To instruct & ensure the care to be taken to provide good housekeeping and Air Quality Monitoring at the entire premises of XXX.
2. SCOPE:
These work instructions are applicable for carrying out housekeeping and Air Quality Monitoring activities at XXX
3. RESPONSIBILITY:
HOD Amin is responsible for ensuring that the housekeeping contractor will practice this work instruction.
4. INSTRUCTIONS :
HOD Admin ensures:
Instruct contractor to employ the sufficient number of persons for covering all the areas viz. shop floor, offices, utilities, toilets, & garden.
Availability of sufficient no. of mops, cleaning soap, other toiletries with the contractor.
All areas are free from cobwebs & dust.
4.1SAFETY INSTRUCTIONS:
HOD Admin ensures the following:
All contractual personnel wears their safety shoes, other PPEs, and proper uniform while working.
While using a ladder or cleaning the places above six feet/ sufficient care is to be taken i.e. two persons stand below, holding the ladder when one person is working at height on the ladder. Person climbing high is supposed to use safety belt.
Stacking of material in the scrap yard up to the safety mark or wall height.
Usage of hand gloves by contractual personnel while handling burr or any other hazardous wastes.
Use of disinfectants like phenyl in the office area for proper hygiene.
4.2 WORK INSTRUCTIONS:
Carry out housekeeping of various areas as per the frequencies mentioned in the chart below
After cleaning the floor with soap water, collect the scrubbed water with vacuum cleaner & let out this water to drain line which in turn goes to outside channel.
After mopping & sweeping up the area, all contractors should follow the work instruction for Segregation & disposal of solid waste.
To identify and take appropriate control measures to handle Accident and Emergency Situations.
2. SCOPE:
This Work Instruction is applicable for any sort of accident & emergency situation that emerges in the premises of XXX.
3. RESPONSIBILITY:
HOD Safety and concerned personnel are responsible for the implementation of the work instruction.
4. INSTRUCTIONS:
Incidents in the Following area are identified as the most potential emergency situations that can occur in our company.
Fire in
FO Storage tank
Welding stations
Surrounding Premises
DG Set
Transformer etc.
Oil Storage area
Laboratory
Plant Area including DG set / FO, Hydraulic oil Storage / Oil Storage
The person, who notices the fire will shout ‘Fire’, ‘Fire’ and ask for help and immediately informs the concerned person (*). The concerned person will start whistling to inform:
Trained fire-fighters to attend to the affected area
Evacuating the other personnel to the identified safe place.
The concerned HOD will ensure that nobody is trapped in the emergency area. The attempts will be made to evacuate the trapped person if any, using the safe way out. The HOD- Concerned department will take charge of the overall situation.
All the remaining employees will gather at a safe place outside.
the Concerned HOD or designate informs MD about the situation. the Concerned HOD also keeps him posted from time to time about the situation.
If the situation is out of control the HOD, where the event has happened will contact the local fire brigade.
The injured person if any, will be given first aid and moved to the nearest identified hospital.
The incident is recorded in the Register for Accidents and Emergency Situations by the Concerned HOD and analyzes it further.
ACCIDENTAL SITUATIONS OTHER THAN FIRE:
The person who is nearest to the injured person will call for help and arrange for first aid.
The injured person will be taken to the nearest first aid box in case it is possible or first aid is provided on the spot by a trained person available.
the Concerned HOD and MD are informed simultaneously by HOD HRD or designate.
Considering the severity of the injury, the injured person is shifted to the nearest hospital for further treatment. HOD HRD and/or concerned department in charge makes the required arrangement.
The incident is recorded in the Register for Accidents and Emergency situations by HOD HRD for further analysis. HOD HRD records the accident as required.
In case of an earthquake, all employees will immediately run out of the building in a safe area.
OPERATIONAL CONTROL PLAN:
Sr. No
The parameter to be Monitored
Specification
Frequency of Monitoring
Method of monitoring
Resp.
Record
1
Mock Drill.
No laps during Mock Drill
After every Mock Drill.Accident & emergency record
To provide the guideline for operation & maintenance of the ETP and STP.
2.SCOPE:
This WI is applicable for ETP and STP
Daily treatment process
For disposal of sludge.
3.RESPONSIBILITY:
Safety Officer is responsible for the implementation of this WI.
4. INSTRUCTIONS:
ENVIRONMENT, HEALTH, AND SAFETY INSTRUCTIONS WHILE OPERATING ETP/STP:
Use the chemicals properly.
Assure the exact pH of effluent.
Assure proper working of Aerator, if the aerator is not working properly the abnormality of so should be informed to the maintenance department.
Assure that there is no spillover from the Tanks as well as from the outlet.
Assure that outlet of ETP and STP should be disposing of properly into the garden.
Assure that the filter of STP is replaced periodically.
Assure that the periodic cleaning of tanks is taken place.
DATA COLLECTION METHODOLOGY:
The whole Effluent and sewage generation is the primer activity the area is divided into following groups for ease of operation and maintenance
Total water consumption
Total sewage generation
Total sewage treated
Total effluent generation
Total effluent treated
Handling and disposal of sludge
Disposal of water coming from ETP and STP Outlet.
Safety officer keeps a record of these readings on a daily basis.
REVIEW AND ANALYSIS
Daily readings are reviewed & if found abnormal, then immediate corrective actions are taken by Safety Officer. After reviewing collected data, Safety Officer analyses Sewage and effluent generation on a monthly basis. Abnormal trends are further analyzed for corrective actions & control measures suitable to the area.
CONTROL METHODOLOGY:
ETP and STP functioning is controlled by the following methods –
Awareness training amongst the operators.
By brainstorming in the user groups for water consumption
By promoting different ideas from employees regarding water conservation
Display boards like “Save water”, “Don’t waste water”. ,” Water is life! Save water, save a life!” “Save water secure the future! “Conserve water, our life’s on the brink!” “Save water it will save you later!” “Wastewater today – Live in desert tomorrow”.
Daily Monitoring of effluent and sewage generation by all Plants.
MONITORING AND COMPARISON:
New water consumption levels are assessed by the Safety Officer and the results are compared with targets. The successful solutions are continued whereas for unsatisfactory solutions are reviewed for improvements. The samples of ETP and STP water is also been tested by the external agency once in a month for checking the efficient and proper working of the plants.
5. OPERATIONAL CONTROL:
Sr.No
The parameter to be Monitored
Spec.
Freq.Of monitoring
Method of monitoring
Resp.
Record
1
Review of Consumption at Resource.
Consent conditions for daily water consumption and sewage and effluent generation
Monthly
Daily Consumption Record. Daily sewage generation record Daily effluent generation record
Safety Officer.
Review Record.
2
Review for efficient working of ETP and STP
Consent conditions for ETP and STP Water discharge specifications
To instruct & to ensure the care to be taken related to Environment, OHSMS by canteen contractor and other agencies.
2. SCOPE:
This work instruction is applicable to canteen contractor and other agency who looks after all canteen activities like getting hygienic good food from outside, serving, cleaning of utensils & canteen area for the employees of the company, in all shifts.
3. RESPONSIBILITY:
HOD Admin is responsible for ensuring that the canteen contractor & other agency will follow this work instruction.
4. INSTRUCTIONS:
A) BASIC REQUIREMENTS:
Contractor and agent ensures the following
Employees are medically examined.
Maintain strict timing.
Maintain neat and clean, pantry/store, dining hall.
Canteen waste like waste food, tea powder, etc. to be transported to piggery on a daily basis.
All utensils are cleaned thoroughly.
The plastic used should be disposed of properly or avoid the use of plastic.
B)SAFETY INSTRUCTIONS:
Provide Hygienic Food / Coffee / Tea.
Provide good water for drinking – water purifier should be always in operating condition. The water cooler is to be cleaned periodically at a defined frequency.
Ensure periodical Medical check-up for canteen employees.
Wash/clean properly, all grains / rice / vegetables before preparation of food / snacks etc.
HOD Admin conducts the monthly audit at the cooking facility for hygiene & cleanliness.
Keep inside and outside area of the canteen neat and clean, should be free from cobwebs, etc.
Spray pesticides regularly.
C)REQUIRED FACILITY:
Ensure the following facilities are available
Water, Electricity
Sanitary assistance
Pesticides spray/control
D)OPERATING INSTRUCTION:
To provide always hygienic food, timely supply, and good housekeeping, ensure the following at contractor’s cooking facility:
Procure always branded materials
Check the quality of material brought in once in a month.
Ensure cleanliness of the material before use.
Store the material properly in a closed container
Wash the vegetable/rice/ grain before cooking.
Cook the item hygienic condition.
Always use the filtered water for cooking/drinking.
Clean the utensils properly with branded cleaning material before use.
Use a clean and dry cloth to wipe plates for serving food.
Display boards like “Save water”, “Don’t waste water”. ,” Water is life! Save water, save a life!” “Save water secure the future! “Conserve water, our life’s on the brink!” “Save water it will save you later!” “Wastewater today – Live in desert tomorrow” ”Do not waste food” “Use Dust bin” “Cleanliness is next to Godliness” etc should be displayed at
The canteen and the kitchen are to clean every day with proper disinfectants and fly proof nets are to be provided in the doors and windows.
In case of washing of canteen floors sign such as “Wet flooring ” should be used
The drinking water is to be treated before use.
E) HANDLING OF WASTE:
Remove all type of canteen waste except plastic bag properly and put it in the closed container kept for the purpose and hand over to piggery. Plastic bags after segregation are to be put in the scrap area.
Don’t discharge any waste to drainage.
Provide wire mesh to the washing area/wash basin to avoid waste entry.
Clean all utensils in the designated area so that washing water does not go in the stormwater drain.
Ensure that wastewater from the canteen is discharge to STP which after treatment is used as water for gardening.
Ensure that the drainage is not blocked or damaged and should be cleaned periodically.
Ensure that the wastewater from canteen does not spill from drainage or is not stagnated
F) Maintenance of LPG Cylinder
Use gas cylinder economically.
Replace the rubber hose of the gas cylinders periodically.
Clean burners regularly and ensure regulators are working smoothly.
Do not store any inflammable materials in the cooking area.
The following EHS document templates (toolkits) are provided totally complimentary, free of charge to use as a starting point for ISO 14001:2015 and 45001:2018 compliance. These are the actual EMS documents currently in use for compliance with ISO 14001:2015 and 45001:2018 requirements. As each business is different, additional EHS documents or revisions would be required to meet your organization’s specific needs, requirements, context, risk profile, etc. If after reading through all of these documents, you feel like you still need a consulting partner to help you develop your new EHS documents – Contact Us. We’re always looking for interesting new clients and projects.
Aspects And Impacts Analysis Register
Sr. no
Areas/ Location
Activity
Activity Type (R / NR / E)
Aspects
Impacts
E (emergency)
IPC (Interested Party Concern)
LC (Legal concern)
RSP (Resource saving potential)
Present / Existing controls
Severity
Frequency of Occurrences
Time to notice
Present risk factor
Calculated significance (S/NS)
Link to Objective / Program, OCP
HAZARDS AND RISKS ANALYSIS REGISTER
Sr. no
Date of Entry
Areas/ Location
Activity
Activity Type ( R/NR)
Hazards
Risk
E (emergency)
IPC (Interested Party Concern)
LC (Legal Concern)
RSP (Resource saving potential)
Present / Existing controls
Severity
Frequency of Occurrences
Time to notice
Present risk factor
Controls added to reduce risks
Severity
Frequency of Occurrences
Time to notice
Present risk factor
Final (S/NS)
Link to Objective / Program, OCP
SIGNIFICANT ASPECTS AND IMPACTS ANALYSIS REGISTER
Sr.No.
Activity
Aspect
LC
IPC
Impact
Controls
SIGNIFICANT HAZARDS AND RISKS ANALYSIS REGISTER
Nature Of Activity
Hazard
Likely Hazardous Incidence/ Situation
Risk Involved
Current Risk Control System
Is Risk Tolerable
If No, Proposed Risk Control System
Targets and Objectives
Sr No
Description of Objectives
EHSMP Description
MP No, Rev No & Date
Present Status
Set Target
Time Frame
Derived From
Training Plan for the year xxx
Sr. No
Training Topic
Target Group
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1
Awareness Training on EOHS Management System.
All employees
2
Awareness Training on EOHS Policy
All employees & Workers
3
Awareness Training on Environmental Legal & Other requirements
Core Team Members
4
Awareness Training on OH&S Legal & Other requirements.
Core Team Members
5
Identification of Aspects & Impact & Evaluation of Environmental aspects.
Core Team Members
6
Awareness Training on Significant Aspects
Core Team Members
7
Identification of Hazard, Risk & Risk assessment
Core Team Members
8
Awareness of Significant Hazard
Core Team Members
9
Awareness of EOHS Objectives.
All employees & Workers
10
Roles, responsibility & authority for effective implementation of EOHS Management System.
Core Team Members
11
Communication with Interested parties
Security
12
Awareness Training on Operational Control procedure.
Respective personnel from all areas
13
Awareness training on Mock Drill
All employees including workers & Interested Parties
14
Awareness training on safety requirement in shop floor during handling of product & Specific requirements
Employees & Workers
15
Fire Fighting
ERT
16
First Aid
ERT
17
Emergency Preparedness & response
ERT
18
Awareness of Handling Chemicals & Oils including Haz waste
Respective personnel
19
Awareness of Material safety data sheet.
Respective personnel
20
Hazardous waste Handling, storage & disposal
Personnel involved in Haz waste handling
21
Waste Management
Workers
22
Storage of oil barrels & used oils.
Workers
23
Spillage management
ERT
24
Identification of environmental Non-conformities.
Supervisors / ERT
25
EOHS Internal Auditors Training
Core Team Members
26
Fork Lift Maintenance
Maintenance
27
Machine maintenance & Handling of different waste
Maintenance
28
Scrap Handling, storage & Maintenance of scrap.
Workers
Master List of waste
Non-Hazardous Waste ( General Waste)
Sr. No
Name of Waste
QTY
Department
1
Corrugated Boxes
171kg
QA, PDN, PUR
2
Toilet Paper
1 kg
Admin
3
Old Records
5kg
All Depts.
4
Waste paper & carbon
2kg
All Depts.
5
Packing boxes etc.
21kg
QA, PDN, PUR
6
Packing material of welding rods
3kg
Tool Room
7
Plastic Articles, Cans
11kg
All depts.
8
Empty water bottle
27kg
All depts.
9
Waste PP belt of packing
0.5kg
PDN,
10
Broken Plastic Bins
200kg
STR
11
Metal Flash
23kg
Production
12
Metal End Pieces
5kg
SNS
13
Forgings
123kg
QA
14
Turning Burr & Boring Burr
33kg
Tool Room, SNS
15
Welding rods
73kg
Tool Room
16
Used tooling
126kg
Tool Room, Maint
17
Maintenance scrap tools
1kg
Maintenance
18
Gun Metal Parts
4kg
Maintenance
19
EDM Wire
0.5kg
Tool Room
20
Stainless Steel Metal Flash
0.5kg
Production
21
Metal End Pieces
0.5kg
SNS
22
Forgings
12kg
QA
23
Turning Burr & Boring Burr
47kg
Tool Room, SNS
24
Maintenance scrap
0.5kg
Maintenance
25
HRC Trays
3kg
Heat Treatment
26
Waste boxes of waste packing material
18kg
PDN, PUR
27
Garden Waste
9kg
Admin
28
Waste packing material
132kg
PDN, QA
Hazardous Waste
Sr. No
Name of Waste
QTY
Department
All type of Used Oil
100l
PDN, QA, MNT,
Used coolant
4567l
PDN, Tool Room, SNS, PAD/MFD Machine Shop
Grease
34kg
Maint, Production
Oil soaked Gunny Bags
657kg
Maint, Production
Oil filters
3kg
Maint.
Oil soaked cotton waste & hand gloves, Cotton Rags
1234kg
All dept.
Empty oil container
1245kg
MNT, STR, QA, SNS, Tool Room
Paint Cans
253kg
Shipping, Maintenance, QA, Prod
Used Brushes
12kg
Production, Maintenance, TRM, QA
Oil Soaked Scrap
1274kg
Maintenance, Production, QA, HT
Phosphating Chemicals
0.5 kg
Production, QA
HCL Acid
0.5 kg
QA lab
Ceramic Wool
5kg
HT
Choke, Ultra violate lamp, Tube light, all types of bulb, Cells
0.5 kg
All dept.
Carbon paper, Printing ribbon, Toner cartridge
0.5 kg
All dept.
Magnaflux Powder
2kg
QA, Production
Oil Based Die Lubricant
0.5 T
Production
Water Based Die Lubricant
1.5 T
Production
HSE INDUCTION TRAINING
Inductee Name:
Position:
Induction Date:
Topics to be discussed
S/N
Description
Yes
No
Remarks
1
Project Description
2
Company HSE Policy
3
Induction of Key Personnel
4
Site Layout and Welfare Facility
5
Site Rules (e.g. Drugs, alcohol & smoking policy, different signage’s, wearing PPE’s, avoid wearing pieces of jewelry, etc.)
6
Site Specific Hazards/ Risks/ Near Miss
7
Risk Assessment
8
Responsibility for accident prevention and the maintenance of a safe & healthful work environment
9
Work Permits
10
Environment and Waste Disposal
11
Emergency Procedures (alarm system, first aid box, assembly point, evacuation plan, escape routes, fire warden, first aider)
12
Employee and Supervisor for Reporting Accident
13
Vehicle on Site (Traffic Management)
14
Relevant and Applicable Laws
INCIDENT REPORT AND INVESTIGATION
Contract No
Project Name
Location
Prepared by [HSE Rep]:
Report No:
Date of Report:
TYPE OF INCIDENT (check all that apply)
Injury/ Illness
Vehicle Damage
High Potential (Near Miss)
Quality
Fire
Spill/ Release
Property Loss/ Damage
Permit or equivalent. Exceed
Security
Other
GENERAL INFORMATION
Company or subcontractor Name (s):
Date of incident: Day of Week: Time:
Supervisor on duty: Was Supervisor on Scene:Yes/No Phone:
Location of incident:
Weather/ Lighting Conditions:
DESCRIBE WHAT HAPPENED (step by step, use additional pages if necessary)
1. What was the employee doing, or what was happening, just before the incident occurred? Describe the activity, as well as the equipment, tools, or materials in use. Be specific, e.g., “Climbing a ladder while carrying tools” or “Driving near the parking area.”
2. What happened? What was the contact or event and how did it occur? E.g., “When the ladder slipped on the wet floor, the employee fell 20 feet” or “was distracted by a bee, swerved off the right side of the road and struck the stop sign”
IMMEDIATE CORRECTIVE ACTIONS (use additional pages if necessary)
AFFECTED EMPLOYEE INFORMATION (include injured person or employees whose activities resulted in the incident)
Name: Male/Female
Company:
Home Address: Home Phone#:
Date of Birth:
Job Classification: Years in job classification: Date of Hire:
Time Employee began work:
Did the incident relate to routine task for job Classification?: Yes/No
INJURY/ ILLNESS INFORMATION
Nature of the injury or illness (Body part affected and how it was affected, e.g. strained back):
Description of Injury:
Object/ Equipment/ Substance causing harm:
First Aid Provided: Yes/No If Yes, Where?: On-Site/Off Site
If Yes, who provide first aid?
Will the injury/ Illness result in:Restricted Duty/ Lost Time/Unknown
TREATMENT OR EVALUATION INFORMATION (Attach Provider’s Report/Statement)
Was the treatment or evaluation provided? Yes /No First Aid Evaluation Medical Treatment
If yes, where? On-Site Dr.’s Office Hospital Others:
Name of persons (S) Providing treatment or evaluation:
Address where treatment or evaluation was provided:
Type of treatment or evaluation:
Was the employee hospitalized overnight? Yes/No
PROPERTY LOSS OR DAMAGE INFORMATION
Property or Vehicle involved? Yes/No
Description of loss or damage: Estimated KWD Lost:
SPILL OR RELEASE INFORMATION
Substance spilled or released:From Where: From Where:
Estimated quantity/Duration:
The reportable quantity (RQ): RQ Exceeded? Yes/ No
Released to Water of State? Yes/No CERCLA Hazardous Substance? Yes.No
Response action is taken:
PERSONS PREPARING REPORT (Employee and Supervisor to Complete Report)
Employee’s Name:
Signature:
Date:
Employee’s Name:
Signature:
Date:
Employee’s Name:
Signature:
Date:
PERSONNEL NOTIFIED (Notify Health and Safety Representative Immediately)
ORGANIZATION
NAME (S)
DATE/TIME
HS Department Head
Project Manager
Received by [HS Rep] :
Date/Time:
Serious Incidents require immediate notification to the Corporate Safety Department. Fatalities or hospitalization (admittance) of three or more individuals requires notification to OSHA within 8 hours. Contact the Safety Manager to make the notification. If unavailable, the senior operations person on site should make the notification.
INCIDENT SKETCH
Write in street names and, if possible, the points of the compass. If a sketch appears on a police report or insurance form, this need not be completed. Attach the other report.
GENERAL INFORMATION
Company:
Date of Incident:
Date of Investigation Report:
Incident Cost:
Estimated: KWD
Actual: KWD
OSHA Recordable:
Yes/No
# Restricted days:
# Days away from work:
Was the activity addressed in an AHA? :
Yes (attach a copy)/No
CAUSE ANALYSIS
IMMEDIATE CAUSE- What actions and conditions contributed to this event? (See examples on next pages)
BASIC CAUSES- What specific personal or job factors contributed to this event? (See examples on next pages, use SCAT chart for guidance)
ACTION PLAN
ACTION
PERSON RESPONSIBLE
TARGET DATE
DATE COMPLETED
VERIFIED BY
REMEDIAL ACTIONS- What has been and/ should be done to control the causes listed? If applicable, include management program (see attached list) for control of incidents.
PERSONNEL PERFORMING INVESTIGATION
Name: (Print)
Signature:
Date:
Name: (Print)
Signature:
Date:
Name: (Print)
Signature:
Date:
Name: (Print)
Signature:
Date:
REVIEW AND APPROVAL
HS Dept. Head:
Signature:
Date:
Comments:
Project Manager:
Signature:
Date:
Comments:
Operations Manager:
Signature:
Date:
Comments:
NOTE: Attach additional information as necessary, i.e. pictures, statements, etc.
6. Inadequate work standards or procedural controls
7. Excessive wear and tear
8. Inadequate communications
MANAGEMENT PROGRAMS FOR CONTROL OF INCIDENTS
1. Leadership and administration
2. Management training
3. Planned inspections and maintenance
4. Task analysis and procedures
5. Task observation
6. Emergency preparedness
7. Rules and work permits
8. Accident/incident analysis
9. Personal protective equipment
10. Health control
11. Program audits
12. Engineering and change management
13. Personal communications
14. Group communications
15. General promotions/awareness
16. Hiring and placement
17. Purchasing controls
18. Off-the-job safety
EHS Management Program
A.
Significant Environmental Aspect/Hazard:
1.
Objective(s):
2
Target(s):
3
Reason for Significance:
4
Legal or Other Requirements:
Sr. No.
Action
Responsibility
Timeline
Budget
Remark
Sr. No.
Action
Responsibility
Timeline
Budget
Remark
Sr. No.
Action
Responsibility
Timeline
Budget
Remark
6
Other Documents Related to this EMP (Operational Control or Procedure):
7
Records and Documents: Person Responsible and Location:
8
Person(s) Responsible for Program Management:
List of Safety Committee/CFT/Fire fighting team/First aid team
Sr. No.
Name of the person
Designation
Status
Department
Contact number
HOUSEKEEPING INSPECTION CHECKLIST
General Information
Area/Location:
Date:
Conducted by [HS Rep]:
Signature:
Description
S/N
ITEM
EVALUATION YES/NO/NA
REMARKS
(Corrective action and recommendations)
1
Proper signage’s posted on the fence, lay-down area and around the offices?
2
Roads in good condition and dust control are maintained?
3
No water accumulation and floors are dry?
4
Clear and safe access to work areas?
5
All stairways, passageways, gangways, and access ways shall be kept free of materials, supplies, and obstructions at all times.
6
Tools, materials, extension cords, hoses, or debris shall not cause tripping or other hazards.
7
Form and scrap lumber and debris shall be cleared formwork areas and access ways
8
Site office and the site area in general cleanliness and orderliness?
9
Construction waste and debris collected in the designated area?
10
Adequate rubbish container and rubbish removed daily?
11
Old timber de-nailed and all protruding steel bars are capped?
12
Material stacking and any loose materials had been properly stored?
13
Site in general cleanliness and orderliness?
Note: Corrective and recommended actions must be implemented immediately. ( references in parenthesis)
Reviewed by [HS Dept]:
POSITION
NAME
SIGNATURE
DATE
Distribution and acknowledgment:
Project Manager
Construction Manager
QA/QC Engineer
Site Engineer
PPE INSPECTION CHECKLIST (PERSONAL PROTECTIVE EQUIPMENT)
General Information
Area/Location:
Date:
Conducted By [HSE Rep]:
Signature:
Description
S/N
ITEM
EVALUATION (YES/NO/ NA)
REMARKS (Corrective action and recommendations)
1
Are PPE used as required?
2
Minimum PPE (i.e. helmet, safety boots, hi-visibility vest, safety glasses) provided to all employees and records maintained?
3
A copy of the PPE manufacturer manual is available?
4
Users trained on using, maintenance and storage of PPE?
5
Additional PPE have been provided as appropriate for those who are executing critical activities (e.g. fully body harness for working at height, full face mask breathing apparatus, etc.)?
6
PPE correctly selected based on the task risk assessment?
7
Regularly inspected, cleaned and maintained and replace when deemed necessary?
8
Safety glass complies with ANSI standard?
9
Protective (cover) glass used for the person using eyeglasses?
10
Hearing protection being used for workers exposed to noise?
11
Head protection being used on hardhat area?
12
Are protective head gears in compliance with ANSI standard?
13
Is protective footwear being used?
14
Do protective footwear meets the ASTM F2412?
15
Are high visibility vest being used on site? )
16
Are high visibility vest complies with ANSI standards?
Note: Corrective and recommended actions must be implemented immediately.
Reviewed by [HS Dept]:
POSITION
NAME
SIGNATURE
DATE
Distribution and acknowledgment:
Project Manager
Construction Manager
QA/QC Engineer
Site Engineer
VISITORS SITE BRIEFING CHECKLIST
Visitors name:
Area/Location:
Date:
Conducted By [HSE Rep]:
Signature:
Topics to be discussed
S/N
Description
EVALUATION (YES/NO/ NA)
REMARKS
1
SITE SAFETY TOOLS
2
PPE
Smoking
4
Consumption of Food and Drinks
5
Access and Safe Walk Area
6
Vehicle Speed Limit
7
Safety and Advisory Sign
8
SITE HAZARDS
9
Ongoing Activity
10
Vehicle Movement
11
SITE MAP
12
Site Offices
13
Welfare Facility
14
Emergency Muster Station
Note: Corrective and recommended actions must be implemented immediately.
Signature and Remarks
Visitor’s Signature
Name:
Company
Remark:
Visitor’s Signature
Name:
Company
Remark:
Visitor’s Signature
Name:
Company
Remark:
Visitor’s Signature
Name:
Company
Remark:
Conducted by:
Job Title:
SIGNATURE
DATE:
Reviewed by [HS Dept]:
Job Title:
SIGNATURE
DATE:
Sample Environment, Health, and Safety Policy
EHS Policy
We, at XXX, are committed for continual improvement to achieve Safe, Healthy and Environmental friendly working conditions Through…..
Creating awareness amongst the employees for safe working practices
Inculcating in all employees, a sense of responsibility for Safety, Health & Environment not only at the workplace but also in society at large
Complying with relevant legislation, regulations and other requirements for Environmental Management System, Occupational Health & Safety
Conservation of natural resources and prevention of pollution, prevention of ill health & injuries
Effective recycling and minimizing waste generation
METAL PRODUCTS COMPANY’s IMS Policy
METAL PRODUCTS COMPANY is committed to:
The satisfaction of our customers in all respects by supplying high-quality products, complying to the relevant standards, always on time
Fulfill our commitment through total involvement of all at METAL PRODUCTS COMPANY and with continual improvement in our integrated management system.
Identify, prevent, control and minimize adverse environmental impacts associated with our operational activities.
Comply with all quality, environmental, Health & Safety requirements.
Develop and maintain a highly motivated and trained workforce for effective management of the quality, environment, and Health & Safety issues.
Communicate our environmental commitment to clients, employees and other interested parties.
Strive to continually improve our quality, environmental and Health & Safety performance keeping in view the regulatory requirements, Health & Safety requirements, environmental requirements, community concerns, and technological advancements. Establish & maintain a healthy work environment.
Comply with applicable legal requirements.
Adopt the best practice of operations to prevent ill health & injuries
WEEKLY SAFETY REPORT
Contract No
Project Name
Location
Date From: To:
Description
JOB SAFETY ACTIONS/SAFETY INSPECTIONS
CONDUCTED (YES/NO/ NA)
REMARKS
Was the Job Safety Meeting Held?
Were there lost time Accidents?
Miscellaneous Incidents?
Trench/Excavations: Competent Person daily inspection performed?
Scaffolding: Competent Person daily inspection performed?
Confined Space: Competent Person pre-entry inspection performed?
Reported to:
IR Submitted:
Safety/QC Meetings/Inspections Conducted (List):
Field Activities:
Safety Findings & Corrective Actions:
Safety Findings
Corrective Actions
Prepared by [HSE Rep]:
Reviewed by [HS Dept]:
Signature:
Signature:
For Head Office use only:
Operations Manager
Project Director
Others
Risk Register
Risk description
“Likelihood (L)”
“Severity (S)”
“Risk level (L * S)”
Risk Mitigation
Responsibility
Deadline
Evaluation date
Evaluation result
Opportunity Register
Opportunity description
“Likelihood (L)”
“Benefit (B)”
“Opportunity Factor (L * B)”
Opportunity Pursuit Plan
Responsibility
Deadline
Evaluation date
Evaluation result
Noncompliance Notice
Employee Information
Employee Name:
Job Title:
Date:
Dept/ Organization (Third party):
Supervisor Name:
Type of Notice
First Notice
Second Notice
Final Notice
Classification
Failure to use PPE Properly
Inadequate Guards/Barriers
Inadequate Warning System
Other:
Defective tools/Equipment/Materials
Poor Housekeeping/Disorder
Violation of Safety Rules
Details
Description of Noncompliance:
Non-Compliance Picture:
Violation Photo
Immediate Action Taken:
Close-Out Picture:
Correction Photo
Recommended Corrective Action:
Acknowledgment:
By signing this form, you confirm that you understand the information in this warning. You also confirm that you and your Supervisor have discussed the issue and a plan for improvement. Signing this form does not necessarily indicate that you agree with this warning.
Employee Name: Signature Date
Supervisor Name Signature Date
Witness Name & Signature (if the employee understands warning but refuses to sign)
Date
Prepared by [HS Dept]:
Job Title:
Name:
Signature:
TOOLS INSPECTION CHECKLIST
General Information
Area/Location:
Type of Tools:
Conducted By:
Signature:
Date:
Description
S/N
ITEM
EVALUATION (YES/NO/ NA)
REMARKS
(Corrective action and recommendations)
1
Tools checked and inspected before use?
2
Guards are fitted, adjusted, and tools in good condition?
3
Non sparkling tools used near source ignition area?
4
No loose and frayed clothing while working with power tools?
5
Are floor and bench mounted power tools anchored or securely clamped to a firm foundation?
6
Grinder and abrasive machinery with the guard?
7
Damaged or cracked abrasive wheel?
8
Has circular saw equipped with guard and kickback device?
9
Are safety clips and retainers installed and maintained on pneumatic tools?
10
Is the explosive actuated tool operator trained and qualified?
11
Is proper safekeeping power actuated tool being followed?
12
Is manufacturer instruction is available and being followed?
13
All hoses, coupling, and fittings of the correct rating and inspected and maintained regularly?
14
Tools secured to the hose by positive means to prevent disconnection?
15
Air supply line protected from drainage, maintained and inspected regularly?
16
The safety device is provided for air hose with large diameter?
17
Home-made tools are not used and tools being used fit for the job?
18
Suitable PPE provided for any type of job using portable tools?
Reviewed by [HS Dept]:
POSITION
NAME
SIGNATURE
DATE
Distribution and acknowledgment:
Project Manager
Construction Manager
QA/QC Engineer
Site Engineer
JOB HAZARD / SAFETY ANALYSIS
Job Hazard/Safety Analysis (JHA/JSA) REVIEWS
Reviewed & Approved by:
Reviewed & Approved by:
Reviewed & Approved by:
Signature & date:
Signature & date:
Signature & date:
All signature blocks completed indicate authorization to perform identified Activity’s.
Drawings Attached: Yes No
Definable Work Activity:
Revision No:
Date:
Work Task
Potential Hazard(s)
Control Measure (s), Required Training, -required Permits or Plans, and Competent Person (s)
Equipment to be Used
Required Inspections
Required Training
JHA REVIEW/Pre-Job Brief attendance roster
Name
Signature
Date
Name
Signature
Date
By signing below, I agree to the following: § I agree to follow the work steps and implement the controls as written. § I agree to stop work when conditions or hazards change or when I encounter unexpected conditions during the execution of work, or when work cannot be performed as written, or instructions become unclear during execution. § I confirm that I am authorized, qualified and fit to perform the work.
Instruments Calibration history chart
Description:
Location:
Identification no:
Specification:
Acceptance criteria:
Cal. Frequency:
Sr no.
Calibration Date
Calibration.Agency
Certificate. No.
Calibration Status
Cal.Due On
Inspected By
Approved By
REMARKS
Calibration Schedule
Sr.No
Device ID NO.
Description
Calibration Frequency
Calibration Done on (Date)
Next Calibration Due on (Date)
REMARKS
Lessons Learnt log
ID
Date
Entered By
Subject
Situation
Recommendations & Comments
Communication Plan
Communications item
what
Who
Who Attends
When
When Format
TRAINING NEEDS IDENTIFICATION
TRAINING NEEDS IDENTIFICATION
Year:
Jan-2023 TO Dec-2023
DEPARTMENT:
Sr No
Name of Employee
Employee No
Signature
NOTE – MARK ” √ ” if particular employee needs training of specified topic
HOD Name & Signature:
ON JOB TRAINING RECORD
Sr. No
Name of employees
Emp – No
Date
Time
Department/ Section
Training Topic
Emp Sign
Training Give By
Training Effectiveness
Remarks
VERIFIED BY:
Dept Head
CHECKED BY
: HR. IR & ADMIN
TRAINING ATTENDANCE SHEET
Title of Training Course:
Date of Training:
Duration:
Name of Trainer:
Title of Trainer:
List of Attendees
LAST NAME
FIRST NAME
TITLE
SIGNATURE
SERVICING OF FIRE EXTINGUISHER
Sr. No
F.E. No
Location
Type of Fire Extinguisher
Capacity
H.P. tested on
H.P test due date
Refilled on
Refilling Due date:
Defect / Required spare
Remarks/ Corrective action
VERIFIED BY: Dept Head
CHECKED BY: HR. IR & ADMIN
Document Matrix
Sr.No.
Document Name and Identification
Location
Responsibility
Revision
Document Type (Soft/ Hard/ Both)
Protection
Retrieval
Retention Time
Disposition
Example of Report of Mock drill
Scenario: Oily rags used in the shop floor are removed outside and thrown in the storage area where they catch fire due to welding activity. Dried grass present around gets ignited resulting in a wildfire.
11:00 am: Smoke coming out from the back of the Press shop is seen by the security guard Mr. P. P. Deshmukh who was on a patrol round.
11:02 am: Mr. P. P. Deshmukh immediately reached on the spot to find that there was a fire in an incipient stage due to the welding activity going around and the sparks flying out of it.
11:03 am: Mr. P. P. Deshmukh immediately stopped the welding activity and alerted the contractor person working around who did not keep any water or sand bucket or any water fire extinguisher with him while working.
11:04 am: Mr. P. P. Deshmukh immediately called up Gate office/Emergency Control Centre and Security supervisor Mr. M. N. Jorvekar who in turn called up Asst. Safety Manager Mr. Santosh Kasalkar, Site Controller Mr. Sunilkumar Shinde and Incident Controller Mr. J. G. Swami.
11:05 am: Mr. Kasalkar and Mr. Jorvekar rushed to the spot to find that the fire had grown wild due to the surrounding dry grass. Mr. Kasalkar immediately informed Mr. Sunilkumar Shinde about the situation who inturn declared it an emergency and ordered the Main Gate to be closed and the wailing emergency siren to be sounded.
11:07 am: Fire fighting team members rushed on to the spot with ABC fire extinguishers and the garden pipe was also started. One of the operators Mr. Gangadhar Suryawanshi got injured while trying to rush to the spot with the extinguisher. Communication Officer Mr. Padghan immediately called the Ambulance which took him away to the medical dispensary for first aid. In the meanwhile, all the operators working inside rushed out and gathered at the safe assembly point. A head count was taken to check for any missing person.
11:10 am: Fire was completely extinguished with the help of ABC fire extinguishers and the garden hose. The all-clear siren was sounded. A meeting was held on the spot to study the observations and take corrective and preventive action.
Following were the Observations made: 1) Welding activity should have been carried out under the supervision of concerned department supervisor. 2) Before starting, adequate safety measures like availability of fire extinguishers, water and sand buckets, etc should be made. 3) Welding activity should be carried out at such a place which is away from flammable liquids, gas or other fuels like dried grass, oily rags, etc which can easily catch fire due to the flying sparks. 4) The welder had a small piece of a broken glass which he held in front of his eyes during welding while his helper did not have anything and held his hand in front of his eyes. 5) The electrical connection was far off and the wire traveled all along the floor without any protection. Also, there was no proper 3 pin plug and the wires were just tucked inside the switchboard. 6) Took some time for the fire fighting team members to transfer the extinguisher to the site as ABC fire extinguisher was not visible anywhere. 7) Ambulance siren and light not working.
Following Corrective actions are taken.
1) All welding activity will be done under the supervision of the contractor and the concerned dept supervisor. 2) Both the responsible persons will ensure that welding is done at a safe designated area, with proper electrical connections and with the right PPE’s used. 3) Fire fighting extinguishers, buckets, etc will be first arranged for before starting the activity. 4) The security dept is to be made aware of by informing them before starting the welding work. 5) The ambulance needs to be checked by the security every day for level of fuel, and every week for battery charge status, condition of first aid box, siren light, etc. 6) Response time to be reduced further by swift transfer of extinguishers to the site. Training to be given for fast operation to the firefighters.
Prepared By: Approved By:
Nonconforming Service Report (NSR)
Date: Reported by: Recorded by:
Summarize the reported service nonconformity. Attach or reference applicable documentation (emails, etc.)
Initial Review:
◙ Nonconformity affirmed, proceed with the investigation ◙ Nonconformity could not be affirmed or replicated; stop and monitor for further occurrences. ◙ No nonconformity; stop.
Initial Review by: Date:
Root cause analysis:
Disposition (check all that apply)
◙ Issue Refund ◙ Provide corrected service. Details: ◙ Provide new services. Details: ◙ File [CAR Form Abbreviation]; reference [CAR Form Abbreviation] #: ◙ Customer waiver. Details: ◙ Other action. Details:
Remark:
Disposition Approval by: Date:
Customer Approval by: Date:
List of Internal Auditor
Sr. No.
Name of Internal Auditor
Designation
Reporting to
Criteria for selection of Internal Auditor w.r.t. experience & skill –
Evaluation Result 1: Compliance 2: Compliance partially 3: Non-Compliance
Non-compliance observation during the evaluation ( if any )
Remarks
1
Management of wastes is regulated by Law No. 21/1995 as amended by Law No. 16/1996 and Decision 210/2001.
HSE Dept.
2
Kuwait EPA Regulations 2002 (Gazette 533) – Chapter 1- Articles 1 to 5 is about environmental outcomes of development projects
3
Kuwait EPA Regulations 2002 (Gazette 533) – Chapter 4- Articles 19 to 45 is regarding waste issues
4
Kuwait EPA Regulations 2002 (Gazette 533) – Chapter 5- Articles 58 to 70 is regarding the protection of marine and coastal environment
5
Kuwait EPA Regulations 2002 (Gazette 533) – Chapter 6- Articles 71 to 73 is regarding the protection of earth from pollution
6
Kuwait EPA Regulations 2002 (Gazette 533) – Chapter 9- Articles 86 to 89 is regarding KEPA legal control
OCCUPATIONAL HEALTH & SAFETY
Institutions and Programs relating to OSH administration and/or enforcement
1
Decree 42 of 1979 – Ministerial Order No. 42, to establish a standing committee to coordinate the work of the Ministry of Social Affairs and Labour and the Ministry of Public Health in connection with occupational health and safety. (Art. 1 & 2)
HSE Dept.
Employers’ duties and responsibilities to protect the safety and health of workers and others
2
Duty to ensure the health and safety of employees – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 83)
HSE Dept.
3
Surveillance of workers’ health in relation to work – Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Chapter II, Article 26 item d)
4
Surveillance of the working environment and working practices – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 83)
Duty to provide personal protective equipment – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 83)
5
Duty to ensure the usage of personal protective equipment – Ministerial Decree No. 22, respecting safety precautions to be taken against occupational injury and disease. (Section II, Article 25)
6
Duty to provide first-aid and welfare facilities – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 86; Section 1, Article 21)
Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section I, Article 17)
Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section I, Article 18)
Employers’ duty to organize prevention formally along generally accepted OSH management principles and practices
7
Policy or plan specifying responsibilities and arrangements for health and safety – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Arts. 82- 83)
HSE Dept.
8
Appointment of a person for health and safety – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 85)
9
Safe operating work systems and procedures – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 84)
Ministerial Decree No. 164/2006 amending several provisions from Ministerial Decree No. 114/1996 regarding the Requirements and Conditions that Should be Provided in Work Places to Protect the Employees from Work Hazards. (Article 7, Paragraph 1)
10
Training and information on risks – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 84)
11
Review or assessment of the results of preventive measures – Ministerial Decree No. 164/2006 amending several provisions from Ministerial Decree No. 114/1996 regarding the Requirements and Conditions that Should be Provided in Work Places to Protect the Employees from Work Hazards. (Article 7, Paragraph 1)
Employer’s duty to ensure the availability of expertise and competence in health and duty
12
The requirement to access expert advice and/or support in health and safety – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 85)
HSE Dept.
13
Qualifications of experts or professional services – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 85)
14
Appointment of an OSH practitioner – Ministerial Decree No. 164/2006 amending several provisions from Ministerial Decree No. 114/1996 regarding the Requirements and Conditions that Should be Provided in Work Places to Protect the Employees from Work Hazards. (Article 7, Paragraph 1)
Workers’ rights and duties
15
Duty to take reasonable steps to protect their own safety and health – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 87)
HSE Dept.
16
Duty to take reasonable steps to protect the safety and health of others – Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Article 24)
17
Duty to comply with OSH-related requirements – Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Article 24)
18
Right to inquire about risks and preventive measures – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 84)
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section II, Article 22)
19
Right to withdraw with compensation when workers are not reassigned to non-hazard work – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter III, Section III, Article 48)
Specific hazards and risks
20
Vibration and noise – Order No. 45, to publish scales, standards and measures for safety at workplaces.
Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Part I Article 16)
HSE Dept.
21
Working at height
• Order No. 1/95 of 1995 to prescribe the safety conditions and requirements to be met for scaffolding.
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Article 36(b))
22
Fire risks – Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 1, Art. 2, Art. 8)
23
Tobacco – Decree 23 of 2012 on smoke-free places
24
Asbestos – Resolution No. (26) of 1995 on asbestos
25
The Order No. 45 governs lighting, noise, temperature, harmful substances, dust –
• Order No. 45, to publish scales, standards and measures for safety at workplaces.
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Part I, Article 15)
HSE Dept.
26
Risks related to machinery and tools
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Articles 28 to 33)
27
Maintenance of machinery and equipment –
• Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 82)
28
Limits to women’s access to specific occupations, undertakings or shifts – Law No. 6/2010 concerning Labour in the Private Sector. (Section I, Articles 22 and 23)
Limits to workers’ access to specific occupations, undertakings or shifts by reason of age – Law No. 6/2010 concerning Labour in the Private Sector. (Section I, Articles 20-21)
• Decree No. 131 of 1977 on the control and use of ionizing radiation and protection from hazards. (§ 12)
Recording, notification and investigation of accidents/incidents and diseases
30
Duty to record and/or investigate the causes of work accidents, near misses incidents and cases of occupational diseases – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Articles 80-81)
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Article 26)
Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Articles 80-81)
• Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease. (Section 2, Article 26)
HSE Dept.
31
Employers’ duty to notify OSH authorities of work-related death and/or injuries to health – Law No. 6/2010 concerning Labour in the Private Sector. (Chapter IV, Section IV, Article 90, Article 92)
Kuwait Municipality HSE Guidelines
1
Ministerial Order No. 224/P of 2014 on Instructions and Safety Signage in the Workplace. Adoption: 2014-02-16 | KWT-2014-R-99807
HSE Dept.
2
Decree No. 23 of 2012 on Smoke-Free Places. Adoption: 2012 | KWT-2012-R-97530
3
Ministerial Decree No. 164/2006 amending several provisions from Ministerial Decree No. 114/1996 regarding the Requirements and Conditions that Should be Provided in Work Places to Protect the Employees from Work Hazards. Adoption: 2006-08-02 KWT-2006-R-83273
4
Order No. 1/95 of 1995 to prescribe the safety conditions and requirements to be met for scaffolding. Adoption: 1995-07-23 KWT-1995-L-42989
5
Ministerial Order No. 56: protection from machinery. Adoption: 1982-01-01 | KWT-1982-R-16751
6
Legislative Decree No. 31, respecting safety, order and discipline on board ship. Adoption: 1980-05-18 | KWT-1980-L-11733
HSE Dept.
7
Ministerial Order No. 46, respecting the powers and duties of the officials appointed by the Ministry of Public Health to supervise compliance with labour laws, orders and regulations relating to occupational health. Adoption: 1980 KWT-1980-R-12288
8
Order No. 45, to publish scales, standards and measures for safety at workplaces. Adoption: 1979 | KWT-1979-R-12287
9
Ministerial Decree No. 22, respecting the safety precautions to be taken against occupational injury and disease.Adoption: 1974 | KWT-1974-R-14922
An emergency is a situation, which may lead to or cause large-scale damage or destruction to life or property or environment within or outside the factory. Sometimes the Emergency results in uncontrollable situations and leads to disaster. Such an unexpected severe situation may be too great for the normal workforce in the area within the plant. In any industry, an emergency can arise at any moment and this depends on the type of
Structure
Raw Materials
Machines / Plant
Nearby Industries etc.
2.0 NATURE OF EMERGENCY
The emergency has been identified and can be specified in one or more of the followings with source and effect:
Sr. No.
Emergency
Source
Effect
1
Fire / Explosion
Electrical Panels, Flammable oil storage tanks, Compressors, coolants, paints, etc.
Small fires, complete equipment loss, complete Area burn out. Air pollution Soil pollution. Dangers to Human beings
2
Spillage of flammable / Hazardous Oils & coolants etc
Hydraulic oil, Furnace Oil, Coolant etc.
Fire Burns Soil pollution. Injury by slippage
3
Electric Shock
Electrical panels, Power Distribution Board, DG Set, Overhead Crane, Voltage stabilizer, Electric Transformer & Machine Operated by electricity, etc.
Burns, suffocation, Death. Toxic chemical ingestion into the bloodstream
4
Accidents – Factory (Major)
Fall from height & Falling of Heavy Materials, Dies, Bins or other Heavy objects.
Fracture
5
Accidents-Transport
Accident due to the transportation of man & material
Death or Injury to Body
6
Personal confinement
Toilets, offices, Basement
Suffocation
7
Natural calamities such as storm, earthquakes, etc.
Nature
Structural collapse, Death
8
Structure collapse
Office building, & Any Wall or a part Of Factory building.
Serious injury, Major Fracture, Death
9
Riots, Arson, Sabotation
Anti-Social elements.
Serious injury, major Fracture, Death.
10
LPG leakage
Fire Hazard
Serious injury, Death
11
TANK DYKE Fire
Fire Hazard
Serious injury, Death
12
Electric fire
Fire Hazard
Serious injury, Death
13
Office fire
Fire Hazard
Serious injury, Death
14
Person on flames
Fire Hazard
Serious injury, Death
15
Food/Water Poisoning
Health Hazard
Poisoning, Death
16
Bomb hoax
Bomb Threat
Explosion, Death, fear
17
Burn-Minor
Health Hazard
Burn injury
18
Electric shock casualties
Health Hazard
Injury, Death
19
Non Functioning of STP and ETP
Spillage of untreated water on the ground
Land Contamination
3.0 OBJECTIVES:
The objective of the major emergency procedure should be to make maximum use of the combined resources of the works and the outside services to
Effect the rescue and treatment of casualties;
Safeguard other people;
Minimize damage to property and the environment;
Initially, contain and ultimately bring the incident under control;
Identify any deed and provide for the needs of relatives;
Provide authoritative information to news media;
Secure the safe rehabilitation of affected areas;
Preserve relevant records of equipment by the subsequent inquiry into the cause and circumstances of emergency;
4.0 EMERGENCY MANAGEMENT & KEY PERSONS
During an emergency situation, it is generally seen that chaos and confusion rules leading to more damage. In Emergency Management, just like in normal operations where there are managers, engineers, supervisors, operators, etc., who are assigned specific tasks to run the business, similarly during an emergency also there are persons with specific duties. These persons are known as ‘Key Personnel’.
Following are the persons who are responsible to face the emergencies.
NAME
DESIGNATION
CONTACT NO
If required external help in case of an Emergency will be sought from appropriate sources. The required assistance from the probable sources has already been informed and consent obtained for the same.
5.0 ROLES & RESPONSIBILITIES:
5.1 Name & Address of the persons furnishing the information:
XXXXXX
XXXXXX
5.2 Any Individuals
When an emergency occurs, the person who observes it must evaluate the gravity of the emergency and he should alert all the factory personnel by activating the Emergency Siren. The emergency siren is activated just by pressing the Emergency Siren push button located at the main gate & other different locations. Then he immediately reports to the Emergency Control Centre (Main Security gate) and informs about the Emergency location.
5.3 Site Controller:
The Site Controller will assume overall responsibility for the factory/storage site and its personnel. His duties are to:
i) Assess the magnitude of the situation and decide if staff needs to be evacuated from their assembly points to identified safer areas
ii) Exercise direct operational control over areas other than those affected.
iii) Undertake a continuous review of possible developments and areas in consultation with key personnel as to whether shutting down of the plant or any section of the plant and evacuation of personnel are required.
iv) Liaise with senior officials of Police, Fire Brigade, Medical, and Factories Inspectorate and provide advice on possible effects on areas outside the factory premises.
v) Look after rehabilitation of affected persons on discontinuation of emergency.
vi) Issue authorized statements to news media and ensures that evidence is preserved for inquiries to be conducted by the statutory authorities.
5.4 Incident Controller:
The Head of the unit will act as an incident controller for that unit. Immediately on knowing about an emergency, he will rush to the incident site and take overall charge and report to the Site Controller. On arrival, he will assess the extent of emergency that exists and inform the Communication Officer accordingly. His duties will be to:
i) Direct all operations to stop within the affected area taking into consideration priorities for the safety of personnel, minimize damage to the plant, property and environment and minimize loss of materials
ii) Provide advice and information to the Fire/Security Officers and local fire service;
iii) Ensure that non-essential workers/staff of the areas affected are evacuated to the appropriate assembly point and the areas are searched for causalities
iv) Set up communication points and establish contact with the Emergency Control Centre in the event of failure of electric supply and internal telephones
v) Report on all significant developments to the communication officer and
vi) Have regard to the need to preserve the evidence so as to facilitate an enquiry into the cause and circumstances which caused or escalated the emergency.
5.5 Communication Officer:
He will also work as Liaison Officer and will be stationed at the main entrance (GateHouse) during the emergency. He will handle police, Press, and other inquiries, receive reports from roll-call leaders from assembly points, and pass on the absentee information to the Incident Controller. He shall maintain regular communication with the Incident Controller. He will:
Ensure that casualties receive adequate attention/ to arrange additional help if required and inform relatives;
Control traffic movements into the factory and ensure that alternative transport is available when the need arises; and
When an emergency is prolonged, arrange for the relief of personnel and organize refreshments/food.
Advise the Site controller of the situation, recommending evacuation of staff from assembly points if necessary.
Maintain proper agreed inventory in the control room.
Maintain a log of the incident on tape
In case of a prolonged emergency involving risk to outside areas by wind-blown materials, he shall contact the local meteorological office to receive early notification of changes in weather conditions.
5.6 Security Officer-
Security Officer will be responsible for fire fighting. On hearing the fire alarm, he shall reach the fire station immediately and advise fire and security staff in the factory of the incident zone. He will convey the message to the communication officer, Incident Controller and Site Controller about the incident zone. He will direct emergency services. He shall
1) Announce over the PAS in which zone the incident has occurred and on the advice of the Shift Executive In-charge inform the staff to evacuate the assembly service.
2) Inform the Shift Executive In-charge
3) Call Incident Controller, Engineering/ Production Manager, Personnel and Administrative Manager, Departmental Head in whose plant the incident occurred.
4) Security Supervisor for each unit will act as the Security officer for that unit.
5.7 Receptionist:
On hearing the emergency alarm, the receptionist shall immediately contact the Site Controller and on his advice will call the local Fire-brigade and or Police station and safety committee members. In case the PAS and telephone system becomes inoperative, she shall inform the communication officer through the messenger. In case the fire is detected and the alarm is not in operation, she shall receive information about the location from the person who detected the fire and immediately consults the Incident Controller. On his advice, she shall contact the Security Guard and advised him to make an announcement on PAS about the incident and the location of the incident and to evacuate to their assembly point. She will continue to operate the switchboard advising the callers and pass all calls connected with the incident to the Communication Officer.
5,8 Departmental Heads:
The HODs will report to the Incident Controller and provide assistance as required. They will decide the staff they require at the incident site.
5.9 Maintenance In-Charge and Electricians:
They will report the scene of the incident and close down the services as directed by the Incident Controller
5.10 Shift Executive In-charge:
As soon as he becomes aware of the emergency and its location, he will proceed to the scene. He shall assess the scale of the incident and direct operations within the affected areas with the following priorities:
Secure the safety of persons, which may require evacuation to the assembly points in the event of an escape of materials if the wind is from an adverse direction.
Minimize damage to plant, property and the environment.
Prevent spreading and damage to outside the premises.
Minimize loss of materials;
Have regard to the need for preserving evidence that may facilitate subsequent enquiry.
Inform shift engineer-in-charge as to what services are needed or not needed.
Hand over the charge of the operation to the Incident Controller when he arrives at the site.
Advice the Security Officer at Gate whether to make an announcement on PAS or not to call the Senior Staff to the factory, if necessary.
5.11 First-Aid Teams:
The Personnel Manager shall keep the roll call lists for the fire and First Aid team on duty. The First Aid team is appointed by each Departmental Head for his shift team. Roll call leaders shall check their roles as a member of the services and report for emergency duty. The name of unaccounted persons or absentees will be informed to the Security Officer. Members of First Aid teams will report to the shift Executive In-Charge or Incident Controller on hearing the alarm and follow his directions.
3.12 Factory Fire Fighting Personnel:
The duty of the Fire Fighting personnel under the command of the Security Officer shall be responsible for fire fighting and rescue. On hearing the alarm they shall proceed to the place of the incident if know, or otherwise, they shall report to the Security Gate. The men at the security Gate shall find the location of the emergency, the equipment and proceed to the site or occurrence. At the site, the team will respond to the directions given by the Incident Controller
6.0 Roles & Responsibilities for Safety Teams:
After confirmation of the emergency location from the Emergency Control Centre, concerned teams will start functioning. The team leaders will coordinate and communicate with the management. The team member fights the emergency under the instructions of the leader. The team will ensure that:
The emergency does not spread.
The head count is taken in consultation with Liaison Manager and if necessary search operation for missing person/s. is undertaken.
Every member of the team uses the required Personal Protective Equipment while the operation is going on.
First aid is arranged.
Additional fire fighting equipment for the fire fighting team is arranged.
The smooth rescue operation is facilitated.
The emergency will be informed to fire brigade, neighbouring industries.
Medicines are provided.
Send injured to the hospital if necessary.
Records of first aid and hospitalization are maintained.
The help of other people is taken to control the emergency.
Remaining part of the plant is safe.
The area is cordoned off.
Necessary tools, equipment to handle any repair work are mobilized.
The main power supply line is cut – off if necessary.
Maintenance and repair are undertaken.
Conduct safety committee meetings every 3 months or in case of an emergency.
Team members of the safety committee:
NAME
DESIGNATION
CONTACT NO
7.0 EMERGENCY CONTROL CENTRE
For the purpose of handling the emergency, Emergency Control Centre is very much essential. In the factory, Security Office at the Main Entrance is declared as Emergency Control Centre. All activities pertaining to the emergency will be carried out from this centre. The emergency Control Centre will be equipped with
Plant Layout indicating storages of hazardous material and fire fighting equipment and first aid box locations.
Material Safety Data Sheet of all chemicals handled in the premises.
List of all employees with addresses, tel. No., contact person and if possible blood group.
List of important telephone numbers such as police, fire brigade, hospitals, Directorate of Industrial Safety and Health, Pollution Control Board, etc.
A separate list of team members with their addresses and telephone numbers.
The facility of Direct Telephone Line.
Equipment such as Torch, Rope, and necessary Personal Protective Equipment, whistle, etc.
Note pads and pen/pencils to record the messages and record of activities pertaining to emergency
First aid box with proper medicines.
8.0 ASSEMBLY POINT
Assembly point is displayed in front of the main gate and known to everyone which is ensured at the time of safety audit. The area of the assembly point has been set farther from the location of likely hazardous events, where employees, contractors, and visitors must assemble in case of emergency. Up- to date list of pre-designated employees must be available with the Site in charge at the assembly point in case of assembly of the employees. The site in charge shall then do the roll call of the people present so that their presence can be marked.
9.0 ALARM RAISING SYSTEM
The factory Main “Emergency Siren” is located at the main gate. This will be used for raising the alarm and also for “All Clear” signals in case of emergency.
10.0 EMERGENCY RESPONDING PROCEDURE
In case of Fire / Explosion / natural calamity etc., any person noticing it must evaluate the severity of the emergency and he should alert all the factory personnel by activating the Emergency Siren. The emergency siren is activated just by pressing the Emergency Siren push button located at the main gate. Then he immediately reports to the Emergency Control Centre and informs about the Emergency location. As soon as the alarm is heard, the safety team members will contact the Security office at the Main Entrance and the safety team will rush to the Emergency location. The safety Team & other team members will assemble at the assembly point.
11.0 Communication System:
Alarms should be followed by an announcement over the Public Address System or verbally by shouting. In case of failure of alarm system communication should be by the security guard who will make an announcement through the Public Address system. Mobile Phones, landlines, etc could be used as a mode of communication for an emergency. If everything fails a messenger could be used for sending the information.
12.0 Action Plan For Various Emergencies.
A) Fire
Actions to mitigate the emergency
Responsibilityto Respond
Raising emergency alarm
One who observes Fire or explosion
Shut down machines and Main power supply
One who observes Fire or explosion / Prod incharge
Evacuation, Assembly at Assembly Point.
All employees
Fire fighting
All employees
Rescue Operation
All employees
First aid or Hospitalization
All employees
Final Declaration of “All Clear” Situation
MR / CEO
B) Major Spillage of flammable/ hazardous oils
Actions to mitigate the emergency
Responsibilityto Respond
Raising emergency alarm
One who observes the major spill
Switch Off Power Supply of the equipment
Concerned supervisor, Maintenance engineers
Evacuation, Assembly at Assembly Point.
All employees
Isolate & Barricade the area of spill
Security
Control the spillage to avoid spread
DH – PRD
Stop all the work of welding, electrical etc
DH – PRD
Fire fighting
Fire fighting team
Final Declaration of “All Clear” Situation
MR
C) Electric Shock
Actions to mitigate the emergency
Responsibilityto Respond
Switch Off Power Supply of the equipment
Concerned supervisor, Maintenance engineers
Rescue the person.
Concerned supervisor, Maintenance engineers
Call the ambulance, provide first aid
Departmental Head
D) Accidents – Factory (Major)
Actions to mitigate the emergency
Responsibilityto Respond
Contact company doctor/hospital
Departmental Head
Rescue Operation
Safety team
E) Accidents-Transport
Actions to mitigate the emergency
Responsibilityto Respond
Contact Ambulance/ Hospital, provide first aid Inform HR Dept
Inform Police
Concerned Person
HR dept
F) Personal confinement
Actions to mitigate the emergency
Responsibilityto Respond
Call fire brigade
Departmental Head
Raising emergency alarm
One who observes the calamity such as storm, earthquake
G) Natural calamities Such as storm, earthquakes, etc.
Actions to mitigate the emergency
Responsibilityto Respond
Evacuation, Assembly at Assembly Point.
All employees
Raising emergency alarm
One who observes the sabotage, terrorism or civil commotion
Isolate & Barricade if necessary
Security
Fire fighting
All Employees
Rescue Operation
All Employees
Hospitalization
All Employees
Evacuation, Assembly at Assembly Point.
All Employees
Final Declaration of “All Clear” Situation
Chief controller
H) Structure collapse
Actions to mitigate the emergency
Responsibilityto Respond
Raising emergency alarm
One who observes the calamity such as storm, earthquake
Evacuation, Assembly at Assembly Point.
All employees
Isolate & Barricade if necessary,
Security
Rescue Operation,
Rescue team
Hospitalization,
First aid team
Final Declaration of “All Clear” Situation
Chief controller
I) Riots, Arson, Sabotaging (Inside the premises of the organization)
The Security shall isolate the area of Rioting with its total force.
Security In charge
All work should stop immediately. The employees from rest of the premises shall be evacuated immediately. The ambulance should be kept in Stand by to meet any eventually. Inform Hospital immediately to prepare for any emergencies. As soon as police arrives the area of rioting should be handed over to police.
The ambulance should be kept in Stand by to meet any eventually. Inform Hospital immediately to prepare for any emergencies.
HR dept
The gates should be closed and no person and vehicle should be allowed to leave the company premises. Security should man the gates with full force and should prevent entry of any unauthorized person in side the company premises.
Security In charge
In case of more than 8 hours of riot situation the Admin should ensure adequate food and water is available for the employees.
Admin In charge
Once all clear signal is received from the police, normal operation shall resume in the organization
Dept HOD
K) LPG leakage
Actions to mitigate the emergency
Responsibilityto Respond
1. Take immediate steps to stop LPG leakage 2. Stop all operations 3. All out effort should be made to contain the spread of leakage/fire 4. Saving the human shall get priority in comparison to stock/assets. 5. Plant personnel without specific duties should assemble at the nominated place. 6. All vehicles except those required for emergency use should be moved away from the operating area, in orderly manner at pressure –nominated route 7. Depending upon severity, electrical system except for control supplies, utilities, lighting and fire fighting system, should be isolated 8. If the feed to the fire cannot be cut off, the fire must be controlled and not extinguished. 9. Start water at areas involved in or exposed to fire risks. 10. In case of leakage of LPG without fire and inability to stop the flow, take all precautions to avoid source of ignition. 11. Block all roads in the adjacent area and render internal/external support for the purpose if warranted.
Fire Fighting Team
L) Tank Dyke Fire
Actions to mitigate the emergency
Responsibilityto Respond
1. In case fire occurs in the dyke area due to flange leak in manifold area, the fire is to be extinguished with the help of foam. 2. Use of DCP if the fire is small, otherwise use water spray or foam. 3. Cooling of lines /flanges is to continued till incident/site controller gives the instructions to stop. 4. If tank collapses and product is spread in the dyke area with fire. 5. Withdraw manpower in and around the tank dyke area. 6. Use foam monitors of vehicles to spray and spread foam in the affected dyke area If tank dyke area is on fire and full product is in the dyke then water to be used judiciously otherwise flooding of dyke area may cause overflow of oil from the dyke area to open drains.
Fire fighting team
M) Electrical Fire
Actions to mitigate the emergency
Responsibilityto Respond
Disconnection of the electric supply of the affected area.Attempt to extinguish the fire with the help of DCP/CO2 fire extinguishersIf the fire still persists, ensure complete isolation of electric supply of that area and use of water.
Maintenance and fire fighting team
N) Office Fire
Actions to mitigate the emergency
Responsibilityto Respond
Disconnection the electric supply of the affected area.Attempt to extinguish the fire with the help of DCP/CO2 fire extinguishersSave all records from fire.
Office staff and fire fighting team
O) Person on Flames
Actions to mitigate the emergency
Responsibilityto Respond
1) Bring the water gel blanket 2) Open the bag inside the container to remove blanket. If the bag is already open such blanket should not be used for burn victims 3) The blanket can be held as a screen between the victim and the fire 4) If possible lay down the victim and wrap the blanket around the victim. Leave the victim wrapped in blanket and seek medical help
Fire fighting team
P) Food/Water Poisoning
Actions to mitigate the emergency
Responsibilityto Respond
1) Persons observing the symptom should inform the location in charge for assessing the situation 2) Shift in charge should call the doctor and ambulances and also alert all hospitals to meet any exigencies 3) To render first aid and induce vomiting to the affected persons 4) The ambulances and vehicles available should be mobilized to be in readiness to transport large number of people if required Assistant Manager-SHE to report to location in charge for required sanitation and medical assistance.
First Aid team
Q) Bomb Hoax
Actions to mitigate the emergency
Responsibilityto Respond
1) Person noticing on object like bomb, should bring it to the notice of the nearest available officer. 2) The officer should carefully observe the same from a distance and raise alarm 3) The area should cordon off. 4) Police control and fire control to be informed for their arrival and inspection of the area. After the bomb is diffused, all clear siren should be sounded by the watchmen.
Concerned person/ Admin dept
R) Burn –Minor
Actions to mitigate the emergency
Responsibilityto Respond
Pour cool water on the burn area till the burning sensation is reduced.Cover it lightly with a clean cotton cloth.Do not apply butter, oil, ointments or any home remediesGet Medical help
First aid team
S) For Electric shock casualties
Actions to mitigate the emergency
Responsibilityto Respond
Electric shock results in irreversible damage to brain cells followed by deterioration of the other organsRescue and first aidDo first thing first, quickly and without fuss or panic. Switch off the supply if this can be done at once. If not possible, use a dry stick, dry cloth or other non conductor to separate the victim of electrical contact. The rescuer must avoid receiving shock himself be wearing gloves or using a jacket to pull the victim.
First aid team
T) Non Functioning of STP and ETP
Actions to mitigate the emergency
Responsibilityto Respond
In case STP or ETP is not working properly, the abnormality of so should be informed to maintenance department. In case the maintenance department closes the ETP or STP plant, the untreated water should be stored in Sock pit in case of STP and Septic tank in case of ETP. After the STP and ETP starts functioning normally the water from the sock pit and septic tank should be treated before discharge.
ETP/STP operator and Maintenance Dept
12.0 DO’S AND DON’T’S
12.1 All Company Employees
Do’s
Don’t’s
Stop work on getting information or hearing the alarm. Switch off the machines and main power supply. Gather at assembly point. Contact Management Take visitors to safer place.
Do not panic & cause stampede. Do not run and prevent others from doing so. Do not go anywhere else. Do not wait to collect personal belongings.
12.2 VISITORS & CONTRACTORS
After hearing the alarm they will follow the following steps:
Give attention to all instructions.
Stop work. Do not panic.
Do not wait for personal belongings.
Assemble at the assembly point.
Do not go to the emergency site.
Do not spread rumours.
Do not engage in communication systems.
13.0 TRAINING
The employees will be informed about the ‘On–Site Emergency Plan’ in detail, with the help of training programs. For the success of this plan not only training will be organized but mock drills also will be organized a minimum of once a year. Mock drills will help to understand the role to be played by everyone during the emergency. The Core members of the Disaster / Emergency control will be given refresher training at the interval of every One Year.
14.0 MOCK DRILL PROCEDURE
The success of the “On-site emergency plan” is very much dependent on planned and unplanned mock drills. Mock drills help employees to be familiar with their roles and ensure accuracy of the onsite Emergency Plan. Following is the procedure for conducting a Mock drill.
Inform all the employees about mock drill procedures.
Fix the date and time for mock drill.
The mock drill will be monitored by the observer/s not involved in the exercise.
The emergency alarm will be raised.
After hearing the alarm, the Emergency Procedure will be followed. All clear signals will be given after the emergency is over.
Observer/s will note down the activities with respect to the time.
Lacunae observed in the system will be studied carefully.
Records of drills will be maintained.
After each drill, the plan will be thoroughly reviewed to take into account the omissions or shortcomings for improvement.
15.0 Details of liaison arrangement between the Organization:
All the organizations involved in assisting during the emergency were contacted and apprised of the details of the plant, like process; hazardous material handled; likely emergency incidents; steps taken to avoid/reduce risk mitigation methods, resource availability, etc. The details are as follows:
15.1 POLICE
Sr.No
Name of Police Station
Tel.No
15.2 FIRE BRIGADE STATION
SR. no
Fire Station
Tel no
15.3 HOSPITALS AND DOCTORS
Sr.No
Name of Hospital
Tel No
16.0 UPDATING THE PLAN
As and when required, this ‘On–Site Emergency Plan’ will be updated and informed to all. If necessary, after each drill the plan will be thoroughly reviewed to take account of shortcomings.
This is a summary of safety rules and working procedures, which we suggest are the minimum standard practices applicable to all contractor personnel working on XXX facilities. These are the XXX rules and are intended to supplement applicable laws and regulations of the XXX Safety Manual.
0.1 ENVIRONMENT, HEALTH & SAFETY POLICY
XXX intends that its activities will, comply with all relevant statutory and other provisions and all measures will be taken to minimize injury and ill health to its employees and other & stakeholders, who may be affected by its operations. We are committed to the integration of safety and environmental considerations in all areas of corporate activity, including the design and operation of all facilities, and implement a process of continual improvement in this regard. We are also committed to prevent pollution and continuously improve our processes and system to conserve natural resources.
0.2 Responsibility:
Management and supervisory staff have the responsibility for implementing the policy throughout the company, to see that environmental, health and safety considerations are always given priority in the planning and execution of all work.
All employees and contractors are expected to strictly adhere to the above policy.
In their areas, so that work is carried out with minimum risk to themselves, other and environment.
0.3 Approach:
To maintain high technical standards by employing skilled and qualified technical staff and train them for effective performance.
To design, construct and operate all plant, equipment, storage areas, etc. taking into consideration safety and environmental aspects.
To identify and communicate all hazard-related information about our process and raw materials to all employees, neighboring communities, and contractors.
To train employees in firefighting, first aid, use of PPE’s, safe handling of hazardous chemicals and effectively implement ‘on-site’ emergency plan.
To periodically audit safety preparedness, do a risk analysis.
Asst. Manager, EHS shall be available to assist in the implementation of the policy and provide information, advice, and support to employees.
To make adequate financial and technical resources available to allow the policy to be carried out..
1.0IMPLEMENTATION OF EHS AT XXX.
1.1 Following focal areas are addressed by our Environmental Occupation Health and Safety Management system:
Conservation of resources especially Energy, Water, Fuel and Petroleum Products used in processes.
Optimum utilization of energy.
Minimum wastage & optimum utilization of diesel, lubricants, hydraulic oils, water by minimizing its leakage, spillage during storage, recycling and periodic maintenance of machinery.
Upkeep of equipment machinery in good working condition for maintaining their efficiency levels by periodic servicing and checking as per maintenance schedule.
Reduce waste generation in the manufacturing of moldings & sleeves.
Fire, Spillage of chemicals & oil in large quantities, Gas leakage in large quantities are identified as potential foreseeable emergencies in our nature of operations. A separate procedure is in place to address these environmental emergencies. Management Programs are formed in order to make permanent changes in the existing systems. Operating Control Procedures in different departments are implemented to maintain the processes under controlled conditions. These programs & procedures are implemented on the departmental level; any deviations are recorded & taken up in Management Review (Core group) meeting by Management Representative. All employees are aware of the EHS systems and their roles & responsibilities for implementing the same through rigorous training.
Ultimately our system aims at continual improvement. Once the Objectives / Targets are achieved/implemented through Management Programs, new Objectives & targets demanding a higher level of environmental performance will be set & achieved. This journey for continual improvement is ongoing & endless. We have just made the beginning. We are sure that our perseverance, patience, untiring efforts & inner urge shall help us achieve this noble cause of protecting our environment.
2.0 ACTIVITY
These activities are applicable to visitors / contractors / vendors / their employees / associates.
2.1 THE RULES ARE OBLIGATORY TO ALL CONTRACTORS:-
These Safety rules have been circulated for the performance of EHS practices regarding day to day work of the concerned contractor.
These rules in no way relieve / to help a contractor from his obligation under various statutory rules and regulations.
All regulations, codes, and ordinances of the Ministries and local Authority regarding EHS shall be obligatory to the contractors.
The contractor should have a valid License with WC Policy as per Govt. rule & regulations amended time to time before mobilization/starting job at the site.
The contractor will be solely responsible for the safety of his employee.
3.0 GENERAL REQUIREMENTS:
No Supervisor/worker below 18 years (verbal clarification will not acceptable).
Smoking, carrying matchbox, lighter, mobile and other types of electronic types of equipment capable to generate the ignition source is strictly prohibited.
Chewing tobacco, Supari, Gutka, other habitual material, and spitting is strictly prohibited inside the premises.
The contractor will provide proper drinking water & sanitation facilities to the worker.
Emergency exit should be used only in the events of the emergency.
Smoking is strictly prohibited in the XXX Premises.
Material, types of equipment, tools, the debris of contractors should not be stored overhead and near doors/emergency exists. No loose material should be left in the work area. These must be stored at the place provided by the concerned XXX representative.
All types of waste generated in the XXX premises must be segregated & disposed of as per the directives of concerned XXX representative.
Diesel / Petrol / any type of chemical / chemically contaminated waste should not be disposed of in water drain/washbasin/ any other place in XXX premises.
Housekeeping should be maintained.
Welding/gas cutting work should not be done without a proper permit on XXX premises.
4.0 EHS MANAGEMENT:-
The contractor shall demonstrate a strong commitment to XXX’s EHS Policy.
Be responsible for all aspects of contractor EHS performance & ensuring that his site supervisory person is competent and has the authority to implement the EHS system properly & to follow EHS practices and procedures.
The contractor should have the obligation to minimize the injuries & abate pollution, minimize loss of material. For that, he should take maximum precautions and utilize his own past experience at the time of execution.
The Machineries at the site are maintained in such a manner that it does not pollute the air/water and soil of the site.
Attain in-house / outside training program, those arranged by EHS Dept.
The contractor shall immediately report any oil, chemical, etc. spill to the company.
The contractor shall periodically assess noise levels from operation & install sound absorption and mitigation devices.
Tank/fuel vessels should have secondary containment with a retention capacity equal to 110% of the largest tank.
The contractors should always keep our concern worksite/area neat, clean & free from physical hazards.
Waste materials always keep aside to avoid interference for working & chances of the accident at site and segregation as per standard practices.
The contractor shall be responsible for disposing of waste at their own cost. If not disposed of in a proper manner, XXX will be disposing of & deducting disposal cost from the contractor bill.
The contractor shall make his own arrangement of an emergency vehicle at the site.
In case of an accident, the person should be immediately sent to dispensary / OHC / nearest Hospital for medical help & accident report in the proper format, duly signed by an authorized representative to Safety Officer / HR Dept. without fails. Also, take care of medical treatment/compensation whatsoever as per industrial rule.
The work area shall be maintained in a neat and orderly manner. Aisles, emergency Exits & controls must be kept free from obstruction at all times.
5.0 PPE:-
Approved Safety helmet & Safety shoes are mandatory in premises to employees & supervisors of the contractors depending on their work.
Contractors should ensure that all the employees are equipped with proper protective equipment for the work and they are entrusted with.
PPE should always be meeting the appropriate standards, is to be provided by the contractor (BS / ANSI – American National Institute)
Proper training for the use and care of such Personal Protective Equipment to be given by the contractor to all workforces.
Head protection: Safety Helmet
Eye & Face protection: Safety Goggle with side shield & face shield
Foot protection: Safety Shoes/gumboot
Hand protection: Hand gloves (work related compatible material).
Fall protection: Full body harness
Hearing protection: Earplug / Earmuff
Dust mask: Approved for protection from Dust inhalation (DGMS/CE/NIOSH)
6.0 CLOTHING & OTHER APPAREL:-
Clothing suitable for the job shall be worn.
Long pants and shirts or coveralls should be worn at all times during perform the work.
Ragged or loose clothing and jewelry (ring, watch, necklaces, etc.) are not to be worn when operating equipment.
Any clothing that becomes saturated with petroleum / hazardous chemicals should be promptly removed or changed.
Wearing loose clothes are not allowed near rotating parts /equipment.
7.0 WORK PERMIT:-
The contractor should take work Permit from the concerned Dept. for any activity.
At every time contractor should have a valid permit for work at the site, which is also signed by standby Supervisor, concern HOD & concerned Plant Head.
Safety Officer Sign is required on Hot, Height, Vessel entry & civil permit.
Dept. supervisor/engineer should be responsible for monitoring job & site till completion & strictly follow the precautions of related permit.
The electrical permit under control of Electrical HOD / Unit Head.
Contractor shall provide proper illumination in their respective work area after sunset, also ensured safe working when natural daylight may not be adequate for clear visibility.
After completion of job Supervisor should close permit, file the record copy.
XXX reserves its right to suspend the work in the event of the contractor not complying with the rules or instructions with regard to Safety practices for which no claim of any kind will be entertained.
8.0 Vehicles:
The vehicle should be parked in the parking area or as per the instruction of the security officer.
U.C. Of vehicle & driving license of the driver should be valid & should be shown to security officer during entry of XXX, otherwise, entry of the vehicle will be refused.
The vehicle should not have diesel/petrol/ water leakage.
Loading dock should be used during loading or unloading only. Afterward, the vehicle should be removed from loading dock & should be parked at the parking area or as per the instruction of the security officer.
Maintenance work for the vehicle is not allowed inside the XXX Premises.
Washing of the vehicle is not allowed inside the XXX Premises.
Contractors should not park their vehicle in such a way that it will be a hindrance to the smooth flow of traffic in the premises.
Jumping on or off trucks, automobiles or another moving vehicle is prohibited. Men should wait until the vehicle stops before attempting to enter or leave.
9.0 Accident & Emergencies:
In case of an emergency stop the work, keep equipment in a safe location and gather near assembly point. These instructions should be followed in case of accidents/emergencies.
9.1 Personnel Protection:
The person should wear goggles giving complete protection to the eyes.
The person should wear hand gloves to handle the material.
9.2 Actions by the Driver In Case of Accidents:
Stop the engine.
No naked lights, no smoking.
Mark roads and warn other users or passers-by
Absorb leaking liquid with earth or similar material
9.3 Actions By The Driver In Case of fire:
Use a fire extinguisher only for smaller fire in connection with the vehicle. Do not fight a fire:
Which can increase with loaded material?
Which cannot be controlled with the fire extinguisher?
Inform immediately to the local fire department immediately.
9.4 First Aid:
If the substance has gone into eyes, immediately wash the eyes with plenty of water for several minutes & take help of the nearest doctor.
In case of burns immediately cool affected the skin as long as possible with cold water.
Seek medical attention when anyone has symptoms apparently due to inhalation, swallowing or contact with skin or eyes or following inhalation of fumes produced by the fire.
Contractors should arrange own First Aid box at the work site & they should maintain the required material in it & take proper care of injured persons.
9.5 Laisioning with XXX:
All fires, serious injury-accidents and any chemical spillage in large quantities should be reported immediately to intercom telephone numbers: 000,000,000,000,000,000 Representative of XXX will provide you required help & will contact emergency services for you (if required) & direct them on site/location during an emergency.
10.0 Guide to Disposal of waste
There are two types of waste generated in the factory. Solid waste and hazardous waste.
10.1 Solid Waste:
Waste, which is not contaminated by oil, paint, powder, ink, and any chemical, is considered solid waste. Examples of solid waste are paper waste, polybag/polythene sheet, plastic waste, metal waste, wooden waste, empty drums, etc.
10.2 Hazardous Waste:
Waste, which is contaminated with oil, paint, and any chemical, is considered hazardous waste. Examples of hazardous waste are contaminated cotton/paper/plastic/polybag, sheet / wooden waste, hand gloves, mask, containers. Empty drums of oil, paint, chemicals, paint, ink, etc.
10.3 Trade Effluent:
Any water, pretreatment soln. bath, plating chemical, used in process when disposed of, it becomes trade effluent. MPCB has given norms for trade effluent prior to disposal. The examples of trade effluent are water used in bath for pre-treatment, water, pretreatment soln. bath, plating chemical, water used to clean the components, etc. This trade effluent to be treated in a comprehensive treatment system consisting of primary/secondary and/or tertiary treatment as is warranted (if required) so as to achieve the quality of the treated effluent to the following standards:
1) PH Between 5.5 to 9.0
2) Suspended Solids Not to exceed 100 mg/l
3) BOD 3days 27 Deg. C. Not to exceed 100 mg/l
4) COD Not to exceed 250 mg/l
5) Oil & Grease Not to exceed 10 mg/l
The water can be tested at an authorized lab. If the effluent treatment system is not available in the house then these effluents can be treated at the common hazardous waste disposal facility. For further details and guidance for effluent testing, treatment (if required) & disposal you can contact the concerned purchase executive or management representative of XXX.
10.4 Storage & collection waste:
Solid waste and hazardous waste should be collected & stored in separate bins. The main reason for storing this waste separately is if mixed all solid waste will also become hazardous waste.
10.5 Disposal method:
Solid waste should be given to off-site recycler for recycling.
10.5.1 Disposal method of oil:
Oil should be given to Ministries authorized recycler who can recycle the oil.
10.5.2 Disposal method of hazardous / contaminated waste:
Hazardous waste to be incinerated at the Ministries authorized site. For further details and guidance for waste disposal, you can contact the concerned purchase executive or management representative of XXX.
10.5.3 Operational criteria:
Avoid spillage of paint, powder, water, oil, chemicals, etc.
Keep containers of paint, powder, oil, chemicals closed and the lid secured when not in use.
Store paint, powder, oil, and chemicals at the designated place as per respective material safety data sheet. (MSDS)
In case of spillage, arrest spill immediately by soaking contents with rags, cotton waste or sawdust. Clean and keep the contaminated material at the designated place.
Do not allow paint, powder, oil, and chemicals to spill or drain in water or stormwater drain.
Use bare minimum quantity (avoid excessive use) of oil for lubrication, cotton waste.
Study MSDS for use of PPE, ensure the use of Personnel protective equipment (PPE) such as hand gloves, mask, etc. as mentioned in MSDS.
While painting/powder coating ensures that proper process parameters are set as recommended by the manufacturer or as per process validation to avoid defects.
Ensure appropriately skilled operators are employed for respective operations.
Ensure that paints/chemicals are used before the expiry date. If it is expired do not use & sent it back to the manufacturer.
Store hazardous waste and solid waste in different bins at respective places. Ensure hazardous waste & solid wastes are not mixed.
Dispose of solid and hazardous waste as per the guidelines are given above.
Ensure following while handling & storage of hazardous waste.
Do not store hazardous waste for more than 90 days.
Store all hazardous waste in the designated place in closed container/drum & Keep the container closed with a lid during storage.
Use properly cleaned container only for the storage of hazardous waste.
Mark the container holding hazardous waste as “HAZARDOUS WASTE” in both English & local language & put danger sign on it.
Ensure following while disposal of hazardous waste.
For disposal of hazardous waste use transporter who is authorized to handle hazardous waste. Generally, waste management vendors send their transporter to collect hazardous waste.
During disposal of hazardous waste prepare hazardous waste manifest. Explain the use of TREM card & give its copy to the transporter
Verify containers/boxes/cartons offered for transportation for its suitability & mark / label them with type & category of waste in it.
Instruct transporter to deliver hazardous waste without any delay to the designated facility.
11.0 SCAFFOLDING:-
While working at heights adequate scaffolding & staging should be used.
Scaffoldings should be of sound material, securely fastened and should be capable of supporting 4 times the combined weight of men and material who will be working on them.
Wooden planks used in scaffoldings should not be less than 10” wide, 2” thick and should not extend beyond the outer supports by more than 12” nor less than 6”.
Railing, guarding and toe boards should be provided in all scaffoldings, which are 2 meters or more in height.
12.0 OVERHEAD WORK / WORKING AT HEIGHT:-
Always uses, to protect from serious injuries due to fall from a height, if the concerned worker will be performing work at height – above 1.8 meter. From zero level or more is mandatory (If there is no Permanent platform and railing available). No half body safety belts are allowed.
In critical situation use, two lifelines / generate the firm supports / necessary arrangement for hook up the lifeline at elevated levels. In the absence of such a structure, seek assistance from the Plant / Building.
Common life-line shall be used wherever linear movement at height is required.
13.0 ERECTION:
This is prerequisites – workman engaged for working at height activities must not be suffering from Hypertension, Diabetes, Vertigo, and Epilepsy.
Erecting/lifting machinery should have a valid test certificate.
Only qualified and authorized employees should be allowed to operate mobile cranes and other hoisting equipment.
Before operating cranes or hoisting equipment, the operator should sound a warning and he should accept signals only from one person for starting the work of raising, lowering and swinging loads.
The only authorized supervisor should instruct to the crane operator.
Workmen in charge of the working squad should be responsible for the safe loading and use of ropes, chains, slings, jacks, skids, and other hoisting and lifting apparatus according to their Safe Working Load (SWL), use of defective tool & tackles not allowed.
No persons shall be allowed to stand, walk or work beneath/under any suspended load or erecting equipment.
The operator should stop crane immediately if STOP signal from anyone.
Guide rope must be used for guiding & at time of lifting any loads.
Don’t release the load on chain block, crane and hydra for a long time.
Hanging equipment around operating units is prohibited at all times.
14.0 LIFTING MACHINE / LIFTING TOOLS & TACKLE:-
Valid test certificate of tool & tackles submits to concern Dept. / or shall be thoroughly examined & tested before taking in to use at least once in a year by a competent person.
Lifting tackle: Chain sling, rope sling, hook, shackle, swivel, coupling, socket, clamp, tray or similar appliances using for lifting load or loads by use of lifting machine.
Defective or worn out tools & tackles ropes should never be used even if the loads appear small. Always used standard & certified tool & tackles.
New links should be inserted by competent persons.
Check thoroughly all lifting tools, tackles, ropes & slings before putting them to use.
When applying U Bolts and clips, to be checked adequate number.
15.0 NATURAL / SYNTHETIC / FIBER ROPES:–
The rope should have properly cared and the following precautions should be taken. (Cotton, Jute, Nylon rope not allowed)
The rope should not pass over sharp edges; kinked ropes should not be used.
The rope should not drag on the ground unnecessarily. Using too small sheaves should be avoided.
The rope should not be permitted to slip on winch drum or moving drums.
Do not tie knots where splices should be used.
Ropes should not be allowed to soak in the oil and exposed to acid or other
Corrosive substances. They should be washed and dried.
16.0 MATERIAL AT HEIGHT:-
Not to throw any material from any height. In the event, to be followed standard procedure. (Instruct to all other concerned; the particular area must be barricaded to keep other persons in the clear distance, also to be kept supervisor for monitoring till completion of the job.)
Open machinery is not allowed at the work site, proper guarding is required.
Keep all your hand tools such as chisels hammers. Files punch spanners wrenches etc. in good condition at all time.
Keep wrenches spanners & other tools securely so that they will not slip at the time of execution of the job. Also do not leave Tools and materials on an elevated position, if there is a possibility of falling from a height.
Do not use tools for another purpose, for which they were designed.
17.0 ELECTRICAL CONNECTIONS:-
XXX giving single point connection to every contractor. He should generate an extension board for further distribution.
Only qualified persons of the contractor should undertake electrical works/repairs. If required take help of XXX electrical team.
The contractors should take precautions to prevent tripping hazards caused by defective equipment and welding lines etc.
The contractors should arrange required fire extinguisher at the site for emergency uses.
Bare wire for connection/extension not allowed on premises.
Provide ELCB for main extension board to protect others.
Be careful about the loose connection.
Take approval from electrical HOD for temporary electrical connections, he should ensure cables quality /earthing/grounding arrangement, etc.
18.0 ELECTRICAL WORK:-
Treat all circuits as LIVE unless ensured to be DEAD.
XXX system to be followed for better communication.
All electric hand lamp/bulbs should have a protective wire mesh guard.
A clear indication of ON-OFF switches will must on related equipment & use appropriate Amp switch. Also, use approved PPE for electrical work.
Make sure the cord will be protected against abuses and possible damage, from welding sparks, hot surfaces, and sharp edges.
Ladder used for electric equipment should be of non-metallic construction so as not to be a conductor of electricity.
If any cables passing through an aisle or passage make sure it is raised to at least 2 meters above the ground, to avoid damage.
Immediately change damaged cables, don’t wait for an accident/incident.
Regularly check test lamp, working condition of electrical tools by a competent / authorized supervisor.
Identify electrical hazards, repair or report immediately to concerned or XXX electrical Dept. for help or rectification.
In flameproof area always use flameproof tools.
Electrical tools provide with ground wire, top pins, and sockets and should have proper gland packing.
Ensure, the extension cord is free from the cut, damage insulation links or joints. Cable marker to be provided for underground cables.
Ensure easy access to put OFF the supply in case of emergency. In case of short circuit /fire/equipment caught fire.
Extinguished electrical fire with the CO2 extinguisher, in absence of CO2 to be used DCP extinguisher (aim is to extinguish the fire).
Use warning instruction boards while working on Feeder / Panel.
MEN ARE WORKING
DO NOT PUT ON
19.0 GRINDING / SHEARING MACHINE:-
The grinding/ Shearing machine always maintain in good condition.
Grinding / Shearing machine should have protective wheel guard.
Top pin required for connection & extension purpose from extension board, avoid joints for cable & chances of a short circuit in premises.
Grinder operator should have safety goggle, leather hand gloves, and safety shoes. Use proper ISI / approved grinding wheels all the time.
The skilled employee should operate grinder / Shearing & barricade the front area to restrict sparks. Shifted flammable material from the site.
All portable power tools such as drills & grinders etc., which are operated electrically, should be thoroughly inspected before making use of them.
20.0 CIVIL WORK:-
Before starting excavation, Civil Dept. should take clearance of Electrical, Mechanical & Safety Dept. for the absence of underground cable & lines.
Use MS pipe scaffolding with necessary clamping. Bamboo-jute scaffolding & use of empty drums for workbenches is strictly prohibited.
Barricade the area before excavation/shifting of material / shuttering / deshuttering & work at height.
Concerned Dept. should give maximum & enough precautions at the time of working to avoid accident/incident.
21.0 WELDING WORK:-
Adequate precautions should be taken during welding (arc/argon) or gas cutting against hazards such as electric shocks, burns, fumes, fires, explosion and arc eyes, etc.
Welding machine shall be in good condition (should have an ON-OFF switch, Amp meter, Voltmeter, proper connector, copper cable for earthing & welding holder, lugs for fitting cables, Amp adjustable in good condition (remotely operated is also acceptable), holder for connecting earthing).
Use armored cable up to welding machine with the top pin.
Always use safety shoes, Leather hand gloves, welding shield / proper tint goggle, safety harness depending on work situation (always be careful).
To carry out gas cutting or welding work beyond 15 Mtr. from the place where any hazardous/flammable material is kept.
During welding, the earth should be given directly at the job, no short-cut allowed.
The welder should be qualified/skilled & perform his work independently, not depend on another employee for adjusting current and so on.
To be provided with adequate ventilation, if work performs in confined spaces.
When welding or gas cutting in elevated positions, precautions should be taken to prevent sparks or hot metal slag falling below, where the other employees are working / flammable material stacked below.
Make a practice to collect the burnt welding rod pieces in drum & handover to dept. for further disposal.
Workshop: Before welding or cutting a pipe, tank or container, which contain flammable material, it should be thoroughly cleaned and gas free and if necessary ‘Hot Work Permit’ should be obtained.
Welding booth should be located at downwind direction to avoid exposure of toxic gas to others.
Use required PPE’s & warned cloth should be free from oil and grease.
Goggles should be worn while chipping the welding slag.
22.0 LADDER:-
Safety goggle, welding shield, hand gloves (Leather– Hot work, Cotton– Material handling, Rubber– acid & alkali, Cryogenic – LPG / IB) to be used whenever necessary.
The contractor should have a proper ladder. Wooden / bamboo / torr-steel ladder not allowed on premises.
23.0 PAINTING WORK:-
The painting contractor should follow all due precautions of painting standards / working at height/cleaning/ protecting equipment/disposal of waste.
In confined spaces, workers shall be protected with approved mask/airline respirators / tight fitting rubber mask (especially for spray painting).
The contractor can use approved Botwin chair / Zoola at time of painting at an elevated level, with required accessories.
Don’t do painting below the permitted hot work, or above the other work.
Generate pipe scaffolding wherever required.
Compressed gas shall not be used for cleaning of clothing / or part of the body. If used for another cleaning, the discharge shall not exceed thirty-30 psi and eye protection shall be warned.
24.0 COMPRESSED GAS CYLINDERS / GAS CUTTING:-
We shall be allowed only Acetylene / Metal Cutting Gas cylinder in our premises for cutting purpose & issuing a permit for the same.
Cylinders should have protective valve cap if it is in use / when being transported / empty & spares kept in the shed.
Cylinders identification on the basis of the standard color code of GC Rules.
Use XXX approved cutting torch, Regulator & hoses for cutting set & must be inspecting frequently (Hoses: Red–Flammable gas & Blue –Oxygen)
Provide nRV and flashback arrester cylinders for to protect the cylinder from flashback & backfire.
Hosepipe and another accessory to be connected with proper clamps.
Acetylene or Liquid compressed Gas cylinder shall never be used in the horizontal position, as the liquid may be forced out through hose causing a Fire hazard/ explosion.
Use proper trolley for shifting/carrying cylinder, rolling and carrying on the shoulder to be avoided.
Compressed gas cylinder shall be stored in the upright position & secured with chain in a shed. Flammable & non-flammable keep separately.
Compressed gas cylinder shall be returned immediately to a suitable storage area after use. They shall not be permitted to lie around the work site
The only qualified/skilled worker should do the cutting work.
The gas cutting torch must be lighted by means of friction lighter.
The gas cylinder should be placed in locations where sparks or flames from
Leather hand gloves & goggle mandatory at the time of performing work.
If the cylinder is in use, cylinders valve-key must be placed on valve spindle.
25.0 OTHER WORKS:-
Material handling contractor should take utmost care of our employees, avoid exposure, skin contact & working in the chemical exposed area,
To minimize risk to employees and others,
Not creating new hazards at the site, for that, he should take maximum care,
Abate pollution.
26.0 PENALTIES:-
In case of damage to property due to lapses by the contractor, XXX Management has reserved the right of necessary actions.
A penalty of Rs. 10, 00,000 shall be levied for every fatal accident and Rs.2, 00,000 for every loss time injury occurring during the course of the execution of the said contract.
Penalties for the non-compliance of safety regulations will be levied as under: If any person found violating the safety rules he will be issued a warning, mentioning the name of workmen name of the contractor, dept. / location. Any workmen found violating 3 times will not be allowed to enter the premises/site in the future.
Hiding of disability/accident will result in a penalty of 25% of the contract value.
To threaten / bullying to XXX / other contractor employees said workmen will not be allowed to enter the premises/site in the future.
TYPE OF OFFENSE
PENAL CLAUSE
Not wearing helmets / safety shoes / welding goggles / shield / apron / safety goggles / hand gloves / non standard practices.
First Offence- Warning Note with a fine of KWD. 200/-
Second offense- Fine of KWD. 1000/- & action for termination of the job of concerned supervisor/contractor/ workmen.
Nonuse of full body harness / other life-saving safety gear / unguarded tools & machinery / Electrical gloves / Electrical safety shoes / No cordon off the area at the time throwing material from height / no use of safety net / unsafe working which may tend to fatal events / violating the permit conditions.
First Offence- Warning Note with a fine of KWD. 100/-
Second offense- Action for the concerned supervisor/workmen for termination of his job and a fine of KWD. 1000/-.
Contractor / Vendor / Their Employee’s Acknowledgement:
I have read, understood and agreed to abide by Environmental, Health And Safety Requirement and Do’s & Dont’s of XXX.
Name:
Signature:
Name of Company: Date:
Trainer’s Acknowledgement:
The above-named employee was trained to understand and abide by the Environmental Policy and Dos & Dont’s of XXX.
Name:
Signature:
Name of Company: Date:
Note: XXX representative will train Vendors & Contractors whereas Contractors & Vendors will be responsible to train their employees prior to arriving at XXX.