Example of documentation template for Tooling Mfg & Management

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Tooling Mfg & Management in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Process of Tooling Mfg & Management

2.0 Turtle Diagram of Process of Tooling Mfg & Management

3.0 TOOL , GUAGE JIG AND FIXTURE REQUEST FORM

From Engg. Department to Tool Room
  Date …….
Project Name. ……….
Tooling Drawing no. ……….  
Part Name …………….                                          Part No. …………..
Customer Code  …………………

To be developed for (Modification,New,Spare,Prototype or other)…………….    


Items attached are;-   1) Part Dwg.   2) Sample part ( if available )  

Received by  



Signature of Engg. HOD:                                                     Signature of T/R HOD:

4.0 Activity Timing Plan (PERT)

Part  NameProject Name ;-                                                                                     Tool , Gauges, Jig & Fixtures Descripation ;–Date Updated :
Die Fitter Name 
Sl NoActivityWeeks        
 Days                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
  P                                                    
A                                                    
LegendPM Planned MarkedCM Completed MarkedMP Progress Marked DMDelay markedHM Holiday markedMM Planning after Modification
  Remarks
Prepared By Approved by

5.0 Tool, Gauges, Jig & Fixture Development Plan

Date  Tool Name & ID Code ;————————————–
 Project Name ;-
S. No.Activity Planned    ResponsilbilityStarting DateCompletion dateRemarks / status
PlannedActualPlannedActual
  










      
  Cost Calculation:
    S.No  Material Specfication  Total Qty. required  Material Cost  Man-HourTotal Man hour Cost (b)Machining Cost (C )  Miscellaneous cost (d)  Total Planned Cost(a+b+c+d)  Total Actual Cost(a+b+c+d)
  Planned  Actual (a)  Planned (a)  Actual (a)  Planned (b)  Actual (b)  Planned  Actual (c)
              
              
              
              
              
              
              
              
              
              
Prepared By Approved By

6.0 Inspection Report

PROJECT NAME:
 DATE:                                                                                                                             IR NO ;
COMPONENT NAME               :-
  TOOL NAME                              :-
  S.NO  STAGESUPPLIER NAME  CHECK PARAMETER  SPEC. WITH TOLR.OBSERVATIONS  STATUS  Remarks
INTERNALEXTERNAL12345
             
           
             
           
           
             
           
           
             
           
           
             
           
           
           
             
           
           
           
             
           
           
           
             
           
           
           
  CHECKED BY:-                         

APPROVED BY:-

7.0 Job Card

    JOB CARDCOMPONENT NAME :
  REF. DRAWING NO.    :
  S.NOTOOL, GAUGES , JIG& FIXTURE DESCRIPTION  OPREATOR NAME  MACHINE NAME  MACHINE NO.  SPECIFICATION  TYPE OF OPERATION  STARTING DATE & TIME  COMPLETION DATE  REMARKS
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          

8.0 Rejection Disposal Note

  Disposal Note for Rejected Tools
  Deptt.:      Period :
  S.No.Material receipt DateExternal /Internal agency Name  Tool NameIndividual part nameOperation perfomed  IR No  Receipt Qty  Reject Qty  Reason of Rejection  Action on Rejection  Loss ( In Rs. )  Remarks
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
    Prepared By    Verified By    Approved by

9.0 Inspection Checklist For Tools,Gauges ,Jig & Fixture

Inspection Checklist For Tools,Gauges ,Jig & Fixture
  Project Name.;-  Die Fitter Name  :-Select Tool Operation
BLDRPIBNDNTCJIG & FIXTURES
  Part Name;-  Date;-STMFLTBEEDCRUSHASSY.Gauges
Part No ;-
  Class.  Inspection parametersSTATUS  Remarks
OKNOT OK
  1. Safetya) Are tapped shank and loading bolts safe?   
c) Is there any sharp corner ?  
  2. Tightening of bolta) Is tightening of normal kinds of BOLT good?   
b) Is the fitted-length of DOWEL PIN over 2 times of diameter?  
          3. Draw die And location check  a) Are necessary/sufficient sheet gauges/location pins and stopper available?   
  B) Are the position of location pins and stopper at correct/appropriate location?   
c) poke yoke for blank location.   
d) Is there any movement in location pins and stopper due to unavailability/loose condition of screw?   
e) Are stoppers fixed with dowel pins?   
4.sliding parts & ejectionA) Slide of Bush, Pillar, Alignment pins is good contact? (Contact 80%)   
5.Surface finisha) Is SURFACE FINISH of PUNCH / DIE OK?   
6. Clearancea) Is clearance of Die/Punch proper?   
  7. Trim steel condition punch and die conditiona) Is there any dangerous pin hole, crank on cutting edge?   
b) Is Bottom die 2nd relief proper?   
c) Is punch peneteration into die enough?   
f) Is SCRAP falling directly into chute/scrap box after triming?   
8. component Loading and Unloadinga) Is component location easier for operator ( check gauge and locators) ?   
b) Is there any possibility of mislocation ?   
  RequiredObserved 
      Checking parametersPunch size   
Die size   
Stopper size   
Locater/Strip guide size   
Ejector size   
  ABB. USED- BL=Blanking, DR= DRW, PI=piercing, BND=bending, NTC=notching, STM=stamping , FLT=flattning, BEED=beeding, CRUSH=crushing, ASSY.=assembly

10.0 Tool History Card

Tool name:Tool ID CODE:TOOL SERIAL NO.:    Tool Life MonitoringDesigned tool Life  
    Date    Sl. #    Breakdown DetailObserved Reasons of Breakdown    Maintenance done  Detail Of Pending PointsFinal Comment of Tool Room After RectificationNo, of Stroke before tool Rec. to Tool RoomRecord.Detail of Breakdown TimeTotal Maint. Cost
  Production Dept.  Tool RoomCumm. Strokes  Die life %StartCompleationTotal Time (Min)
DateTimeDateTime
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
PREPARED BY            APPROVED BY

11.0 Master List of Tools

COMPONENT NAME :
  S. NO.  TOOL  DESCRIPTION  PROJECT  MINIMUM TONNAGE  LOCATION  ID CODE  Remarks
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
Prepared BY:APPROVED BY:

12 Tool Life Monitoring Card

Location ( Dept ) :Operation :
Tool Description. :Part Name :
    Sr.#    DateStrokes Per DayDetail of Tool Movement    Sign. ( Tool Room HOD )
  Shift A  Shift BTotal Nos Of Stocks  Commu.Tool Move For Preventive Maint/For Repaird /For Production
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
 NOTE : CHANGE THE PART AFTER 99.5% OF PART LIFE CONSUMPTION..
S.NOPERISHABLE PART NAMEPART REPLACEMENT DUE (STROKES) REMARKS
     
     
    
    
Prepared By   

Approved By

13.0 Preventive Maintenance Schedule

  PREVENTIVE MAINTENANCE SCHEDULE & MONITORING SHEET FOR TOOLS, JIG & FIXTURES  Year :
TOOL NAME :TOOL ID.-Dept.:
  (MOINTORING SHEET )SCHEDULE
Week  Mth.  Qtr.  H-Yr  Year
Month123456789101112131415161718192021222324252627282930311234
Apr                                       
May                                    
Jun                                    
Jul                                     
Aug                                    
Sep                                    
Oct                                      
Nov                                    
Dec                                    
Jan                                     
Feb                                    
Mar                                    
MAJOR WORK DONE DURING PREVENTIVE MAINTENANCE
Apr 
May 
Jun 
Jul 
Aug 
Sep 
Oct 
Nov 
Dec 
Jan 
Feb 
Mar  
LEGENDWeeklyMONTHLYQuaterlyHalf YearlyYearly
  PREPARED BY:-                                                                                                                                                                                                     APPROVED  BY:-

14.0 Preventive Maintenance Checklist

Inspection Checklist For  preventive maintenance of Tools, Jig & Fixtures
    Project Name.;-    Die Fitter Name  :-Select Tool Operation
BLDRPIBNDNTCJIG & FIXTURES
  Part Name;-  Preventive Frequency ;-      
STMFLTBEEDCRUSHASSY. 
Part No ;-Date ;-      
  Class.  Inspec. ItemsSTATUS  Remarks
OKNOT OK
  1. Safetya) Are tapped shank and loading bolting safe?   
b) Is there any sharp corner ?  
        2. Tightening of bolta) Is tightening of normal kinds of  BOLT good?   
b) Is the fitted-length of DOWEL PIN over 2 times of diameter?  
c) Are DOWEL PIN,BOLT prevented from falling?  
d) Are tightening of SPRING GUIDE PIN, equaillary GUIDE PIN good?  
e) Are tightening of sleeve BOLT, safe BOLT good? Is it prevented from untightening surely ?  
3. Prevention of key turning of turninga) Is there any key to prevent turning at form-changeable part and  hard part’s PIERCE PUNCH and DIE BUSH ?   
            4. Draw die And location check  a) Are necessary/sufficient sheet gauges/location pins and stopper available?   
  b) Are the condition of location pins and stopper good without any damage?  
c) Are the position of location pins and stopper at correct/appropriate location?  
d) Is there any movement in location pins and stopper due to unavailability/loose condition of screw?  
e) Are stoppers fixed with dowel pins?  
f) Is there pin hole in metal flow areas ?  
g) Is there any wear of coating in Punch,Blank Holder,Die surface?  
        5. Sliding partsa) SLIDE of BUSH PILLAR, ALIGNMENT PINS is good contact ? (Contact 80%)   
b) Is there any play or lateral movement found in cam?  
  c) Is CAM SLIDE  in good contact ? ( More than 70%contact)  
    6.Surface finisha) Is SURFACE FINISH  of  PUNCH / DIE OK?   
b) Is metal flow Surfaces should be free from scratches  
* a),b)NOTE : POLISHED by oil stone, it must not be scratched  
  Class.  Inspec. ItemsSTATUS  Remarks
OKNOT OK
  7. CLEARANCEa) Is CLEARANCE of  DIE/PUNCH proper?   
b) CLEARANCE of TRIM, PIERCE is proper ?  
    8.Trim steel condition , punch and die conditiona) Is there any dangerous pin hole, crack on cutting edge ?   
B) Is Bottom die 2nd relief proper ?  
C) Is punch peneteration into die enough ?  
D) Scrap cutter height checking – weather hitting top die or not ?  
E) Is spring relief for all punches and trim inserts proper ?  
  9.Condition of die springa) TRIMMING and STROKE pressing spring are proper?   
b) Pad and PUNCH DIE gap ok?  
              10.Disposition of scrapa) Is Flow of piercing scrap is good ?   
  b)PI SCRAP falls one by one surely?If dropping left thing slightly,then does it fall ?  
c) Any possibility that SCRAP is connected continually?  
d) Is extension scrap chute proper ?  
e) Is cam piercing slug falling freely without stacking ?  
f) Is SCRAP falling directly into chute/scrap box after triming?  
g) IS PI SCRAPcoming out of insert? C/PI and  SCRAP should directly go into chute/scrap box?  
  
h) Is SCRAP BOX size OK and slug to be cleared properly ?  
11.Liftera) Is lifter’s function proper ? Is lifter lifting  strip proper  ?   
  12.component Loading and Unloading  a) Is component location easier for operator ( check gauge and locators) ?   
  b) Is there any possibility of mislocation ?   
ABB. USED- BL=Blanking,DR= DRW, PI=piercing,BND=bending, NTC=notching,STM=stamping ,FLT=flattning ,BEED=beeding , CRUSH=crushing , ASSY.=assembly,NA= Not Applicable

15.0 Tool Intimation Slip

BrakedownPreventive maintenanceResharpening
  Department : PRD/                   /        /              To:-      TRM/Mech./Elect.  Date :
Equipment Name :Equipment No.:
STATUS ( BEFORE MAINTENANCE )
Problem Observed/Condition of Equipment :Production StoppedYES / NO
Produce Qty ;
Breakdown Date:
Breakdown Time:
Signature of concerned dept.
STATUS ( AFTER MAINTENANCE )
Handover Date :Equipment Status        Signature of concerned dept.
Handover Time :GOODYES /  NO
Total Breakdown Time :TEMPORARY WORKINGYES /  NO
ANALYSIS
Immediate Action :OCCURANCE
RepeatYES / NO
First timeYES / NO
Production Stoppage TimeHours 
Root Cause :Minutes 
PRODUCTION LOSS
Production  Loss(shots) 
Production  Loss(Rs.) 
Counter measure after determining root cause of breakdown :Idle Time Manpower Loss (Rs.) 
TOTAL LOSS (Rs.) 
Parts Replaced ;
MAINTENANCE COSTREMARKS
Replacement Part Cost(Rs.)  
Man power Cost(Rs.) 
Subcontractor  Cost(Rs.) 
TOTAL COST (Rs.) 
    Attended By                                                                               Sign (Incharge)
    Prepared By                                                                                 Approved by

16.0 Breakdown Summary Sheet

BREAKDOWN SUMMARY SHEETReview Date
SR. No.  DateTool/Fixture Description (ID)  Dept  Project  Status of B.D  Root Cause  Analysis  Sign of T/R Incharge
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
PREPARED  BY   APPROVED  BY

17.0 WHY – WHY ANALYSIS

PROBLEM OBSERVED :Tool name :                               DATE:
CONTAINMENT ACTION :Tool no. :
RESULT :
WHYANALYSISACTION
   
   
   
   
   
   
    TEAM MEMBERS :

18.0 MATERIAL REQUISITION SLIP

From…………………                                                                                                   No.    
Date:…………………
To: store                                                                                 
Please issue the following material:                                                                                                                                                                                                                  
    S.NO.    PARTICULARS    STOCK NO.    UOMQUANTITY    REMARKS
  Reqd.To be filled by store department
IssuedAvailableTo be procured
         
         
         
         
         
         
         
         
         
         
         
         
(Shop Incharge)

Issued by: STORE INCHARGE

Leave a Reply