Example of documentation template for Process of Purchasing and Supplier Quality System Development.

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Process of Purchasing and Supplier Quality System Development in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Process of Supplier Quality System Development

2.0 Turtle Diagram of Process of Supplier Quality System Development

3.0 Purchasing Policy

  • PURPOSE:         

The purpose of this procedure is to lay down defined guidelines for Delegation of Purchase Order processing & procurement of materials by defining authority levels for P.O clearance for smooth running of production.

  • SCOPE:  

This procedure is applicable to Procurement of all types of materials required to run Production smoothly.

  • RESPONSIBILITY:

HOD Purchasing is overall responsible for this procedure

  • KEY PROCESS INDICATORS (KPI’s)
  1. Internal Customer Complaints ( Nos.)
  2. Cost Savings ( Rs.)
  3. Loss of production due to non availability of material ( Rs.)
  4. Line Stoppages due to non- availability of material ( Nos.)
  5. Physical v/s ERP Inventory variation ( %age)
  6. Material Stock Ledger for Consumables & Raw Material
  • PROCESS FLOW

Procedure of Material procurement for various categories is as follows:

  1. Raw Material & BOP’s: As per customer schedule, raw material planning is done by considering the Raw Material inventory, Defined Buffer Stock, WIP of every line and Finished Goods inventory. Accordingly, indents are raised by Purchase Department for approval as per Authority Level defined in Annexure – 1. After approval of indents, P.O. is generated by Purchase Department and sent to respective suppliers through fax, mail or by hand. Once the P.O is sent to the supplier, Purchase Department regularly follows up with the supplier to receive the material as per delivery schedule to ensure there are no line stoppages and defined buffer stock is maintained.
  • Job Work related to Production:  As per the production requirements, the material is sent to the supplier through Excise Annexure. Subsequently, the Purchase Department regularly follows up with the supplier to receive the material as per delivery schedule.  After completion of material as per the Annexure, the bill is raised by the supplier.
  • Job Work related to Tool Room / Maintenance: Requirement is generated by Tool Room & Maintenance departments for different types of Job Work such as Slot Cutting, Spline Cutting, Shaper, Temper, Wire Cut, EDM, Grinding, CNC Milling, Gear Cutting etc. After confirming the rates, Purchase department raises the indents for approval as per Annexure – 1 and after   generation of PO, material is sent to supplier, and after completion of work, the material is received back from the supplier along with proper invoice. Rates for Temper, Wire Cut and EDM are fixed as per Qty/Hrs and for Slot Cutting and other operations, the purchase department takes the rates from different suppliers as per the job.  
  • Packing Material: As per production planning, requirement of packing material is generated and after approval as per Annexure – 1, Purchase order is generated and sent to supplier. Subsequently, Purchase department follows up with the supplier to get the material on-time.
  • Consumables:  There are two sub categories in this,

Items in Minimum Level

Requirement for items in Minimum Level are generated by Purchase department on daily basis to maintain the stock for the same. After approval of indents, PO is generated and sent to supplier to get the material.                                                  

Items required by different departments as and when reqd.

Respective departments fill a “Requirement Form” against their requirements and sends to the purchase department. Purchase department generate the indents after confirming the prices i.e. whether that item has been procured in the past or else, locates the suppliers and take quotations. After comparison and negotiation, Purchase department raises the Request for Rate Approval to higher authority. Once the rates are approved, indent and PO is generated

  • Capital Goods: For all thecapitalmachinery and other costlyequipments, prices are negotiated by Directors and/or G.M Operations. Purchase Department only generates the Draft PO’s as per finalized terms and sends them to respective suppliers after necessary approvals. Subsequently, Purchase department follows up with suppliers for getting the material on-time.
  • Purchase Order Amendment: P.O Amendment is raised in some cases due to following reasons:
  1. Change in prices in Raw Material PO’s
  2. Change in P.O. quantity in some PO’s

All Purchase Order Amendments are approved as per authority levels defined in ………………and after approval sent to supplier by purchase department.

4.0 Purchase Intent

ABC Pvt. Ltd.User ID.: 
Print Date : 
Page No.: 
 
  Indent No  Item Name  Size  UM  Min. Level  Rep. Qty.  Stock  Order Qty  Req. Qty  Rate  Supplier  Required For  Remarks
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
 Approved By:-
  

5.0 Price Comparative Statement

  Sub : Approval for purchase of
required for 
indent No._
  S.No.  Item  Qty/Unit  Party’s Name  Rate  Party’s Name  Rate  Party’s Name  Rate  Party’s Name  Rate
           
           
           
           
           
           
           


General Terms:-  
1. F.O.R                                                       
2. Packing & Forwarding                                       
3. Taxes                                                                                                                                                     
4. Delivery Period                                                                                             
5. Payment Terms                                                                                                                                   
6. Discount                                       
7. Validity of Quotation                                                          
Kindly accord your approval to place our order on M/S   
General Terms:-  
1. F.O.R                                                       
2. Packing & Forwarding                                       
3. Taxes                                                                                                                                                     
4. Delivery Period                                                                                             
5. Payment Terms                                                                                                                                   
6. Discount                                       
7. Validity of Quotation                                                          
Kindly accord your approval to place our order on M/S                                        
[Prepared  by)                                                                                  [Approved By]
DOCUMENT No.PREPARED BYREVIEWED BYAPPROVED BY DATEPAGE
       HOD Materials      MS      Director        1 OF 1

6.0 Material Requisition slip

From…………………                                                                                                             No. To: store                                                                         MATERIAL REQUISITION SLIP
Please issue the following material:
  S.NO.  PARTICULARS  STOCK NO.  UOMQUANTITY  REMARKS
  Reqd.To be filled by store department
IssuedAvailableTo be procured
         
         
         
         
         
         
         
         
         
         
         
         
 (Shop Incharge)       Issued by:    

7.0 Purchase Order – Verbal

  PURCHASE ORDER – VERBAL     Date :
  S. No.  Item Description  Material Specification  Unit  Quantity  Rate/Unit  Supplier Name  Delivery  Date
        
        
        
        
        
        
        
        
        
        
        
        
        
        
  Prepared By  Approved By

8.0 List of ISO / Non ISO Certified Suppliers

  S.NO  SUPPLIER NAME  ADDRESS  ISO  NON ISO
     
     
     
     
     
     
     
     
     
     
     
     
      PREPARED BY      APPORVED BY

9.0 YEARLY PLAN FOR  SUPPLIER DEVELOPMENT

  S.NO.  SUPPLIERS NAMEMONTH(s)
AprMayJuneJulyAugSepOctNovDecJanFebMarch
1             
2             
3             
4             
5             
6             
7             
8             
9             
10             
11             
12             
13             
14             
   Approved                           Not Approved  
If not approved, attach reasons for the same


Management  Representative
  Implementation Date:
PREPARED BY:APPROVED BY:
SUPPLIER AUDIT CHECK SHEET
    Score Evaluation Criteria“2” =  Documented System & Full Compliance “1” =Documented System & Partial Compliance-(Action plan required) “0” =No Documented System-(Action plan required) “NA” = Not Applicable
Supplier :Audit Date :
Auditor/s :Auditee/s :Reason for Audit :
  Sr#  Area of Evaluation  Key Check points (Guidelines to be referred)  Observations/Notes  Score  %
AGeneral Organisation & Management Structure   
  1The Mangement Structure and resource allocation sufficient to support all necessary disciplinesOrganization Chart with key positions filledResources appear adequate to fulfill all tasks   
    2Responsibilities and authority are defined and evidence supports effective employee trainingJob descriptions for all levels of the organizationEmployee training defined & implementedSkill matrix   
    3  Management defines quality and performance objectives that promote Continuous ImprovementGoals defined in the Business PlanGoals reflect continuous improvementMinutes of Management Review MeetingsEvidence of Cost of Poor Quality analysis   
      4  Workplace Health, Safety, Cleanliness, and Environmental Protection practices are in place and are consistently adhered toPlant is clean, orderly and well lit5S disciplines are in placeAppropriate machine guarding and safeties are evidentNo signs of visible pollution or spills   
 Total Score General Organisation & Management Structure  
BAdvanced Product Quality Planning   
  1System in place to define approved packaging for storage and preservation of productApproved packaging plans Warehouse is clean & orderlyPackaging ensures protection of product   
  2Product Realization Process provides clear linkages between Product and Process Design and Control MethodsPresence of PFD, PFMEA & Control Plans – Linkage between PFMEA, Control Plan and inspection/control methods   
    3  Organization is equipped to support necessary verification, validation and monitoring of characteristicsPresence of critical inspection equipment (i.e. CMM, laboratory equipment, etc.)Availability of 3rd party certified test facilitiesInspection/test records to validate testingResponses to out of specification conditions   
4PPAP Sign OffSPC Studies,Process and product qualification.   
  Sr#  Area of Evaluation  Key Check points (Guidelines to be referred)  Observations/Notes  Score  %
 Total Score  – Advanced Product Quality Planning  
CProduct Realization, Measurement, Analysis & Improvement
    1  The continuous conformance of purchased product is ensuredRequalification documents Incoming inspection recordsCorrective actions to non-conformancesThird-Party validation of material certificates   
      2    An adequate and effective Supplier Management Process is in place– Supplier performance records Records of supplier response to non- conformancesSupplier Development of poor suppliersProcess to ensure use of customer approved suppliers, when appropriate   
    3  Process & System are regularly audited to ensure compliance and continuous improvement  Internal Audit recordsAudit schedule based on process requirements   
  4  Adequate method for Operation Control-Setting Approval ‘-Inprocess Inspection ‘-Final Inspection ‘-PDI Inspection   
  5  Adequate method for Gauge Control-Gauge Identification ‘-Master List of Gauges & Instruments ‘-Calibration Certificates   
  6Work Instructions are implemented for all employees affecting product quality, including repair and re-work operationsEvidence of Work Instructions posted on lineRe-Work Instructions are aveilable   
      7      Production planning and control-Planning of production and interlink with customer requirements and sub suppliers schedules. Capacity V/s Actual UtilizationProduction Plan V/s AchievedDelivery performance is monitored   
    8  There is an effective Predictive & Preventive equipment maintenance system‘-Preventive maintenance schedule & records, including downtime analysis Master List of MachinesVisual condition of equipmentNo leaks, excessive grease, etc.   
Supplier :Audit Date :
Auditor/s :Auditee/s :Reason for Audit :
  Sr#  Area of Evaluation  Key Check points (Guidelines to be referred)  Observations/Notes  Score  %
 Total Score  –  Product Realization, Measurement, Analysis & Improvement  
DMaterial, Facilities, Logistics & Tooling
      1Effective material identification and control is in place. Lack of visible bottlenecks or material constraints or tight and strict control of those. Material identified at all stages of operationSuspect material identified and segragated in a secure and segregated areaProper storage of raw & finished materialsEvidence of FIFOSystem to monitor inventory levels and to drive stock size reduction   
      2    Material and lot traceability is implementedLot traceability records Receiving records with lot numbers recordedShipping records indicating lot numbersIn-process material with lot numbersShipped product can be traced back to received materialBar code labelling   
    3    System ensures preservation of Customer ToolingProper tool storage facilitiesTool maintenance records -Preventive maintenance schedule & records, including downtime analysis Master List of Tools   
  4  Plant capacity planning is up to date & Emergency strategies are available-Current capacity studies and resource planning Evidence of contingency plansPotential bottlenecks identificationsafety stock identification   
 Total Score  – Material, Facilities, Logistics & Tooling  
 Over all Score (A+B+C+D)0 
Auditor Signature: Supplier Signature: 

10.0 Supplier CAPA

Supplier :Audit Date :
  Auditor :  Auditee :  Reply required by :
Description of Non-compliance
Root Cause
Corrective and Preventive action
Implementation date
         Signature
Date

Example of documentation template for Process of Supplier Selection, Evaluation and Monitoring.

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Process of Supplier Selection, Evaluation and Monitoring in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Process of Supplier Selection, Evaluation and Monitoring.

2.0 Turtle Diagram of Process of Supplier Selection, Evaluation and Monitoring.

3.0 Supplier Performance Rating

    MONTH:
      S.No      Supplier Name      Total  Qty Supplied    Total Qty Received (QR)    Total Qty Accepted (QA)      Quality Rating QA/QRx100  Delivery Rating DR=Quantity Received in a specific time/Quantity Scheduled    Line Disruption due supplier fault (OR1)  Customer Notification/ Disruption /Field Return (OR2)    Premium Freight Rating (OR3)    Other Rating OR= (OR1+OR2+OR3)x20    Quality System Audit Rating (QS )      Supplier Performance
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
Prepared By:   Supplier Performance in % = (0.50QR+ 0.20 DR + 0.15 OR+ 0.15 QS )
 

4.0 Supplier Assessment Form

5.0 Supplier Registration form

Date:
Company Name:Address:Supplier No:
Phone:1. Contact Person:Cell #
Fax:2. Contact Person:Cell #
Email:3. Contact Person:Cell #
Note: Failure to send the enclosures (documents of proof) will be treated as non-compliance in that area. Type:                                          Manufacturing Unit                           Trading Ownership:                               Proprietorship                                        Private Limted                      Limited For Manufacturing Units: Competency Matrix of the Workforce:
     Total No of Employees    SSC (10th)    HSC (12th)    Diploma    Graduate    Post Graduate  Years of Experience
Education Base
SectionUp To 55-1010-1515-2020-25> 25
             
             
             
             
             
Total            
Manufacturing Capacity
Total Production Capacity:           Shifts/Day:               Day / Night / Both
Manufacturing Facilities Available:
(Attach Separate Sheet, if reqd. )

Financial Strength
Turnover of the Company (In Lacs):                                                                                                                                                
Are there any Expansion Plans:                                                                                                                                                               
(Attach Separate Sheet, if reqd. )

Quality System

Do you have a Third Party Certified Quality Management System?                Yes                          No
If yes, which certification?               ISO 9001:2015                    IATF16949 : 2016                 ISO14001:2015 (Please enclose a copy of your certificate)?
If no, do you have plans for any of the Certifications ?                 Yes                          No
(If yes, please enclose activity time-plan for Certification)

Customer Dependency (Indicate following data for top 5 customers)
Customer NameLocation% Turnover# of years associated with them
    
    
    
    
    
 
   SUPPLIER REGISTRATION FORM  Page 2 of 2
Environment & Safety
The unit is registered under Factory Act?                  Yes                     No                 

If yes, Reg. #                                                                                                         

List the applicable Legal Requirement/Standard/Code of Practices:                                                   





Number of Prosecutions, if any:                                                                                                No. of Reportable Accidents / Fatalities: 
Major                                                          Minor                                    

Are you aware of all existing and impending legislation influencing your business with us.
(Please Attach the list).

Under which category, does your Products/Processing Activities fall under the preview of Pollution Control Boards? Red         Green

Please indicate your Source of Energy: Electricity/ Captive Generation /    Both

Inspection & Testing Facilities
Give details of all Inspection & Testing Facilities available: ( Equipment name, year of mfg, LC, range, supplier, cal frequency, calibrated from etc )
Equipment NameLeast CountRangeSupplierCalibration FrequencyCalibration From (Internal / External)
      
      
      
      
      
      
      
      
Company Rubber Stamp (Stamp below):                                 
Authorized Signatory:                                                                                                                          Designation:                                                                      
Date & Place:                                                                   

6.0 List of Approved Supplier

  S. No.  NameApproved for Part No. / Description  Address  Contact PersonPhone No.
Mobile No.Landline No.
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
  Prepared By  Approved By

7.0 WORK INSTRUCTION FOR CALCULATING SUPPLIER RATING

1.0 PURPOSE:

To generate instructions for calculating supplier rating to improve the performance & to ensure Customer Satisfaction.

 2.0 SCOPE:

Applicable to all raw material / job work suppliers.                                                             

   QUALITY RATING (QR)-

  •              QR=QA/QRX100
  •              QA=Quantity Accepted
  •              QR=Quantity Received
  •              Qty accepted under deviation/ After Rework/ Rejected at Incoming
  •              Stage shall be treated as Rejection.

DELIVERY RATING (DR)-

  •             DR=QT/QSX100
  •             QT=Quantity Received In Specific Time
  •             QS=Quantity Scheduled

OTHER ISSUE RATING (OR)-

  •            OR= (OR1+OR2+OR3+QR4) X20
  •            OR1=Internal Line Disruption due To Supplier Fault

                                                                                 MARKS

  •            None during Period                                    2
  •            Once during Period                                    1
  •            More than Once During Period                  0

  OR2=Customer disruption/Field/Customer return due to supplier Fault

                                                                                 MARKS

  •            None during Period                                   1
  •            Once or More during Period                      0

  OR3 =Premium Fright Rating

                                                                                 MARKS

  •            None during Period                                  1
  •            Once During Period                                  0

OR4 = Stock updation on weekly Basis by supplier end

                                                                                 MARKS

  •           Stock update on weekly basis                     1
  •           Stock not update on weekly basis              0

QUALITY SYSTEM RATING (QS)-

The score achieved by the supplier during the Quality System audit would get the 0.15 weightage.

 SUPPLIER PERFORMANCE IN %= (0.50QR+0.20DR+0.15OR+0.15QS)

CATEGORIZATION OF SUPPLIER

  1.         SPR- ABOVE 90 – CATEGORY ‘’OUTSTANDING’’
  2.         SPR-> 80 < 90 – CATEGORY ‘’EXCELLENT’’
  3.         SPR-> 70 < 80 – CATEGORY ‘’GOOD’’
  4.         SPR-> 60 < 70 – CATEGORY ‘’SATISFACTORY’’
  5.         SPR- < 60        – CATEGORY ‘’UNSATISFACTORY’’
  • If Supplier Is categorized as ‘’Satisfactory’’ Inform to supplier to Improve and closely Monitor the Vendor Performance.
  • If Supplier Is Categorised as ‘’Unsatisfactory’’ Send Two Month Notice cum-Warning Letter
  • to supplier and monitor the supplies.
  • If after two months No Improvement are evident, Disqualify the same and delete from ‘’List of Approved Supplier’’

.

Example of documentation template for Production process in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Production Process in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Production process

2.0 Turtle Diagram of Production process

3.0 COMMUNICATION MATRIX

  Company Name
DEPT;AS ON DATE:
  S.NO.  DESCRIPTION OF COMMUNIQUE  MODE OF COMMUNICATION  RESPONSIBILITY  FREQUENCY  COMMUNICATION RECD. FROM  COMMUNICATED TO
       
       
       
       
       
       
       
       
       
       

4.0 Cost of Poor Quality

Details of Costs for calculating Cost of Poor Quality
Cost of Raw MaterialsCost of Press Strokes / Machining / WeldingCost of BOP Parts
Sl. #  DescriptionPrice  DescriptionCost per Stroke  Description  Price
1      
2      
3      
4      
5      
6      
7      
8      
9      
10      
11      
12      
13      
14      
15      
16      
17      
  18      
Note: The above indicated costs are for Cost of Poor Quality Calculation purposes only. These are not actual costs.
Approved By:

DAILY DATA COLLECTION SHEET FOR COST OF POOR QULAITY         

DATE :-
Rejection CostRework Cost
      S. NO.      PART NAME    Failure Process NAME    Raw Material Cost Rs./Nos.      Process Cost (Rs.)      Total Cost (Rs.)      Reject Qty   ( No.)  Rejection  Rework    Rework Qty   ( No.)  Rework      Remarks
  Cost Of Poor Quality (Rs)  Process Cost (Rs)  Cost Of Poor Quality (Rs)
            
            
            
            
            
            
            
            

5.0 Engineering Change Request

    Part Name :    Date:
  Part Number/Drg Number :  Deptt: Name ;-
  Request to Dept.Name 
  S.No.  Existing Dimensions/Part  Changes Required  Reasons of changes  Remark If any
     
     
     
     
     
     
     
     
     
     
  REQUESTED BY    APPROVED BY

6.0 Daily Production Report

      Date      Shift (A/B)      Machine No      Operator      Part No      OperationProductionTime Losses      Remarks
    Plan Qty    Ok Qty    Rework    RejectionManMachineMaterialMethodMeasurement
  Short  Absent  leave  B/Down  Setting  Internal  External  Total Trails  Fixture B/D  Samples  Decision
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
                      
Prepared By :
Approved By:

7.0 Disposal Note cum Rework Data

Deptt.:-    Period :-
S.No.Part NameProdRej Pcs.PPM (Rej.)Nature of Rej.Root causeAction PlanRework Pcs.PPM (Rew.)Nature of Rework.Root causeAction PlanRemarks
              
              
              
              
              
              
              
              
              
              
              
              
              
              
              
              
Prepared By       Verify By    Approved by (DGM)       Approved by ( Director )

8.0 Competence Matrix

DEPTT:
DOC.REF.DEPTT/COMPETENCE MATRIXDATE:
REVISION:00:Page :   1   of   1
Sr. No.Level of PersonnelEducational QualificationExperience RequiredSkill Required (If any)Remarks
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      

 9.0 Identification and Monitoring of Work Environment

PROCESS NAME :

NAME OF DEPT :                                                                               

 HEAD OF DEPT:

AS ON DATE: 
REVISION NO.:  

Monitoring Details
NameDateSign
   
   
   
   
  S. No.Environmental ParametersControlling Means (If any)Resp. Qty.Goods ConditionsRemarks
    Reqd.Avail.OKNot OK 
A.TEMPERATURE       
         
         
B.LIGHTING       
         
         
C.NOISE       
         
D.HUMIDITY       
         
E.PERSONAL PROTECTIVE EQUIPMENTS         
1.MASK       
2.HELMATE       
3.APREN       
4.GLOVES       
5.GOGGLE       
6.SHOES       
7.EAR PLUG       
8.SHIELD       
         
F.HOUSE KEEPING       
         

NOTE: IN CASE, ANY OF WORK ENVIRONMENT PARAMETER IS NOT SUITABLE TO MEET PERFORMNACE INDICATORS, MAKE ACTION PLANS WITH TARGET DATE AND RESPONSIBILITY

(HOD)                                                                                                    (UNIT HEAD)

10.0 Identification and Motoring of Work Environment

PROCESS NAME :

NAME OF DEPT :                                                                                 DEPT. HEAD:

AS ON DATE: 
REVISION NO.:  


Monitoring Details
NameDateSign
   
   
   
   
  S. No.Environmental ParametersControlling Means (If any)Resp. Qty.Goods ConditionsRemarks
    Reqd.Avail.OKNot OK 
A.TEMPERATURE       
         
         
B.LIGHTING       
         
         
C.NOISE       
         
D.HUMIDITY       
         
E.PERSONAL PROTECTIVE EQUIPMENTS         
1.MASK       
2.HELMATE       
3.APREN       
4.GLOVES       
5.GOGGLE       
6.SHOES       
7.EAR PLUG       
8.SHIELD       
         
F.HOUSE KEEPING       
         

NOTE: IN CASE, ANY OF WORK ENVIRONMENT PARAMETER IS NOT SUITABLE TO MEET PERFORMNACE INDICATORS, MAKE ACTION PLANS WITH TARGET DATE AND RESPONSIBILITY

(HOD)                                                                                                    (UNIT HEAD)

11.0 CONTINGENCY PLAN

Department      :

As On Date:    /     /   

  S.No.    Stage    Type of Contingency    Action Required    Responsibility  
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

Note :   All contingencies like Utility Failures; Heavy Absenteeism, Key Machine Failures; Field Returns (Warranties); non-availability of raw materials / tools / consumables be considered.

(Signature)

12 Responsibility Matrix

DEPTT:              
DOC.REF.DEPTT/RESPONSIBILITY MATRIX  DATE:
`REVISION:00:Page :   1   of   1
S.NO.Name of PersonDesignationResponsibility
    
    
    
    
    
    
    
    
    
    
    
    

13.0 WI FOR REJECTED MATERIAL DISPOSAL

  1. Shop HOD to prepare weekly rejection & rework material disposal note and handover to quality HOD.
  2. Quality HOD will examine all shop rejection & get it signed from DGM manufacturing and Director.
  3. Same signed disposal note to be handed over to dedicated person at scrap yard. Ownership of quantity verification is with HOD quality.
  4. The dedicated person will physically check the rejected quantity by counting as mentioned in disposal note and put in defined scrap area under lock and Key.
  5. If any mismatch observed in quantity, informed to DGM manufacturing.
  6. Only locked area rejection to be scrapped as parts/Assys. This is responsibility of security supervisor

Example of documentation template for Plant Maintenance process in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Plant Maintenance Process in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Plant maintenance process

2.0 Turtle diagram of Plant maintenance process

3.0 Master list of Machines

  S. No  Machine NameEquipment Code  Dept/AreaLine no.  Range  Make
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
Prepared By :   Approved By :

4.0   List of Critical Spares

  S.NO.  Name of parts  Min.stock level  Max.Stock Level  Remarks
A.Mechanical   
     
     
     
     
B.Hydraulic   
     
     
     
     
CElectrical   
     
     
     
     
DPneumatic   
     
     
     
     
     
     
  PREPARED BY                                                                                                                     Approved By

5.0 Preventive Maintenance Schedule

  S. No  Machine NameEquipment Code  Dept/AreaAMC REQ  Apr  May  Jun  Jul  Aug  Sep  Oct  Nov  Dec  Jan  Feb  Mar
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
Prepared By :    Approved By :

6.0 Predictive Maintenance Schedule

  S. No  Machine NameEquipment Code  Dept/Area  Apr  May  Jun  Jul  Aug  Sep  Oct  Nov  Dec  Jan  Feb  Mar
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
Prepared By :   Approved By :

7.0 Why-Why Analysis

Machine Code:Date:Report No :
  PROBLEM OBSERVED :
  CONTAINMENT ACTION :
  RESULT :
WHYANSWERACTIONANALYSIS
    
    
    
    
    
    
    
    TEAM MEMBERS :  
 
 
 
  Root Cause:
  Prepared by:    Approved by:
 

8.0 Monthly Breakdown Summary

  Month :
  Sr. No.Area WiseMachine B/D Frequency (No.s)Machine B/D Time (Hrs.)MTTR (Hrs.)MTBF (Hrs.)
MECHELECTELECT & MECHMECHELECTELECT & MECHMECHELECTELECT & MECHM/C AVL. Hrs.MECHELECTELECT & MECH
1             
2             
3             
4             
5             
6             
7             
8             
9             
10             
11             
12             
13             
14             
15             
16             
17             
PLANT LEVELB/D FREQUENCY MECHANICAL (No.s)             
B/D FREQUENCY ELECTRICAL (No.s) 
B/D FREQUENCY ELECT & MECH (No.s) 
B/D TIME MECHANICAL (Hrs.) 
B/D TIME ELECTRICAL (Hrs.) 
B/D TIME ELECT & MECH (Hrs.) 
MTTR MECHANICAL (Hrs.) 
MTTR ELECTRICAL (Hrs.) 
MTTR MECHANICAL & ELECTRICAL (Hrs.) 
MACHINE AVAILABLE HOURS (Hrs.) 
MTBF MECHANICAL (Hrs.) 
MTBF ELECTRICAL (Hrs.) 
MTBF MECHANICAL & ELECTRICAL (Hrs.) 
  PREPARED BY:           
APPROVED BY :

9.0 Diesel Consumption Record

  Diesel Consumption for the Month:  
Sr. No.  DateStart TimeClose TimeTotal HoursCause of runingFuel opening LitersFuel close LitersDiesel Consum.Consum. Per HoursDiesle Refling Qty LtrsDiesle Purchase QTY. LtrsStand By Stock LtrsTotal cost Per DayCost Per Hour
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
Prepared ByApproved by

10: Overhauling schedule

      OVERHAULING SCHEDULE
S. NoMachine NameEquipment CodeDept/AreakwAprMayJunJulAugSepOctNovDecJanFebMar
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
                 
  Prepared By :  Approved By :

Example of documentation template for Layout Inspection in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for layout Inspection in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach for layout Inspection Process

2.0 Turtle of for Layout Inspection

3.0 Layout Inspection Plan

LAYOUT INSPECTION PLANYear:-
  S.No.  Section  Component Name  Customer Name/Code  Planned vs. ActualMonths  Remarks
123456789101112
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
      Planned             
  Actual             
Prepared By:-                                                                                                                                                                                   Aproved By:-

4.0 Layout Inspection Report

  LAYOUT INSPECTION REPORTS.NO.   DATE:
PART NAME :                                                                                              SAMPLE QUANTITY:
PART NO:                                                                                                    LOT SIZE:
SUPPLIER NAME :                                                                                       DATE OF INSPECTION:
    S.NO    SPECIFIED DIM.    TOL  INSTRUMENT USED  OBSERVED DIMENSIONS    REMARKS
12345
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
          
  INSPECTED BY:                                                                                                             APPROVED BY:
 

Example of documentation template for Lab Management Process in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Lab Management in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach for Lab Management Process

2.0 Turtle Diagram for Lab Management Process

 3.0 Laboratory Scope

As On Date:                                                     Laboratory : Physical / Chemical / Standard Room

S No.Category of Tests / Calibration Done In Lab. / Std RoomInstrument UsedReference / Limit SamplesMethod of TestEnvironment ConditionCompetency of PersonnelCapability of Instrument
 Temp.HumidityQualificationExperience.In House LabExternal Lab
           
           
           
           
           
           
           
           
           

                                                                                                Approved By:

4.0 Laboratory Personal Qualification Data

SR.NO  NAMEDATE OF JOININGEDUCATIONAL QUALIFICATIONLAB-EXPEREANCE BEFOR JOININGTRAINING RECEIVEDNAME OF TESTS FOR WHICH QUALIFIEDAPPROVED BY & DATE
                                            

5.0 List of Qualified External Lab.

S.No Name of the LaboratoryAccredited ByQualified CriteriaAddressContact PersonPhone No.
       
       
       
       
       
       
       
       
       
       

Example of documentation template for Calibration of Equipment Process in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Calibration of Equipment in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach for calibration of Equipment process

Turtle Diagram for calibration of Equipment process

3.0 Annual calibration Plan

YEAR :
Sr. No.Instruments NameFrequencyJanFeb.MarAprMayJuneJulyAugSepOctNovDecRemarks
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
                
  
  
PREPARED BY          Approved By

4.0 In-House Calibration Certificate

  CERT. NO. ——————-   DATE              ——————-
Equipment I.D.:Made/Make:
Manufacturer:Model No :
Type of Machine:Serial No.:
Drive:Physical Condition:
Referance Procedure:Revision Status:
  CALIBRATION DATA
  Regulator Scale Marking   Measured marking  Variation     Remarks
    
    
    
    
    
    
    
  MASTER EQUIPMENT TRACEBILITY
Equipment Type 
Equipment I.D. No. 
Calibration By. 
Calibration Certificate No. 
 
Calibrated By:Certified by:
Name:Name:
Signature:Signature:
DateDate:
Issue.No./Date: xx/xx.xx.xxxx
Rev.No/Rev.Date:xx/xx.xx.xxxx

Example of documentation template for Information Technology Process in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Information Technology Process in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach for Information Technology Process

2.0 Turtle diagram of for Information Technology Process

1. Master list of IT assets

  MASTER LIST
Sr. No.NameUser_NameDepartmentI.P. AddressLocationConfigurationTypePurchase date
         
         
         
         
         
         
         
         
         
         
         
         
         
         
         
         
         
Prepared By:   Approved By:

2. Breakdown slip

Department :Date :
Equipment Name :Equipment No.:
STATUS BEFORE MAINTENANCE
Problem Observed/Condition of Equipment :  Breakdown Date:
  Breakdown Time:
    Signature of concerned dept.
STATUS AFTER MAINTENANCE
Handover Date :Equipment Status            Signature of concerned dept.
Handover Time :  GOOD  YES /  NO
  Total Breakdown Time :  TEMPORARY WORKING  YES /  NO
ANALYSIS
Immediate Action :  OCCURANCE
Repeat  YES / NO
First time  YES / NO
Root Cause :
Counter measure after determining root cause of breakdown :
MAINTENANCE COSTREMARKS
Replacement Part Cost(Rs.)  
Man power Cost(Rs.) 
Subcontractor  Cost(Rs.) 
TOTAL COST (Rs.) 
      Attended By                                                                               Sign (Incharge)
      Prepared By                                                                                                Approved by

3.0 IT Equipment History Card

EQUIPMENT NAME:Equipment No Equipment Make
SR. No.Problem Detail Location Breakdown Time Spare part Consummation Action Taken REMARKS
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       

4.0

PREVENTIVE MAINTENANCE SCHEDULE
Sr.No.Equipment nameEquipment IDPlan for Year xxxx-xx
AprMayJuneJulAugSepOctNovDecJanFebMar
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
    Prepared By:         Approved By:

4.0 PREVENTIVE MAINTENANCE SCHEDULE

Sr.No.Equipment nameEquipment IDPlan for Year xxxx-xx
AprMayJuneJulAugSepOctNovDecJanFebMar
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
    Prepared By:         Approved By:

5.0 List of critical spares

  S.NO.  Name of parts  Min.stock level  Max.Stock Level  Remarks
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
  PREPARED BY   Approved By

6.0 Preventive Maintenance checklist

Computer Name:                        Date:   Monthly (By I.T. Department)
Sr.No.Work To be DoneYesNo
1Scan through antivirus and update the latest  antivirus.  
2Clean the computer, telephone and other accessories.  
3Delete all unnecessary files from your computer.  
4Check the all cables connected with the computer.  
5Check the function of the computer related to network, outlook or any another software used by user.  
6Clear all temp file to cleaner software.  
7Run scandisk .  
8Clean and check every hardware as well as software.  
9Also verify the backup with master schedule backup.  
10Make restore point of the computer.  
11Make backup manually . Also take back up on CD or DVD.  
12Clean with blower  
  Prepared By:                                                                                                     Approved By:

Example of documentation template for Process to Manage the use of alternate control methods in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Process to Manage the use of alternate control methods in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Process to Manage the use of alternate control methods

2.0 Turtle Diagram of Process to Manage the use of alternate control methods

3.0 List of Alternate Control Method

S.No.DEPT NAMEPROCESS NAMEEXISTING METHODALTERNATE METHODREMARKS
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
PREPARED BY   APPROVED BY

Example of documentation template for Process of Facility Planning & Deployment in IATF

The following document templates (tool kits) are provided totally complimentary, free of charge to use as a starting point for Process of Facility Planning & Deployment in IATF. As each business is different, additional documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. ​​If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new documents – Contact Us. We’re always looking for interesting new clients and projects.

1.0 Process Approach of Process of Facility Planning & Deployment

2.0 Turtle diagram of Process of Facility Planning & Deployment

3.0 Communication Matrix

Department :    ____________                                  As on Date : ___/___/___  
S.No.Communication TitleFormat/ ModeFrequency.Department / Function
CustomerMarketingProductionPPC & DispatchEngg.Tool RoomHRMaterialsQualityMRLabPlant Maintenance
              
                
                
                
                
                
                
                
              
                
                
                
                
                
                
 
Include all types of applicable Communications emerging from the department  and communicated to other departments including Management Representative and Customer e.g. Objectives & Quality Policy,
Progress on Continual Improvement Projects, Non-conformance, Conformance Reports, Audit Results for effectiveness of Management Systems, Corrective and Preventive Actions, Supplier Performance, Customer & Statutory / Regulatory Requirements.
Mode of communication may be either through Dept meetings, Display at Notice Boards, Circulation of Hard Copy formats, LAN, Verbal  or through Company Bulletins / News Letters.
Signature
(Department Head)

4.0 PROJECT IDENTIFICATION FOR IMPROVEMENTS & APPROVAL

5.0 Action Plan for Implementing Improvement Project

Name of Project :

Expected Improvements from Project if any  :

Project Team Members (Including Team Leader)  :

Target Date for Completion of Project    :

Action Plan:

S. No.ActivityResponsibilityTargetReviewed By
   IIIIIIIVV 
              
          
              
          
              
          
              
          
              
          
              
          
              
          
              
          
              
          
              
          
              
          

Prepared By:                                                                                         Approved By:

6.0 Resource Planning

Name of Department:                                                                                

Monitoring Details
NameDateSign
   
   
   
   
S. No.Required InfrastructureRequiredAvailableAdditional RequiredAPPLICABLE PROCESSES
Communication         
A.INFRASTRUCTURE RELATED TO BUILDING, WORK SPACE, HARDWARE, SOFTWARE, TRANSPORTATION, UTILITY, COMMUNICATION MEANS, CHECKING AIDS
               
               
               
               
               
               
               
               
               
               
               
               
               
B.WORK ENVIRONMENT/ SUPPORT FACILITIES RELATED TO TEMPERATURE, HUMIDTY, HOUSE KEEPING, LIGHTING, PERSONNEL PROTECTIVE EQUIPMENT (PPE)
               
               
               
               
               
               
               

NOTE:      IN CASE, INFRA-STRUCTURE IS NOT OK TO MEET OBJECTIVES / PERFORMANCE INDICATORS OR NEW TO BE INSTALLED, MAKE ACTION PLANS WITH TARGET DATE AND RESPONSIBILITY