Example of documentation template for Production and Maintenance

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Production and Maintenance. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Consolidated Timesheet for the month

2. Daily Work Control and Time sheet

    SN.    Empl. No.    NAME    DESIGNATION  Working TimeTime allocation
JO /    /           JO /    /           JO /    /           Maintainance/  Other Works 
InOutHRSOTHRSOTHRSOTHRS/OT OT 
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               

3 Production Planning and Control

  S.No  Job No  Client  Description  QTYDateAllocationReview
DeliveryMaterialProductionINSP & TEST  Men  Machine  Completion  Performance
Client Req.In ShopStartEndFinal
              
              
              
              
              
              
              
              
              
              
              
              
              
              
              
              
              
Prepared by                                                                                                             

Approved by:  

4. Customer /Supplier Property Record

    S. No.  Receipt / Delivery Order No.    Date  J.O / W.O. No.    Customer / Supplier NameType of Property    Description  Qty. / Copy No.  Disposition details & date    Receipt By
Product / Instrument Identification No.Document Ref No. (with current Rev No. and Date)
           
           
           
           
           
           
           
           
           
           
           
           
           
           
Prepared By: Approved By:
Name:Name:
Sign:Sign:
Date:Date:
Issue No / Date : xx/xx.xx.xxxx
Rev No / Rev Date: xx/xx.xx.xxxx

5.0 Operation and Execution Plan

Product / Service Details

Asset Owner / Client 
Job description 
Purchase order Location 
JOB NO Country 

Section I: General

Synopsis:


1.1 Scope of Work:

1.2 Location (Suitable work environment):


1.3 Codes and Specifications:


Section II: Initial Information about the Job

2.1 Product / Customer Specified requirements:
S. NoProduct DescriptionQuantityCustomer requirement
    
2.2 Legal and Other applicable requirements:  

2.3: Design and Development Requirements:  


Section III: Activities and Responsibilities

S. NoActivities (Operational, inspection and testing activities)ResponsibilitiesTarget Date
1  
2  
3  
4  
5  
6  
7  
8  
9  
10  
11  

Section IV: Risk Assessment, Contingency & MOC

Scope:
Risk:

Action taken:

Conclusions from the risk assessment:

Section V: Method Statement

S. NoActivities (Operational, inspection and testing activities)Reference Standard / Procedures / Work Instruction
1  
2  
3  
4  
5  
6  
7  
8  

Section VI: Required Resources and Records

6.1 Resources (Machines / Equipment / Manpower)
6.2 Records

6. Breakdown Maintenance Report

EQUIPMENT Details  M/C No. 
Manufacturer Serial No. 
Breakdown reported by Date 
TOTAL BREAKDOWN HOURS
PROBLEM DESCRIPTION
PROBLEM DIAGNOSED
REMEDIAL ACTION TAKEN
PARTS REPAIRED & REPLACED
ADDITIONAL REMARK
Maintenance Engineer
(Name & Signature & Date)
Operationa Manager
(Name & Signature & Date)

7. Breakdown Maintenance Register

Sr. No.DateMachine No.Reason for breakdownDamaged partsDown timeRe-startSpare usedSign of MechanicRemarks
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
Total Breakdown Hours :
Prepared byReviewed byApproved by
NameNameName
Signature Signature Signature 
Date Date Date 
Issue No / Date : xx/xx.xx.xxxx
Rev No / Rev Date: xx/xx.xx.xxxx

8. Complete Overhauling / Reconditioning Plan

EQUIPMENT DETAILS SOS M/C NO. 
MANUFACTURER SERIAL NO. 
START DATE COMPLETION DATE 
MECHANICALELECTRICAL
AHYDRAULIC SYSTEMYES/ NoAPOWER SUPPLYYES / NO
1)Pump 1)Incoming Power Supply 
2)Valves 2)Earthing 
3)Hydraulic Lines BCONTROL WIRING(Control panel)
4)Lubrication System 1)MCB’S & Contractors 
5)Filtering System 2)Fuses & Terminal Blocks 
6)Clutch System (If any) 3)Relays & Timers 
BGUIDS & MOVEMENT4)Push Buttons & Lights 
1)Scrapping (If needed) 5)Wiring 
2)Polishing of Guide & Bed CPOWER WIRING(Control Panel)
CMAINDRIVE 1) MCCB 
1)Gears & Shafts 2)MCB’S & Contractors 
2)Bearings 3)Fuses & Terminal Blocks 
3)All Moving & Engaging Parts 4)Wiring 
DFEED SYSTEMDMACHINE SIDE
1)Gears & Shafts 1)Motors 
2)Beams 2)Coolant pump 
3)Head Screw 3)Lights 
4)screw Nut / Sleeve 4)Wiring 
Remarks:
Prepared by Reviewed by Approved by 
Name Name Name 
Signature Signature Signature 
Date Date Date 
Iss No / Date : 01/20.07.2020
Rev No / Rev Date: 00/–

9. Annual Preventive maintenance plan

SRL#MACHINE NAMEASSET #DAILYWEEKLYMONTHLYQUARTERLYYEARLY
1AIR COMPRESSOR             Daily__Mar,Jun,spt,dec25-Dec
2RADIAL DRILLING M/C Daily__Mar,Jun,spt,dec23-Dec
3LATHE M/C DailyThursday_Mar,Jun,spt,dec26-Dec
4VTL M/C DailyThursday11th_24-Dec
5MILLING M/C DailyThursday10th_21-Dec
6BORING M/C DailyThursday10th_21-Dec
7PIPE THREADING M/C _Monday12th_23-Dec
8 FURNACE _Tuesday13th 21-Dec
9ELECTRODE OVEN DailyTuesday5th_17-Dec
10WELDING M/C _Saturday15th_30-Dec
11SA WELDING M/C Daily__Mar,Jun,spt,dec21-Dec
12OVERHEAD CRANE  _Wednesday5th_22-Dec
13BENCH GRINDER _Tuesday10th_27-Dec
14ELECTRODE QUIVER DailySaturday15th_30-Dec
15BANDSAW CUTTING M/C DailyMonday10 th_20-Dec
16PIPE BEVELING M/C  _Sunday11th_27-Dec
17HYDROSTATIC TEST PUMP DailyWednesday5th_20-Dec
18Air PRESSURE PUMP  DailyWednesday5th_20-Dec
19WATER PRESSURE PUMP  DailyWednesday5th_20-Dec
20TORQUE WRENCH PUMP Daily__Mar,Jun,spt,dec20-Dec
21SAND BLASTING MACHINE DailyMonday20th_19-Dec
22PORTABLE AIR COMPRESSOR             Daily__Mar,Jun,spt,dec25-Dec
23HIGH PRESSURE PAINT SPRAYER M/C Daily_20th_19-Dec
24ELECTRODE OVEN DailyTuesday5th_17-Dec
Prepared by Reviewed by Approved by 
Name Name Name 
Signature Signature Signature 
Date Date Date 
Issue No / Date :xx/xx.xx.xxxx
Rev No / Rev Date: xx/xx.xx.xxxx

10. Preventive Maintenance Checklist

Month/Year:            Machine Name:                Machine ID / No
FrequencySl.NoActivityDays
12345678910111213141516171819202122232425262728293031
Daily1                               
2                               
3                               
4                               
 
Quarterly1                               
2                               
3                               
 
Yearly1                               
2                               
3                                
4                                
Last PM Month: Quarterly: Half Yearly: Yearly: 
Remarks:                                 

11 Preventive Maintenance Checking Parameters

  1. Preventive Maintenance For Air Compressor
    • Daily:
      • a) Clean the compressor
      • b) Check the oil level
      • c) Check the coolers & Clean if required
      • d) Check for any oil leakage
    • Quarterly:
      • a) Check the section coolers
      • b) Remove air filter and clean
      • c) Check all the flexible hoses
    • Yearly:
      • a) Replace Oil filters
      • b) Change Oil
      • c) Change Oil separator
      • d) Check all electrical and safety controls
  2. Preventive Maintenance for Drilling Machine
    • Daily:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check hydraulic oil level
      • d) Check for any oil leakage
    • Quarterly:
      • a) Check all the electrical controllers
      • b) Apply grease on greasing points
    • Yearly:
      • a) Check all functions of machine
      • b) Check all the electrical and safety controls
      • c) Change spares as required
  3. Preventive Maintenance For Lathe Machine
    • Daily:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the oil level
      • d) Check for any oil leakage
    • Weekly:
      • a) Check the coolant tank
      • b) Apply grease on greasing ports
      • c) Check the spindle unit
    • Quarterly:
      • a) Check all the electrical and safety controls
      • b) Clean the coolant tank and Top up the coolant
      • c) Check the hydraulic unit
    • Yearly:
    • a) Overall cleaning of the machine
    • b) Check the overall conditions of machine c) clean & change the parts as required
  4. Preventive Maintenance for VTL Machine
    • Daily:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the oil level
      • d) Check for any oil leakage
    • Weekly:
      • a) Check lead screws & feed shaft
      • b) Apply grease on greasing ports
    • Monthly:
      • a) Check main spindle unit
      • b) Clean the coolant tank and Top up the coolant
      • c) Check & adjust lead screw nuts
      • d) Check the cross bar leveling & Adjust if required
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Check the overall conditions of machine c) clean & change the parts as required d) Check all the electrical devices
  5. Preventive Maintenance for Milling Machine
    • Daily:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the oil level
      • d) Check for any oil leakage
    • Weekly:
      • a) Check lead screws & feed shaft
      • b) Apply grease on greasing ports
    • Monthly:
      • a) Check main spindle unit
      • b) Clean the coolent tank and Top up the coolent
      • c) Check & adjust leadscrew nuts
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Check the overall conditions of machine
      • c) Clean & change the parts as required
      • d) Check all the electrical devices
  6. Preventive Maintenance for Boring Machine
    • Daily:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the oil level
      • d) Check for any oil leakage
    • Weekly:
      • a) Check lead screws & feed shaft
      • b) Apply grease on greasing ports
    • Monthly:
      • a) Check main spindle unit
      • b) Clean the coolent tank and Top up the coolent
      • c) Check & adjust leadscrew nuts
      • d) Check main drive belt
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Check the overall conditions of machine
      • c) clean & change the parts as required
      • d) Check all the electrical devices
  7. Preventive Maintenance for Pipe Threading M/C
    • Weekly:  
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the foot switch
      • d) Check the emergency stop
    •   Monthly:  
      • a) Check the electrical devices
      • b) Check & lubricate the gear box
      • c) Check & stop oil leakage  
    • Yearly:  
      • a) Overall cleaning of the machine
      • b) Check the overall conditions of the machine
      • c) Check all the electrical devices
      • d) Clean & change parts as required
  8. Preventive Maintenance for furnace
    • Weekly:
      • a) Clean the machine
      • b) Lubricate all moving parts
      • c) Check the foot switch
      • d) Check the emergency stop
    • Monthly:
      • a) Check the electrical devices
      • b) Check & lubricate the gear box
      • c) Check & stop oil leakage
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Check the overall conditions of the machine
      • c) Check all the electrical devices
      • d) Clean & change parts as required
  9. Preventive Maintenance for Electrode oven
    • Daily:
      • a) Check the A/C cables
      • b) Check the A/C plug
    • Weekly:
      • a) Check the thermostat
      • b) Check the temperature
    • Monthly:
      • a) Overall function checking of the oven
      • b) Overall cleaning of the oven
      • c) Clean the thermostat
    • Yearly:
      • a) Overall cleaning of the oven
      • b) Overall functional checking of the oven
      • c) Change the parts if required
  10. Preventive Maintenance for Welding Machine
    • Daily:
      • a)Clean the machine
      • b) Check the cables
      • c) Check the cooling system
    • Quarterly:
      • a)Check the flow meter/regulator
      • b)check the cables
      • c)Check the electrode holder
    • Yearly:
      • a)Check the electrode holder
      • b)Check wear & tear on cables
      • c) Check the isolation switch
      • d)Change the parts as required
  11. Preventive Maintenance for SA Welding Machine
    • Daily:
      • a)Clean the machine
      • b)Lubricate All Moving Parts
      • c)Check for any oil leakage
    • Quarterly:
      • a)Check the limit switches
      • b)Check & fill Lubricating Oil
      • c)Check & clean Job Holder
    • Yearly:
      • a)Overall cleaning of the machine
      • b)Check all electrical connections
      • c) Check all the functions
      • d)Check and change parts if required
  12. Preventive Maintenance for Overhead crane
    • Weekly:
      • a)Check cables
      • b)Check the safety switches
      • c)Check for the propper functioning of remote control
    • Monthly:
      • a)Check lifting slings
      • b)Check the lifting hook condition
      • c)Check the oil level in gear motor
    • Yearly:
      • a)Overall cleaning
      • b)Check all electrical parts
      • c) Change the parts if required
  13. Preventive Maintenance for Bench Grinder
    • Weekly:
      • a) Clean & remove grinding stone particles
      • b) Check the grinding wheel
      • c) Dress the wheel
    • Monthly:
      • a) Check the machine guards
      • b) Check the electrical connections
      • c) Apply grease on greasing points
    • Yearly:
      • a) Check the main power supply
      • b)Check the spindle bearing
  14. Preventive Maintenance for Electrode Quiver
    • Daily:
      • a)Check the A/C cables
      • b)Check the A/C plug
    • Weekly:
      • a)Check the thermostat
      • b)Check the temperature
      • Monthly:
        • a)Overall function checking of the oven
        • b)Overall cleaning of the oven
        • c)Clean the thermostat
    • Yearly:
      • a)Overall function checking of the oven
      • b)Overall cleaning of the oven
      • c) Change the parts if required
  15. Preventive Maintenance for Band saw Cutting Machine
    • Daily:
      • a) Clean the machine
      • b)Check blade for wear
      • c)Check functionality of shield & emergency stop
    • Weekly:
      • a)Remove shavings from coolant tank
      • b)Clean pump suction filter & suction zone
    • Monthly:
      • a)Check the tightening of the drive wheel screw
      • b)Check the blade guide bearings
    • Yearly:
      • a)Check the tightening of the screws of the motor, pump, & accident protection guard
      • b)Changing gear oil
      • c)Check the tightening of the drive wheel screws
  16. Preventive Maintenance for Pipe Beveling Machine
    • Weekly:  
      • a)Clean the machine
      • b)Lubricate all moving parts
      • c)Check for any physical damage  
    • Monthly:  
      • a)Overall cleaning of the machine
      • b)Check the overall conditions of the machine
      • c)Check the electric & pneumatic
      • motors  
    • Yearly:  
      • a)Overall cleaning of the machine
      • b)Check the overall conditions of the machine
      • c)Check the electric & pneumatic motors
      • d)Clean & change the parts as required
  17. Preventive Maintenance for Hydrostatic Test Pump
    • Daily:
      • a) Clean the Pump
      • b)Check for any leakage
    • Weekly:
      • a)Check the Valves
      • b)Check the Hoses
    • Monthly:
      • a)Check & Clean the Air filter
      • b)Check the safety Valve
      • c)Check the NRV
    • Yearly:
      • a)Overall cleaning of the pump
      • b)Do the functional test
      • c)Change the parts if required
  18. Preventive Maintenance for Air Pressure Pump
    • Daily:
      • a) Clean the Pump
      • b) Check for any leakage
    • Weekly:
      • a) Check the Valves
      • b) Check the Hoses
      • c) Lubricate the parts
    • Monthly:
      • a) Check & Clean the Air filter
      • b) Check the safety Valve
    • Yearly:
      • a) Overall cleaning of the pump
      • b) Electrical motor inspection
      • c) Replaced damaged seals & hoses
  19. Preventive Maintenance for Water Pressure Pump
    • Daily:  
      • a) Clean the Pump
      • b)Check for any leakage   
    • Weekly:  
      • a)Check the Valves & hoses
      • b)Check the tightening of the fittings
      • c)Check for any damage in power codes  
    • Monthly:  
      • a)Check & Clean the filters & nozzles
      • b)Check the correct oil level  
    • Yearly:  
      • a)Pump oil & filters replaced
      • b)Filters & nozzles replaced
      • c)All valves are checked & cleaned
  20. Preventive Maintenance for Torque Wrench Pump
    • Daily:
      • a) Check couplings,lock pins & safety cables
      • b) Inspect blast hose, couplings & nozzle holders for leaks
      • c) Check all external piping, control hoses & valves for leaks
    • Weekly:
      • a) Inspect the blast hose for wear & worn
      • b) Check the nozzle & washer condition
      • c) Check & clean the filter
    • Monthly:
      • a) Check for wear pop-up valves urethane coating
      • b) Inspect the rubber pop-up seal,replace at first sight of wear or cracking
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Inspect the whole machine & replace any parts if required
  21. Preventive Maintenance for Sand Blasting Machine
    • Daily:
      • a)Check couplings,lock pins & safety cables
      • b)Inspect blast hose, couplings & nozzle holders for leaks
      • c)Check all external piping, control hoses & valves for leaks
    • Weekly:
      • a)Inspect the blast hose for wear & worn
      • b)Check the nozzle & washer condition
      • c)Check & clean the filter
    • Monthly:
      • a)Check for wear pop-up valves urethane coating
      • b)Inspect the rubber pop-up seal,replace at first sight of wear or cracking
    • Yearly:
      • a)Overall cleaning of the machine
      • b)Inspect the whole machine & replace any parts if required
  22. Preventive Maintenance for Portable Air Compressor  
    • Daily:
      • a)Clean the compressor
      • b)Check the oil level
      • c)Check the coolers & Clean if required
      • d)Check for any oil leakage
    • Quarterly:
      • a)Check the section coolers
      • b)Remove air filter and clean
      • c)Check all the flexible hoses
    • Yearly:
      • a)Replace Oil filters
      • b)Change Oil
      • c)Change Oil separator
      • d)Check all electrical and safety controls
  23. Preventive Maintenance for High Pressure Paint Sprayer Machine
    • Daily:
      • a) Flush hose & gun
      • b) Drain water from air filter
      • c) Clean the suction tube
    • Monthly:
      • a) Check & tighten all fluid connections
      • b) Check for any leakage
      • c) Clean fluid line filter
    • Yearly:
      • a) Overall cleaning of the machine
      • b) Check hoses,tubes & couplings replace if required
  24. Preventive Maintenance for Electorde Oven
    • Daily:
      • a) Check the A/C cables
      • b)Check the A/C plug
    • Weekly:
      • a)Check the thermostat
      • b)Check the temperature
    • Monthly:
      • a)Overall function checking of the oven
      • b)Overall cleaning of the oven
      • c)Clean the thermostat
    • Yearly:
      • a)Overall function checking of the oven
      • b)Overall cleaning of the oven
      • c) Change the parts if required
Prepared by :Approved by :
Signature :Signature :
Designation :Designation :

Leave a Reply