OCP of Monitoring And Controlling Of Spillages And Leakages Of All Type Of Oil, Coolant, And Water

1.PURPOSE: To control spillages and leakages of all types of oil, water, and coolant

2. SCOPE: This work instruction is applicable to all departments

3. RESPONSIBILITY: Departmental HOD

4. INSTRUCTIONS:

  1. Ensure the effective preventive maintenance of pipelines, Drainage, and Taps.
  2. If the leakage of oil informs about leakage to the maintenance supervisor.
  3. Check gravity of leak physically.
  4. If the gravity of the leak found more, immediately close the valve and inform the charge of maintenance immediately.
  5. If necessary stop processing.
  6. Start work after arresting leakage completely.
  7. Collect leaked oils in containers and clean the area.
  8. Avoid parking in the leakage area.
  9. Do not allow employees to pass on through leaked areas to avoid slippage.
  10. If leakage from the waterline, carry out a survey to identify water leakages from Pipelines.
  11. Take corrective measures considering survey reports and arrest leakages.
  12. If small quantity leakage occurs arrest it immediately.
  13. If the gravity of the leak found more, immediately close the valve and inform to maintenance in charge.
  14. If necessary stop processing.
  15. Start work after arresting leakage completely.

5. RELATED RECORDS:
Preventive Maintenance records

6. CHECKING, CORRECTIVE AND PREVENTIVE ACTION:

In charge, Admin shall ensure implementation of the above procedure. In case of any deviation, initiate corrective and preventive action.

Leave a Reply