCSelection criteria not defined3Skill competency matrix preparedReview of training effectiveness336
MaintenanceDelay in availability of machines sparesAffects cost and delivery4SCnon availability of spares locally3Plan to have spares in stockReview of the suppliers list448
MaintenanceNon availability of support from the manufacturer of the machineaffects cost and delivery4SCAuthorised services of manufacturer is not available locally4Outsourcing the serviceCommunication with service providers232

Risk assessment of Quality Control

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
Quality Control/ Quality AssuranceIndication found in Mill TCAffects the quality4SCTypo error3Inform the supplier to prevent typo error while preparing Mill TCBy checking MTC during incoming inspection448
Quality Control/ Quality AssuranceInstrument errorAffects the quality5SCImproper handling of the instuments4Training to be given to conerned personnel about instrument handlingMonitor the personnel while handling the instruments480Instrument to be sent for calibration.
Out of calibration requirements to be ensured.
QA/QC EngineerAction taken to be verified after three months53345
Quality Control/ Quality AssuranceSome instruments are not calibrated beyond due dateAffects the quality3SCCalibration plan not updated3Calibration due date to be checked by concerned personnel regularlyUsing calibration plan436
Quality Control/Quality Control/ Quality AssuranceDifficulty in identifying the materialAffects the system and quality4SCIdentification tag not tied on the product3Identification tag is tied after the completion of process.By verifying visually336
Quality Control/ Quality AssuranceImproper identification and traceabilityAffects the system4SCIdentification number not replaced when damaged3Identification number properly replaced when it is found damagedMonitored regularly by Concerned personnel448
Quality Control/Quality Control/ Quality AssuranceDelivery of Non-conforming productsCustomer dissatisfaction5CCFinal inspection not performed prior dispatch3Final inspection is performed by the QC Engineer prior to dispatchUsing Production and quality plan230Products to be called back and assessed as per control of NC products.QA/QC EngineerAction taken to be verified after three months51210
Quality Control/ Quality AssuranceWrong material taken for the productionProduct nonconformity5CCidentification of the material not done properly3Color code is assigned for the materials.By verifying color code & traceability of the material prior to use.230Precautions shall be taken to prevent such errors by verification of the traceability before use.QA/QC EngineerAction taken to be verified after three months51210
Quality Control/ Quality AssuranceIncompetent personnelAffect quality of the product4SCNo proper training provided to the personnel3Training matrix is preparedBy verifying the effectiveness of the training224

Risk assessment of Store

Process FunctionPotential Failure ModePotential Effect(s) of FailuressevClassPotential Cause(s)/Mechanism(s) of FailuresOccurCurrent Process Controls PreventionCurrent Process Controls DetectionDetectRPNRecommended Action(s)Responsibility & Target Completion DateAction TakenSevOccDetRPN
StoreMaterial received without Supplier Invoice Affects the system3SCSupplier unawareness3Inform the supplier to provide invoiceWhen receiving material436
StoreWrong entry of Part No. / heat codeAffects the system and quality3SCHuman error / Typo error3Create awareness about the importance of this activityCheck the store issue and receiving records545
StoreRust formation on machined partAffects the quality4SCRust preventive oil not applied / exposed to moisture4Rust preventive oil applied and stored after machiningVisual Inspection during cycle count580Instruction given to the concerned personnel about the rust prevention methodsQA/QC Engineer / Stores InchargeAction taken to be verified after three months43448
StoreExposed Sealing surfaces damagesAffects the quality3SCImproper preservation2Stored in a separate area to prevent damagesRegularly636
StoreDelivery note issued to customer with wrong information  Customer dissatisfaction4SCno proper information2store receipt voucher is prepared to identify the received itemsstore receipt voucher is prepared to identify the received items & verified by QA/QC432
StoreUnexpected Power cutsAffects the quallity2Ministry issue1Alternate power source to be made availableRequested for alternate power source arrangement36
StoreWrong shipment done to the customerCustomer dissatisfaction4SCCommunication Gap1Proper communication to be done through proper channelstore keeper to ensure the correct information is taken for the shipment312

3 thoughts on “ISO 9001 Example of Risk assessment

  1. Dear Mr. Pretesh Biswas,

    I really thank you for this Risk Assessment example sheet shared, mainly the M.R. where many industries skip or unaware of the Risk assessment of M.R. itself. I appreciate your devotion in this field.

    With Best Regards, Shankar Ghosh

  2. Dear Mr. Pretesh Biswas,
    Thank you very much for your sample sheet of Risk Asessment. Could yo please help explain define initial words at the head of each form

Leave a Reply